Connect with us

Published

on

Biden's IRA Spurs $34 Billion U.S. Solar Boom, But Can It Overcome Industry Risks?

The U.S. solar industry has seen a rapid expansion since President Joe Biden signed the Inflation Reduction Act (IRA) in August 2022. The act has been instrumental in increasing domestic solar panel production capacity more than fivefold. This is a crucial step in Biden’s goal of building clean energy supply chains within the country. 

Globally, the International Energy Agency (IEA) recently published its World Energy Outlook 2024 which shows that solar power generation could increase fourfold by 2030. The report suggests that solar energy could be a leading source of electricity by 2033, surpassing nuclear, wind, hydro, and natural gas. It could eventually even overtake coal, positioning itself as the largest electricity source globally. 

IRA Fuels Solar Investments but Leaves Gaps

Renewable energy is set to significantly outpace electricity demand growth, per IEA data. In one scenario renewable output is expected to expand by nearly 2,200 TWh by 2035, more than tripling its 2023 level. This increase will boost renewables’ share of electricity generation from 22% to 58%, with solar PV seeing the largest growth. 

solar PV capacity by 2035 IEA

Key factors of this growth include high-quality renewable resources, established markets with low technology costs, and strong federal and state policy support. 

The IRA is a cornerstone of Biden’s clean energy policy. It offers up to $1.2 trillion in tax incentives over 10 years. These incentives aim to boost the production and deployment of clean energy technologies. 

One of the IRA’s key elements is the advanced manufacturing tax credit, which has led to over a dozen new or expanded solar module manufacturing plants across the U.S. 

  • Since the IRA’s passage, solar companies have invested over $34 billion in building new factories.

According to federal data, the U.S. now boasts over 45 gigawatts (GWdc) of solar module manufacturing capacity. At maximum production, these facilities could meet most of the U.S. solar demand expected by 2025 as reported by S&P Global Commodity Insights.

US PV manufacturing capacity

However, the solar industry’s expansion has not been uniform. The bulk of investments has gone into the assembly of modules, trackers, inverters, and other downstream components. In contrast, there’s a lack of domestic production for crystalline-silicon ingots, wafers, and cells—key components of the solar supply chain. 

Navigating Market Risks and Government Support

Industry leaders see these gaps as a significant hurdle to achieving a fully self-reliant solar industry.

Ray Long, the president and CEO of the American Council on Renewable Energy, describes this surge as a “clean energy manufacturing renaissance.” Despite the positive momentum, Long emphasizes that the rapid growth of solar manufacturing in the U.S. comes with challenges.

For instance, the potential threat from cheaper Asian imports is one challenge. Some U.S. manufacturers seek more federal support to level the playing field, believing that additional measures are necessary to ensure their success. 

Moreover, the outcome of the upcoming presidential election could significantly shape future policies. While both political camps support bringing manufacturing back to the U.S., their strategies differ. 

Donald Trump, for example, advocates for broader tariffs on imports, which could raise costs for consumers. Kamala Harris, on the other hand, criticizes such tariffs as a “sales tax” on American buyers.

Experts believe that consistent support from the federal government is crucial to sustain the growth of domestic solar production. 

Notably, the U.S. Treasury Department is working to enhance support for the solar industry. It recently clarified that solar ingot and wafer manufacturing facilities qualify for a 25% investment tax credit under the 2022 CHIPS and Science Act. 

Solar Industry Moves Forward Despite Challenges

Industry leaders are divided on the future direction of U.S. solar manufacturing. Some are optimistic about the role of government support in boosting domestic production.

Steven Zhu, president of Trina Solar (U.S.) Inc., emphasized the importance of diversifying manufacturing locations, including expanding into the U.S., to manage risks from policy changes. Trina Solar is set to open a 5-GW solar module facility in Texas, with plans to expand production in 2025.

Yet, others are skeptical about the sustainability of new U.S. solar plants. T.J. Rodgers, CEO of residential solar company Complete Solar and former chairman of SunPower, argues that most of the new solar factories in the U.S. are unlikely to be profitable without continuous government subsidies. He believes the reliance on taxpayer support to maintain operations could become a long-term challenge for the industry.

These varying perspectives reveal the uncertainty surrounding the U.S. solar manufacturing industry, especially with the presidential election approaching. While both parties agree on the importance of reducing reliance on Chinese solar components, their differing approaches could significantly impact the industry’s trajectory.

Worldwide, the IEA forecast shows that solar and wind energy could transform the global power landscape, potentially contributing nearly 60% of global electricity by 2050. The agency further projects that solar power alone could see a massive expansion. It can go beyond 16,000 gigawatts (GW) by 2050, compared to today’s levels.

In the U.S., renewable energy sources are on track to grow much faster than the electricity demand. Under one scenario, STEPS (Stated Policies), solar power will see the most significant growth. Together with wind energy, together they could provide 50% of electricity by 2035, up from 15% in 2023.  

US electricity demand growth and changes

Ultimately, the U.S. solar manufacturing sector is in a period of rapid growth, driven by strong demand for renewable energy and significant federal incentives. As solar companies push forward with ambitious expansion plans, their success will depend on continued government support and favorable market conditions. 

The post Biden’s IRA Spurs $34 Billion U.S. Solar Boom, But Can It Overcome Industry Risks? appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Carbon credit providers vs marketplaces: who does what

Published

on

Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.

Continue Reading

Carbon Footprint

Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”

Published

on

Democrats, Take The Deal. New York Times editorial, Nov. 12.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com