Power-Up: Dual Wind Turbines and Modular Blades
First up, Aerodyn Consulting’s patent for a single point mooring system with dual wind turbines. This concept is only being utilized by MingYang for their OceanX wind turbine so far, but it’s promising. Then Newtech Group’s method for connecting modular wind turbine blades, which could make the concept more viable. Finally, a method for keeping your dogs ears out of their food.
Sign up now for Uptime Tech News, our weekly email update on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on Facebook, YouTube, Twitter, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary Barnes’ YouTube channel here. Have a question we can answer on the show? Email us!
Pardalote Consulting – https://www.pardaloteconsulting.com
Weather Guard Lightning Tech – www.weatherguardwind.com
Intelstor – https://www.intelstor.com
Allen Hall: Welcome to Power Up, the Uptime podcast focused on the new, hot off the press technology that can change the world. Follow along with me, Allen Hall, and IntelStor’s Phil Totaro, as we discuss the weird, the wild, and the game changing ideas that will charge your energy future.
Phil, another busy week in the ID and patent world. And we’re going to start off with the single point mooring wind turbine with two wind energy conversion units. That’s a complicated name for something that seems rather simple from Aerodyn Consulting over in Singapore. And this idea has been implemented by MinYang and we’ve seen this, I think it’s called OceanX, where they have two independent turbines on a platform.
a master controller for the two and it’s floating and it points itself on a single mooring system But there’s more details to that you want to explain what else they have going on in this idea.
Philip Totaro: Yeah, so this this is a pretty complicated and but clever idea And I actually want to take a step back and talk about the fact that nobody else in the industry at this point is using this technology other than Ming Yang, who’s licensed the design from, from Aerodyn.
And, and again, what this does is it’s going to ensure that. Basically, the, the platform that has these two counter rotating turbines on it doesn’t basically kind of yaw itself or shake itself apart from, from having the having the both rotors pointed in, in different directions.
Directions that they shouldn’t be pointed in. So the mooring system is kind of helping with with that to an extent. But it’s also ensuring that the entire platform is able to yaw into into the wind in a way that’s going to be favorable, including the typhoon that this thing actually just survived over in China.
So when they deployed this prototype, it’s, in a typhoon prone area. And it seems like this single mooring system did his job pretty well.
Joel Saxum: Yeah, the single point mooring is not a new concept, right? It’s just with this patent, it’s filed with the addition of the twin rotor and how that thing works together.
But single point mooring has been used offshore and oil and gas world for a very long time. There’s a, There’s a type of vessel called an FPSO. It’s a floating production and storage and offloading facility. But these things are massive. If you’ve ever seen an offshore, what they, it looks like an offshore oil rig.
They look like a big ship, but usually they aren’t powered or anything. They’re drug out there by tugs and they’re hooked up to what is called the single point mooring system. And that single point mooring system is a way of affixing that structure topside to one spot and then it can rotate around it.
in production and one of the downfalls of this this setup for operations and maintenance is not so much with this ming yang machine because it’s a 16 megawatt machine it’s a big big thing but if you have to put a lot of these out there a single point more Needs to be anchored off in usually the four cardinal directions.
Sometimes they do six. So you end up with a lot of lines and a lot of anchors coming off of this single point more. So there’s a lot of work to be done to get these things out into position. ’cause you have to do geotechnical investigations. All the anchors go in these kind of things. A lot of anchor lines, chain lines to get ’em.
to get them in place. Now, that being said, these processes have been done many times in the offshore world. So the knowledge of how to install a single point mooring system is there. It’s pretty common. You’re not reinventing the wheel to get this done. And they’re robust. That’s one of the reasons they use them for these massive SPF, SPF PSOs.
They can be 1300 feet long. Those ships can and weigh hundreds of tons. So, It proved itself in the typhoon that just came through in that part of the world. And I think that it’s a good design, it’s a robust design, and you’re not going to be reinventing the wheel to get it installed offshore.
Philip Totaro: At this point, Ming Yang, as I mentioned, is the only company that’s utilizing this.
So this patent is kind of a purely defensive thing for them, just protecting their little corner of the world. But the fact that this technology has proven itself to be kind of typhoon resistant, so to speak this could encourage more companies to go talk to Eridan about licensing this technology and utilizing it in, in other markets where, floating platforms are, are likely to become more prevalent, including places like South Korea.
And potentially even Brazil.
Allen Hall: One of the dreams in the blade world is to be able to make modular blade sections and allow you to make sorter sections, transport them, and then maybe even assemble them on site. Well, this next idea comes from the new tech group over in China for a cord wise segment connection structure for wind turbine blades.
And to simplify this a little bit, the they’re building the blade in roughly three sections of leading it, a trailing edge, and then a Sort of a box section in the middle. But Phil, the key to this idea is how they’re attaching all the pieces together.
Philip Totaro: Yeah. And it’s kind of interesting. And I made the comment off air that this seems very similar to how you already kind of bond and attach a shear clip.
For those that aren’t familiar, this is basically a part of the blade that goes into what we call the shear web. So it’s a structural beam. Usually towards the, the back end of, of the blade and the, the trailing edge of the blade away from, the, the, what Allen just mentioned, the, the box beam section or your, your either single or dual vertical spars and vertical supports.
So, The, the interesting thing about this is it’s, it’s maybe kind of combining a couple ideas and while that usually doesn’t sound very exciting to, engineers or even, patent office reviewers, what they Are able to do with concepts like this, where you’re combining kind of preexisting technologies is say, and explain that, Hey, we’re doing something in a new way and that’s still valid and viable to be able to go get a patent on whether or not this technology is going to revolutionize the market.
We’ll see. The one thing I can say though, is in China, the reason that they’ve probably developed this is because you’re now seeing blades that are at a minimum. meters in length, just the blade. And some of these rotors for onshore turbines are now going up to like, And I’ll call it 230 meters rotor diameter.
So there, you, like I said, you’re talking about blades that are anywhere from 85 up to, potentially 120 meters in, in length. And you’re, you’re going to need, new technologies and new ways of assembly potentially to, to be able to address that those kind of logistical challenges.
Joel Saxum: So what this aims to do is solve some of the structural issues in the sealing up of these blades in a modularized fashion, if you can build them on site The validity of it and the reality of it is, is what, what I’ve heard and what we’ve seen on root cause analysis studies and stuff for modularized blades right now is the technology’s just not quite ready.
So maybe this can get some of these projects down the road and over some of the hurdles that we have and make that a reality.
Philip Totaro: And, and that’s a good point, Joel, because a lot of what we’ve seen for modular blades in the past was, was, bolted joint connections that tends not to work that well. You get fatigue failure and other things that, that happen.
This is literally a, a means for assembling a modular blade utilizing again, kind of the same type of bonding methods that you would use in a factory controlled environment, it’s just whether or not you can have that same level of quality control out in the field when you’re trying to put together these little bonded sections of, of blades.
Allen Hall: And our last idea of the week is a really useful device to keep your ears from falling into your food. Now, most people don’t have that problem, but your four legged friends probably do, particularly if you’re a poodle, that when you reach down into your bowl to eat your dinner, your ears flop around into your food.
So this device rolls over the poodle’s ears and wraps around the back of its head to keep its ears up and away from the dinner bowl. Now, Phil, come on. This is a really good idea. There’s a lot of poodles with this problem. I’ll tell you what, I,
Joel Saxum: I’m gonna agree. It’s a useful idea. And I’m here to tell you, if you try to put this on, on my dog, Yogi, at dinner time, you’re gonna lose a finger.
This is not gonna happen. This is not gonna happen while there’s food ready in the bowl. She’s not gonna go down with it. You’re gonna have to just let it go and use a rag to clean off the ears, or in her case, her chin beard.
Philip Totaro: Which is, you know what, Joel? That may be another patent for another day.
https://weatherguardwind.com/dual-wind-turbines-modular-blades/
Renewable Energy
Poverty in the United States
There is no doubt that poverty, ignorance, intolerance, and support of criminal tyrants are deeply interconnected. It’s a shame that nothing can be done to help these people.
Renewable Energy
Choosing the Right Commercial Solar System Size for Business
Renewable Energy
UK Awards 8.4 GW Offshore, US Allows Offshore Construction
Weather Guard Lightning Tech

UK Awards 8.4 GW Offshore, US Allows Offshore Construction
Allen, Joel, Rosemary, and Yolanda cover major offshore wind developments on both sides of the Atlantic. In the US, Ørsted’s Revolution Wind won a court victory allowing construction to resume after the Trump administration’s suspension. Meanwhile, the UK awarded contracts for 8.4 gigawatts of new offshore capacity in the largest auction in European history, with RWE securing nearly 7 gigawatts. Plus Canada’s Nova Scotia announces ambitious 40 gigawatt offshore wind plans, and the crew discusses the ongoing Denmark-Greenland tensions with the US administration.
Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us!
The Uptime Wind Energy Podcast brought to you by Strike Tape, protecting thousands of wind turbines from lightning damage worldwide. Visit strike tape.com. And now your hosts, Alan Hall, Rosemary Barnes, Joel Saxon and Yolanda Padron. Welcome to the Uptime Wind Energy Podcast. I’m Allen Hall, along with Yolanda, Joel and Rosie.
Boy, a lot of action in the US courts. And as you know, for weeks, American offshore wind has been holding its breath and a lot of people’s jobs are at stake right now. The Trump administration suspended, uh, five major projects on December 22nd, and still they’re still citing national security concerns.
Billions of dollars are really in balance here. Construction vessels for most of these. Sites are just doing nothing at the minute, but the courts are stepping in and Sted won a [00:01:00] key victory when the federal judge allowed its revolution wind project off the coast of Rhode Island to resume construction immediately.
So everybody’s excited there and it does sound like Osted is trying to finish that project as fast as they can. And Ecuador and Dominion Energy, which are two of the other bigger projects, are fighting similar battles. Ecuador is supposed to hear in the next couple of days as we’re recording. Uh, but the message is pretty clear from developers.
They have invested too much to walk away, and if they get an opportunity to wrap these projects up quickly. They are going to do it now. Joel, before the show, we were talking about vineyard wind and vineyard. Wind was on hold, and I think it, it may not even be on hold right now, I have to go back and look.
But when they were put on hold, uh, the question was, the turbines that were operating, were they able to continue operating? And the answer initially I thought was no. But it was yes, the, the turbines that were [00:02:00] producing power. We’re allowed to continue to produce powers. What was in the balance were the remaining turbines that were still being installed or, uh, being upgraded.
So there’s, there’s a lot going on right now, but it does seem like, and back to your earlier point, Joel, before we start talking and maybe you can discuss this, we, there is an offshore wind farm called Block Island really closely all these other wind farms, and it’s been there for four or five years at this point.
No one’s said anything about that wind farm.
Speaker: I think it’s been there, to be honest with you, since like 2016 or 17. It’s been there a long time. Is it that old? Yeah, yeah, yeah, yeah. So when we were talk, when we’ve been talking through and it gets lost in the shuffle and it shouldn’t, because that’s really the first offshore wind farm in the United States.
We keep talking about all these big, you know, utility scale massive things, but that is a utility scale wind farm as well. There’s fi, correct me if I’m wrong, Yolanda, is it five turbos or six? It’s five. Their decent sized turbines are sitting on jackets. They’re just, uh, they’re, they’re only a couple miles offshore.
They’re not way offshore. But throughout all of these issues that we’ve had, um, with [00:03:00] these injunctions and stopping construction and stopping this and reviewing permits and all these things, block Island has just been spinning, producing power, uh, for the locals there off the coast of Rhode Island. So we.
What were our, the question was is, okay, all these other wind farms that are partially constructed, have they been spinning? Are they producing power? And my mind goes to this, um, as a risk reduction effort. I wonder if, uh, the cable, if the cable lay timelines were what they were. Right. So would you now, I guess as a risk reduction effort, and this seems really silly to have to think about this.
If you have your offshore substation, was the, was the main export cable connected to some of these like revolution wind where they have the injunction right now? Was that export cable connected and were the inter array cables regularly connected to turbines and them coming online? Do, do, do, do, do. Like, it wasn’t like a COD, we turned the switch and we had to wait for all 62 turbines.
Right. So to our [00:04:00] knowledge and, and, uh, please reach out to any of us on LinkedIn or an email or whatever to our knowledge. The turbines that are in production have still have been spinning. It’s the construction activities that have been stopped, but now. Hey, revolution wind is 90% complete and they’re back out and running, uh, on construction activities as of today.
Speaker 2: It was in the last 48 hours. So this, this is a good sign because I think as the other wind farms go through the courts, they’re gonna essentially run through this, this same judge I that. Tends to happen because they have done all the research already. So you, you likely get the same outcome for all the other wind farms, although they have to go through the process.
You can’t do like a class action, at least that’s doesn’t appear to be in play at the minute. Uh, they’re all gonna have to go through this little bit of a process. But what the judge is saying essentially is the concern from the Department of War, and then the Department of Interior is. [00:05:00] Make believe. I, I don’t wanna frame it.
It’s not framed that way, the way it’s written. There’s a lot more legalistic terms about it. But it basically, they’re saying they tried to stop it before they didn’t get the result they wanted. The Trump administration didn’t get the result they wanted. So the Trump administration ramped it up by saying it was something that was classified in, in part of the Department of War.
The judge isn’t buying it. So the, the, the early action. I think what we initially talked about this, everybody, I think the early feeling was they’re trying to stop it, but the fact that they’re trying to stop it just because, and just start pulling permits is not gonna stand outta the court. And when they want to come back and do it again, they’re not likely to win.
If they would. Kept their ammunition dry and just from the beginning said it’s something classified as something defense related that Trump administration probably would’ve had a better shot at this. But now it just seems like everything’s just gonna lead down the pathway where all these projects get finished.
Speaker: Yeah, I think that specific judge probably was listening to the [00:06:00] Uptime podcast last week for his research. Um, listen to, to our opinions that we talked about here, saying that this is kind of all bs. It’s not gonna fly. Uh, but what we’re sitting at here is like Revolution Wind was, had the injunction against it.
Uh, empire Wind had an injunction again, but they were awaiting a similar ruling. So hopefully that’s actually supposed to go down today. That’s Wednesday. Uh, this is, so we’re recording this on Wednesday. Um, and then Dominion is, has, is suing as well, and their, uh, hearing is on Friday. In two, two days from now.
And I would expect, I mean, it’s the same, same judge, same piece of papers, like it’s going to be the same result. Some numbers to throw at this thing. Now, just so the listeners know the impact of this, uh, dominion for the Coastal Virginia Offshore Wind Project, they say that their pause in construction is costing them $5 million a day, and that is.
That’s a pretty round number. It’s a conservative number to be honest with you. For officer operations, how many vessels and how much stuff is out there? That makes sense. Yep. [00:07:00] 5 million. So $5 million a day. And that’s one of the wind farms. Uh, coastal, Virginia Wind Farm is an $11 billion project. With, uh, it’s like 176 turbines.
I think something to that, like it’s, it’s got enough power, it’s gonna have enough production out there to power up, like, uh, like 650,000 homes when it’s done. So there’s five projects suspended right now. I’m continuing with the numbers. Um, well, five, there’s four now. Revolution’s back running, right? So five and there’s four.
Uh, four still stopped. And of those five is 28. Billion dollars in combined capital at risk, right? So you can understand why some of these companies are worried, right? They’re this is, this is not peanuts. Um, so you saw a little bump in like Ted stock in the markets when this, this, uh, revolution wind, uh, injunction was stopped.
Uh, but. You also see that, uh, Moody’s is a credit [00:08:00] rating. They’ve lowered ORs, Ted’s um, rating from stable to negative, given that political risk.
Speaker 2: Well, if you haven’t been paying attention, wind energy O and m Australia 2026 is happening relatively soon. It’s gonna be February 17th and 18th. It’s gonna be at the Pullman Hotel downtown Melbourne.
And we are all looking forward to it. The, the roster and the agenda is, is nearly assembled at this point. Uh, we have a, a couple of last minute speakers, but uh, I’m looking at the agenda and like, wow, if you work in o and m or even are around wind turbines, this is the place to be in February. From my
Speaker: seat.
It’s pretty, it’s, it’s, it’s shaping up for pretty fun. My phone has just been inundated with text message and WhatsApp of when are you traveling? What are your dates looking forward to, and I wanna say this right, Rosie. Looking forward to Melvin. Did I get it? Did I do it okay.
Speaker 3: You know how to say it.
Speaker: So, so we’re, we’re really looking forward to, we’ve got a bunch of people traveling from around the [00:09:00] world, uh, to come and share their collective knowledge, uh, and learn from the Australians about how they’re doing things, what the, what the risks are, what the problems are, uh, really looking forward to the environment down there, like we had last year was very.
Collaborative, the conversations are flowing. Um, so we’re looking forward to it, uh, in a big way from our seats. Over here,
Speaker 2: we are announcing a lightning workshop, and that workshop will be answering all your lightning questions in regards to your turbines Now. Typically when we do this, it’s about $10,000 per seat, and this will be free as part of WMA 2026.
We’re gonna talk about some of the lightning physics, what’s actually happening in the field versus what the OEMs are saying and what the IEC specification indicates. And the big one is force majeure. A lot of operators are paying for damages that are well within the IEC specification, and we’ll explain.[00:10:00]
What that is all about and what you can do to save yourself literally millions of dollars. But that is only possible if you go to Woma 2020 six.com and register today because we’re running outta seats. Once they’re gone, they’re gone. But this is a great opportunity to get your lightning questions answered.
And Rosemary promised me that we’re gonna talk about Vestus turbines. Siemens turbines. GE Renova turbines. Nordex turbines. So if you have Nordex turbines, Sulan turbines, bring the turbine. Type, we’ll talk about it. We’ll get your questions answered, and the goal is that everybody at at Wilma 2026 is gonna go home and save themselves millions of dollars in 26 and millions of dollars in 27 and all the years after, because this Lightning workshop is going to take care of those really frustrating lightning questions that just don’t get answered.
We’re gonna do it right there. Sign up today.
Speaker 3: [00:11:00] You know what, I’m really looking forward to that session and especially ’cause I’ve got a couple of new staff or new-ish staff at, it’s a great way to get them up to speed on lightning. And I think that actually like the majority of people, even if you are struggling with lightning problems every day, I bet that there is a whole bunch that you could learn about the underlying physics of lightning.
And there’s not so many places to find that in the world. I have looked, um, for my staff training, where is the course that I can send them to, to understand all about lightning? I know when I started atm, I had a, an intro session, one-on-one with the, you know, chief Lightning guy there. That’s not so easy to come by, and this is the opportunity where you can get that and better because it’s information about every, every OEM and a bit of a better understanding about how it works so that you can, you know, one of the things that I find working with Lightning is a lot of force MA mature claims.
And then, um, the OEMs, they try and bamboozle you with this like scientific sounding talk. If you understand better, then you’ll be able to do better in those discussions. [00:12:00] So I would highly recommend attending if you can swing the Monday as well.
Speaker: If you wanna attend now and you’re coming to the events.
Reach out to, you can reach out to me directly because what we want to do now is collect, uh, as much information as possible about the specific turbine types of the, that the people in the room are gonna be responsible for. So we can tailor those messages, um, to help you out directly. So feel free to reach out to me, joel.saxo, SAXU m@wglightning.com and uh, we’ll be squared away and ready to roll on Monday.
I think that’s Monday the 16th.
Speaker 2: So while American offshore wind fights for survival in the courts, British offshore wind just had its biggest day ever. The United Kingdom awarded contracts for 8.4 gigawatts. That’s right. 8.4 gigawatts of new offshore wind capacity, the largest auction in European history.
Holy smokes guys. The price came in at about 91 pounds per megawatt hour, and that’s 2024 pounds. [00:13:00] Uh, and that’s roughly 40% cheaper than building a new. Gas plant Energy Secretary Ed Milliband called it a monumental step towards the country’s 2030 clean power goals and that it is, uh, critics say that prices are still higher than previous auctions, and one that the government faces challenges connecting all this new capacity to the grid, and they do, uh, transmission is a limiting factor here, but in terms of where the UK is headed.
Putting in gigawatts of offshore wind is going to disconnect them from a lot of need on the gas supply and other energy sources. It’s a massive auction round. This was way above what I remember being, uh. Talked about when we were in Scotland just a couple of weeks ago, Joel.
Speaker: Yeah, that’s what I was gonna say.
You know, when we were, when we were up with the, or E Catapult event, and we talked to a lot of the different organizations of their OWGP and um, you know, the course, the or e Catapult folks and, and, and a [00:14:00] few others, they were really excited about AR seven. They were like, oh, we’re, we’re so excited. It’s gonna come down, it’s gonna be great.
I didn’t expect these kind of numbers to come out of this thing. Right? ’cause we know that, um, they’ve got about, uh, the UK currently has about. 16 and a half or so gigawatts of offshore wind capacity, um, with, you know, they got a bunch under construction, it’s like 11 under construction, but their goal is to have 43 gigawatts by 2030.
So,
Speaker 2: man.
Speaker: Yeah. And, and when 2030, put this into Conte Con context now. This is one of our first podcasts of the new year. That’s only four years away. Right. It’s soon. And, and to, to be able to do that. So you’re saying they got 16, they go some round numbers. They got 16 now. Pro producing 11 in the pipe, 11 being constructed.
So get that to 27. That’s another 16 gigawatts of wind. They want, they that are not under construction today that they want to have completed in the next four years. That is a monumental effort now. We know that there’s some grid grid complications and connection [00:15:00] requirements and things that will slow that down, but just thinking about remove the grid idea, just thinking about the amount of effort to get those kind of large capital projects done in that short of timeline.
Kudos to the UK ’cause they’re unlocking a lot of, um, a lot of private investment, a lot of effort to get these things, but they’re literally doing the inverse of what we’re doing in the United States right now.
Speaker 2: There would be about a total of 550, 615 ish megawatt turbines in the water. That does seem doable though.
The big question is who’s gonna be providing those turbines? That’s a. Massive order. Whoever the salesperson is involved in that transaction is gonna be very happy. Well, the interesting thing here
Speaker: too is the global context of assets to be able to deliver this. We just got done talking about the troubles at these wind farms in the United States.
As soon as these. Wind farms are finished. There’s not more of them coming to construction phase shortly, right? So all of these assets, all these jack up vessels, these installation vessels, these specialized cable lay vessels, they [00:16:00]can, they can fuel up and freaking head right across, back across the Atlantic and start working on these things.
If the pre all of the engineering and, and the turbine deliveries are ready to roll the vessels, uh, ’cause that you, that, you know, two years ago that was a problem. We were all. Forecasting. Oh, we have this forecasted problem of a shortage of vessels and assets to be able to do installs. And now with the US kind of, basically, once we’re done with the wind farms, we’re working on offshore, now we’re shutting it down.
It frees those back up, right? So the vessels will be there, be ready to roll. You’ll have people coming off of construction projects that know what’s going on, right? That, that know how to, to work these things. So the, the people, the vessels that will be ready to roll it is just, can we get the cables, the mono piles, the turbines and the cells, the blades, all done in time, uh, to make this happen And, and.
I know I’m rambling now, but after leaving that or e Catapult event and talking to some of the people, um, that are supporting those [00:17:00] funds over there, uh, being injected from the, uh, the government, I think that they’ve got
Speaker 2: the, the money flowing over there to get it done too. The big winner in the auction round was RWE and they.
Almost seven gigawatts. So that was a larger share of the 8.4 gigawatts. RWE obviously has a relationship with Vestus. Is that where this is gonna go? They’re gonna be, uh, installing vestus turbines. And where were those tur turbines? As I was informed by Scottish gentlemen, I won’t name names. Uh, will those turbines be built in the uk?
Speaker 3: It’s a lot. It’s a, it’s one of the biggest challenges with, um, the supply chain for wind energy is that it just is so lumpy. So, you know, you get, um, uh. You get huge eight gigawatts all at once and then you have years of, you know, just not much. Not much, not much going on. I mean, for sure they’re not gonna be just building [00:18:00] eight gigawatts worth of, um, wind turbines in the UK in the next couple of years because they would also have to build the capacity to manufacture that and, and then would wanna be building cocks every couple of years for, you know, the next 10 or 20 years.
So, yeah, of course they’re gonna be manufacturing. At facilities around the world and, and transporting them. But, um, yeah, I just, I don’t know. It’s one of the things that I just. Constantly shake my head about is like, how come, especially when projects are government supported, when plans are government supported, why, why can’t we do a better job of smoothing things out so that you can have, you know, for example, local manufacturing because everyone knows that they’ve got a secure pipeline.
It’s just when the government’s involved, it should be possible.
Speaker 2: At least the UK has been putting forth some. Pretty big numbers to support a local supply chain. When we were over in Scotland, they announced 300 million pounds, and that was just one of several. That’s gonna happen over the next year. There will be a [00:19:00] near a billion pounds be put into the supply chain, which will make a dramatic difference.
But I think you’re right. Also, it’s, they’re gonna ramp up and then they, it’s gonna ramp down. They have to find a way to feed the global marketplace at some point, be because the technology and the people are there. It’s a question of. How do you sustain it for a 20, 30 year period? That’s a different question.
Speaker 3: I do agree that the UK is doing a better job than probably anybody else. Um, it it’s just that they, the way that they have chosen to organize these auctions and the government support and the planning just means that they have that, that this is the perfect conditions to, you know. Make a smooth rollout and you know, take care of all this.
And so I just a bit frustrated that they’re not doing more. But you are right that they’re doing the best probably
Speaker 4: once all of these are in service though, aren’t there quite a bit of aftermarket products that are available in the UK
Speaker: on the service then? I think there’s more.
Speaker 4: Which, I mean, that’s good. A good part of it, right?
Speaker: If we’re talking Vestas, so, so let’s just round this [00:20:00] up too. If we’re talking vest’s production for blades in Europe, you have two facilities in Denmark that build V 2 36 blades. You have one facility in Italy that builds V 2 36 blades, Taiwan, but they build them for the APAC market. Of course. Um, Poland had a, has one on hold right now, V 2 36 as well.
Well, they just bought that factory from LM up in Poland also. That’s, but I think that’s for onshore term, onshore blades. Oh, yes, sure. And then Scotland has, they have the proposed facility in, in Laith. That there, that’s kind of on hold as well. So if that one’s proposed, I’m sure, hey, if we get a big order, they’ll spin that up quick because they’ll get, I am, I would imagine someone o you know, one of the, one of the funds to spool up a little bit of money, boom, boom, boom.
’cause they’re turning into local jobs. Local supply
Speaker 2: chain does this then create the condition where a lot of wind turbines, like when we were in Scotland, a lot of those wind turbines are. Gonna reach 20 years old, maybe a little bit older here over the next five years where they will [00:21:00] need to be repowered upgraded, whatever’s gonna happen there.
If you had internal manufacturing. In country that would, you’d think lower the price to go do that. That will be a big effort just like it is in Spain right now.
Speaker: The trouble there though too, is if you’re using local content in, in the uk, the labor prices are so much
Speaker 2: higher. I’m gonna go back to Rosie’s point about sort of the way energy is sold worldwide.
UK has high energy prices, mostly because they are buying energy from other countries and it’s expensive to get it in country. So yes, they can have higher labor prices and still be lower cost compared to the alternatives. It, it’s not the same equation in the US versus uk. It’s, it’s totally different economics, but.
If they get enough power generation, which I think the UK will, they’re gonna offload that and they’re already doing it now. So you can send power to France, send power up [00:22:00] north. There’s ways to sell that extra power and help pay for the system you built. That would make a a lot of sense. It’s very similar to what the Saudis have done for.
Dang near 80 years, which is fill tankers full of oil and sell it. This is a little bit different that we’re just sending electrons through the water to adjacent European countries. It does seem like a plan. I hope they’re sending ’em through a cable in the water and not just into the water. Well, here’s the thing that was concerning early on.
They’re gonna turn it into hydrogen and put it on a ship and send it over to France. Like that didn’t make any sense at all. Uh. Cable’s on the way to do it. Right.
Speaker: And actually, Alan, you and I did have a conversation with someone not too long ago about that triage market and how the project where they put that, that that trans, that HVDC cable next to the tunnel it, and it made and it like paid for itself in a year or something.
Was that like, that they didn’t wanna really tell us like, yeah, it paid for itself in a year. Like it was a, the ROI was like on a, like a $500 million [00:23:00]project or something. That’s crazy. Um, but yeah, that’s the same. That’s, that is, I would say part of the big push in the uk there is, uh, then they can triage that power and send it, send it back across.
Um, like I think Nord Link is the, the cable between Peterhead and Norway, right? So you have, you have a triage market going across to the Scandinavian countries. You have the triage market going to mainland eu. Um, and in when they have big time wind, they’re gonna be able to do it. So when you have an RWE.
Looking at seven gigawatts of, uh, possibility that they just, uh, just procured. Game on. I love it. I think it’s gonna be cool. I’m, I’m happy to see it blow
Speaker 2: up. Canada is getting serious about offshore wind and international developers are paying attention. Q Energy, France and its South Korean partner. Hawa Ocean have submitted applications to develop wind projects off Nova Scotia’s Coast.
The province has big ambitions. Premier, Tim Houston wants to license enough. Offshore [00:24:00] wind to produce 40 gigawatts of power far more than Nova Scotia would ever need. Uh, the extra electricity could supply more than a quarter of Canada’s total demand. If all goes according to plan, the first turbines could be spinning by 2035.
Now, Joel. Yeah, some of this power will go to Canada, but there’s a huge market in the United States also for this power and the capacity factor up in Nova Scotia offshore is really good. Yeah. It’s uh, it
Speaker: is simply, it’s stellar, right? Uh, that whole No, Nova Scotia, new Brunswick, Newfoundland, that whole e even Maritimes of Canada.
The wind, the wind never stops blowing, right? Like I, I go up there every once in a while ’cause my wife is from up there and, uh, it’s miserable sometimes even in the middle of summer. Um, so the, the wind resource is fantastic. The, it, it is a boom or will be a boom for the Canadian market, right? There’re always [00:25:00] that maritime community, they’re always looking for, for, uh, new jobs.
New jobs, new jobs. And this is gonna bring them to them. Um, one thing I wanna flag here is when I know this, when this announcement came out. And I reached out to Tim Houston’s office to try to get him on the podcast, and I haven’t gotten a response yet. Nova Scotia. So if someone that’s listening can get ahold of Tim Houston, we’d love to talk to him about the plans for Nova Scotia.
Um, but, but we see that just like we see over overseas, the triage market of we’re making power, we can sell it. You know, we balance out the prices, we can sell it to other places. From our seats here we’ve been talking about. The electricity demand on the east coast of the United States for, for years and how it is just climbing, climbing, climbing, especially AI data centers.
Virginia is a hub of this, right? They need power and we’re shooting ourselves in the foot, foot for offshore wind, plus also canceling pipelines and like there’s no extra generation going on there except for some solar plants where you can squeeze ’em in down in the Carolinas and whatnot. [00:26:00] There is a massive play here for the Canadians to be able to HVD see some power down to us.
Speaker 2: The offshore conditions off the coast of Nova Scotia are pretty rough, and the capacity factor being so high makes me think of some of the Brazilian wind farms where the capacity factor is over 50%. It’s amazing down there, but one of the outcomes of that has been early turbine problems. And I’m wondering if the Nova Scotia market is going to demand a different kind of turbine that is specifically built for those conditions.
It’s cold, really cold. It’s really windy. There’s a lot of moisture in the air, right? So the salt is gonna be bad. Uh, and then the sea life too, right? There’s a lot of, uh, sea life off the coast of the Nova Scotia, which everybody’s gonna be concerned about. Obviously, as this gets rolling. How do we think about this?
And who’s gonna be the manufacturer of turbines for Canada? Is it gonna be Nordics? Well,
Speaker: let’s start from the ground up there. So from the or ground up, it’s, how about sea [00:27:00] floor up? Let’s start from there. There is a lot of really, really, if you’ve ever worked in the offshore world, the o offshore, maritime Canadian universities that focus on the, on offshore construction, they produce some of the best engineers for those markets, right?
So if you go down to Houston, Texas where there’s offshore oil and gas companies and engineering companies everywhere, you run into Canadians from the Maritimes all over the place ’cause they’re really good at what they do. Um, they are developing or they have developed offshore oil and gas platforms.
Off of the coast of Newfoundland and up, up in that area. And there’s some crazy stuff you have to compete with, right? So you have icebergs up there. There’s no icebergs in the North Atlantic that like, you know, horn seats, internet cruising through horn C3 with icebergs. So they’ve, they’ve engineered and created foundations and things that can deal with that, those situations up there.
But you also have to remember that you’re in the Canadian Shield, which is, um, the Canadian Shield is a geotechnical formation, right? So it’s very rocky. Um, and it’s not [00:28:00] like, uh, the other places where we’re putting fixed bottom wind in where you just pound the piles into the sand. That’s not how it’s going to go, uh, up in Canada there.
So there’s some different engineering that’s going to have to take place for the foundations, but like you said, Alan Turbine specific. It blows up there. Right. And we have seen onshore, even in the United States, when you get to areas that have high capacity burning out main bearings, burning out generators prematurely because the capacity factor is so high and those turbines are just churning.
Um, I, I don’t know if any of the offshore wind turbine manufacturers are adjusting any designs specifically for any markets. I, I just don’t know that. Um, but they may run into some. Some tough stuff up there, right? You might run into some, some overspeeding main bearings and some maintenance issues, specifically in the wintertime ’cause it is nasty up there.
Speaker 2: Well, if you have 40 gigawatts of capacity, you have several thousand turbines, you wanna make sure really [00:29:00] sure that the blade design is right, that the gearbox is right if you have a gearbox, and that everything is essentially over-designed, heated. You can have deicing systems on it, I would assume that would be something you would be thinking about.
You do the same thing for the monopoles. The whole assembly’s gotta be, have a, just a different thought process than a turbine. You would stick off the coast of Germany. Still rough conditions at times, but not like Nova Scotia.
Speaker: One, one other thing there to think about too that we haven’t dealt with, um.
In such extreme levels is the, the off the coast of No. Nova Scotia is the Bay of Fundee. If you know anything about the Bay of Fundee, it is the highest tide swings in the world. So the tide swings at certain times of the year, can be upwards of 10 meters in a 12 hour period in this area of, of the ocean.
And that comes with it. Different time, different types of, um, one of the difficult things for tide swings is it creates subsid currents. [00:30:00] Subsid currents are, are really, really, really bad, nasty. Against rocks and for any kind of cable lay activities and longevity of cable lay scour protection around turbines and stuff like that.
So that’s another thing that subsea that we really haven’t spoke about.
Speaker 3: You know, I knew when you say Bay Bay of funding, I’m like, I know that I have heard that place before and it’s when I was researching for. Tidal power videos for Tidal Stream. It’s like the best place to, to generate electricity from.
Yeah, from Tidal Stream. So I guess if you are gonna be whacking wind turbines in there anyway, maybe you can share some infrastructure and Yeah. Eca a little bit, a little bit more from your, your project.
Speaker 2: that wraps up another episode of the Uptime Wind Energy Podcast. If today’s discussion sparked any questions or ideas. We’d love to hear from you. Just reach out to us on LinkedIn and don’t forget to subscribe so you never miss an episode.
And if you found value in today’s conversation, please leave us a review. It really helps other wind energy professionals discover the show For Rosie, Yolanda and Joel, I’m Alan Hall, and we’ll see you here next week on the Uptime [00:36:00] Wind Energy Podcast.
-
Climate Change5 months ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases5 months ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases2 years ago嘉宾来稿:满足中国增长的用电需求 光伏加储能“比新建煤电更实惠”
-
Climate Change2 years ago
Spanish-language misinformation on renewable energy spreads online, report shows
-
Climate Change2 years ago
Bill Discounting Climate Change in Florida’s Energy Policy Awaits DeSantis’ Approval
-
Climate Change Videos2 years ago
The toxic gas flares fuelling Nigeria’s climate change – BBC News
-
Climate Change2 years ago嘉宾来稿:满足中国增长的用电需求 光伏加储能“比新建煤电更实惠”
-
Carbon Footprint2 years agoUS SEC’s Climate Disclosure Rules Spur Renewed Interest in Carbon Credits
