Norway Hydro Energy Lansdcape

Norway: A Hydropower Wonderland

Norway, the land of majestic fjords, breathtaking mountains, and charming fishing villages, also boasts a title less widely known but equally impressive: the hydropower capital of Europe

With its abundant rainfall and rugged topography, Norway has harnessed the power of water to become a global leader in clean and sustainable energy generation.

A Legacy of Hydropower:

  • 96% of Norway’s electricity comes from hydropower, a staggering figure compared to the global average of around 16%. This dependence on hydro began in the late 19th century, driven by the need for energy for industrialization.
  • Over 1,500 hydropower plants dot the Norwegian landscape, from the snow-capped peaks of the north to the lush valleys of the south. These plants range in size, with some generating enough electricity for entire towns, while others feed into the national grid.
Norway Hydro Energy Lansdcape
History of Hydro Energy in Norway

Norway’s Hydropower Journey: From Waterfall Thunder to Clean Energy Leader

Norway’s embrace of hydropower is a captivating saga, intertwined with industrialization, innovation, and a deep respect for the natural world. Let’s trace the path of this remarkable journey:

Early Sparks (19th Century):

  • 1870s: The seeds are sown with early electricity experiments and the establishment of Norway’s first small hydro plants.
  • 1891: Hammerfest, nestled above the Arctic Circle, takes the plunge, becoming the first town lit by hydropower.
  • 1892: Prime Minister Knutsen champions national electricity generation, advocating for hydro as the clean and sustainable choice.

Industrial Takeoff (Early 20th Century):

  • 1905: Independence paves the way for rapid industrialization, fueling the demand for clean energy.
  • 1911: Vemork power plant near Rjukan, then the world’s largest, powers fertilizer production and lays the foundation for a burgeoning industry.
  • 1920s: Hydropower reaches every corner of the country, transforming rural communities and powering urban growth.

Golden Age and Expansion (Mid-20th Century):

  • 1950s-1980s: A national hydropower boom sees massive capacity expansion, with iconic projects like Folgefonn and Glomfjord.
  • 1960s: Surplus electricity fuels export agreements, solidifying Norway’s position as a regional energy supplier.
  • 1970s: Environmental concerns emerge, leading to stricter regulations and a focus on cleaner technologies.

Modern Challenges and Advancements (21st Century):

  • Balancing Demand and Supply: Fluctuations in renewable resources necessitate innovative solutions like pumped storage and smart grid technologies.
  • Environmental Impact: Striking a balance between energy needs and preserving ecosystems is crucial, with careful planning and mitigation strategies.
  • Sharing Knowledge: Norway’s expertise is actively shared, providing valuable lessons for other countries transitioning to clean energy.

The Future Unfolds:

As climate change casts its shadow, Norway’s commitment to hydropower remains firm, but with a focus on increased efficiency, environmental sustainability, and integration with other renewable sources. The legacy of the waterfall pioneers continues to guide Norway on its path to a clean and vibrant future.

Norway Hydro Energy Lansdcape

Hydroelectric Power Plant in Norway

A Hydroelectric Wonderland: Exploring Norway’s Mighty Power Plants

Norway’s majestic landscape isn’t just about breathtaking fjords and snow-capped peaks. Dotted throughout the country are hundreds of hydroelectric power plants, silent giants harnessing the power of rushing water to provide clean energy. 

These marvels of engineering not only illuminate homes and fuel industries, but also stand as testaments to Norway’s commitment to a sustainable future. 

Powering the Fjords: More Mighty Hydroelectric Wonders of Norway

1. Aurland Hydroelectric Power Station:

Nestled within the Aurlandsdalen valley, this colossal complex is a true powerhouse. Comprising three separate plants – Aurland 1, 2, and 3 – it boasts a combined capacity of 1,128 MW, making it the second-largest in Norway. Imagine the sheer force of water coursing through its turbines, generating enough electricity to power over a million homes! The iconic Stegastein viewpoint offers jaw-dropping panoramas of Aurland 2, the power station blending seamlessly with the dramatic beauty of the valley.

2. Sima Kraftverk:

Venture deep inside a mountain near Odda and you’ll discover Sima Kraftverk, a testament to human ingenuity. This remarkable power station utilizes a 1,483-meter-long pressure tunnel, carving its way through the heart of the mountain. This makes it the deepest power station in Europe, its turbines whirring with the power of water plummeting from a staggering height. The entrance to the power station itself is a sight to behold, a stark concrete portal contrasting with the surrounding natural splendor.

3. Folgefonn Hydroelectric Power Station:

Located near Hardangerfjord, Folgefonn harnesses the power of one of Norway’s largest glaciers, the Folgefonn. Imagine glacial meltwater rushing through tunnels and pipes, channeled into turbines that generate 522 MW of clean energy. This power station plays a vital role in supplying western Norway, its contribution evident in the brightly lit towns and thriving industries. Standing at the dam, the vast expanse of the Folgefonn glacier stretching towards the horizon is a powerful reminder of the natural forces at play.

4. Morkedalselva Hydroelectric Power Station:

Head north to Nord-Trøndelag county and you’ll encounter Morkedalselva, a series of three power plants built over several decades. With a combined capacity of 824 MW, it’s a major contributor to the national grid. Its dams and reservoirs create stunning artificial lakes, their mirror-like surfaces reflecting the surrounding mountains and forests. Picture kayakers paddling peacefully across the water, surrounded by the serene beauty of nature.

5. Nedre Otta Hydroelectric Power Station:

Travel back in time to Oppland county and you’ll find Nedre Otta, a classic example of early 20th-century hydroelectric engineering. Built in 1914, it played a crucial role in powering Norway’s industrialization. Its red brick facade and sturdy construction exude a timeless charm, a reminder of the pioneering spirit that fueled Norway’s transition to clean energy. Imagine the excitement when the first lights flickered on in homes and factories, powered by the mighty Otta River.

6. Kvilldal Hydroelectric Power Station:

Hidden within the mountains of Rogaland, Kvilldal reigns supreme as the most powerful hydroelectric plant in Norway. This behemoth boasts four Francis turbines, generating a staggering 1,240 MW – enough to illuminate over 1.2 million homes! Picture the sheer volume of water cascading through its tunnels, churning the turbines with raw power. Kvilldal’s intricate water system, utilizing both natural reservoirs and man-made tunnels, is a fascinating example of engineering expertise.

7. Saurdal Hydroelectric Power Station:

In the lush valleys of Rogaland, another hydropower giant stands tall: Saurdal. Its 640 MW capacity plays a crucial role in powering homes and industries across the region. Imagine the serene contrast between the power station’s sleek, modern design and the surrounding verdant meadows, showcasing the potential for clean energy to coexist with nature. Saurdal also boasts an innovative pumped-storage system, allowing it to store excess energy during off-peak hours and release it when demand increases, a testament to Norway’s commitment to flexible and sustainable energy solutions.

8. Vemork Power Station:

Travel back in time to Rjukan, where history and hydropower intertwine at the iconic Vemork power station. Built in 1911, it was once the world’s largest, powering a fertilizer factory and illuminating homes during a time of rapid industrialization. Its impact on Norway’s development is undeniable, making it a landmark of ingenuity and innovation. Today, Vemork serves as a museum, showcasing the evolution of hydropower and its role in shaping the nation’s future.

9. Glomfjord Hydroelectric Power Station:

In the heart of Northern Norway, amidst snow-capped mountains and dramatic fjords, lies Glomfjord. This massive complex, constructed in the 1940s, holds the title of the largest pumped-storage facility in the world. Imagine vast reservoirs nestled high in the mountains, connected by a network of tunnels, ready to unleash their stored energy when needed. Glomfjord plays a crucial role in balancing the Norwegian grid, ensuring a stable and reliable supply of clean electricity even during fluctuating demand periods.

These are just a few of the countless hydroelectric power plants that grace Norway’s landscape. Each one embodies a unique story of innovation, environmental consciousness, and dedication to sustainable energy. As you explore this majestic country, keep your eyes peeled for these silent giants, for they are not just power stations, but symbols of Norway’s commitment to a brighter, cleaner future.

Whether you’re an engineer fascinated by the technology, an environmentalist passionate about clean energy, or simply a traveler intrigued by human ingenuity, Norway’s hydroelectric power plants offer something for everyone. So, embark on your own hydro adventure, explore these fascinating structures, and let the power of nature inspire you.

Norway’s Majestic Hydroelectric Powerhouses: A Tabular View

Norway’s landscape is not just painted by breathtaking fjords and snow-capped mountains, but also dotted with awe-inspiring hydroelectric power plants. These remarkable feats of engineering harness the power of rushing water to provide clean energy, illuminating homes, fueling industries, and standing as testaments to the country’s commitment to a sustainable future. Let’s explore some of these mighty marvels through a detailed table:

Power Station Location Capacity (MW) Key Features Image
Aurland Hydroelectric Power Station Aurlandsdalen valley 1,128 Second-largest in Norway, three separate plants, breathtaking Stegastein viewpoint
Sima Kraftverk Near Odda 185 Deepest power station in Europe (1,483m pressure tunnel), unique mountain location, popular tourist destination
Folgefonn Hydroelectric Power Station Near Hardangerfjord 522 Harnesses power of Folgefonn glacier, major contributor to western Norway, picturesque dam and reservoir
Morkedalselva Hydroelectric Power Station Nord-Trøndelag county 824 Series of three plants built over decades, stunning artificial lakes, recreational opportunities
Nedre Otta Hydroelectric Power Station Oppland county 150 Classic 20th-century example, powered Norway’s industrialization, historical significance
Kvilldal Hydroelectric Power Station Rogaland 1,240 Most powerful in Norway, intricate water system, hidden within mountains
Saurdal Hydroelectric Power Station Rogaland 640 Modern design amidst verdant meadows, innovative pumped-storage system
Vemork Power Station Rjukan 150 Once the world’s largest, powered fertilizer factory, historical landmark and museum
Glomfjord Hydroelectric Power Station Northern Norway 1,450 Largest pumped-storage facility in the world, vast reservoirs and tunnel network, balances the national grid

This table offers a glimpse into the diversity and impressive capabilities of Norway’s hydroelectric power plants. From awe-inspiring capacity to historical significance and innovative solutions, each one tells a unique story within the wider narrative of clean energy and a sustainable future. 

Norway Hydro Energy Lansdcape

Benefits of Hydropower In Norway

Here is the Benefits of Hydropower In Norway

  • Renewable and Clean: Unlike fossil fuels, hydropower is a renewable energy source that produces minimal greenhouse gas emissions. This makes it a crucial player in the fight against climate change.
  • Reliable and Stable: Hydropower plants can be easily adjusted to meet changing electricity demands, providing a stable and reliable source of power. This is particularly important for Norway’s energy-intensive industries, such as aluminum production.
  • Economic Engine: The hydropower industry is a major driver of the Norwegian economy, creating jobs in construction, operation, and maintenance. It also generates significant export revenue, as Norway sells surplus electricity to neighboring countries.

Challenges and Considerations:

  • Environmental Impact: While generally considered clean, hydropower projects can have negative environmental impacts on ecosystems and local communities. The construction of dams and reservoirs can disrupt fish migration patterns and flood valuable land.
  • Social Impact: Resettlement of communities and cultural heritage loss can be associated with hydropower projects.
  • Balancing Demand and Supply: Managing the water flow in reservoirs to meet seasonal electricity demand fluctuations can be challenging.

Data Highlights:

  • Electricity generation: 122.7 TWh (2020)
  • Installed hydropower capacity: 33 GW (2020)
  • Average annual precipitation: 1,322 mm
  • Number of rivers suitable for hydropower: Over 25,000
Norway Hydro Energy Lansdcape
Statistics of Hydro Energy in Norway

Norway’s Hydropower – A Statistical Powerhouse

Norway’s reliance on hydropower is as impressive as its majestic fjords. Let’s dive into some key statistics highlighting this clean energy dominance:

Generation:

  • 96% of Norway’s electricity comes from hydropower, dwarfing the global average of 16%.
  • 122.7 TWh of electricity generated in 2020, enough to power over 12 million homes annually.
  • 143.7 TWh record high achieved in 2021, showcasing potential production.

Capacity:

  • 33 GW of installed hydropower capacity as of 2020, making Norway a European leader.
  • Over 1,500 hydropower plants spread across the country, from mighty giants to local contributors.
  • 84 large hydropower plants (over 100 MW), ensuring significant baseload supply.

Resources:

  • 1,322 mm average annual precipitation across Norway, fueling the hydro potential.
  • Over 25,000 rivers deemed suitable for hydropower development, a vast untapped resource.

Economic Impact:

  • Hydropower industry is a major economic driver, creating jobs in construction, operation, and maintenance.
  • Significant export revenue generated by selling surplus electricity to neighboring countries.

Challenges:

  • Environmental impact of dams and reservoirs on ecosystems and local communities needs careful consideration.
  • Balancing water flow in reservoirs to meet fluctuating demand can be challenging.
  • Social impact of potential resettlement and cultural heritage loss must be addressed with sensitivity.

Future:

  • Research and development aimed at improving efficiency and environmental sustainability of hydropower plants.
  • Exploring pumped-hydro storage solutions to address demand fluctuations.
  • Norway’s leadership in hydropower inspires other countries aiming towards clean energy goals.

Norway’s Hydropower: A Statistical Overview

Statistic Value Units Year
Electricity Generation
* Share of total electricity 96% % 2020
* Annual production 122.7 TWh 2020
* Record high annual production 143.7 TWh 2021
Hydropower Capacity
* Installed capacity 33 GW 2020
* Number of plants > 1,500
* Large plants (over 100 MW) 84
Water Resources
* Average annual precipitation 1,322 mm
* Rivers suitable for hydropower > 25,000

Key Takeaway:

Norway’s hydropower statistics paint a picture of a clean energy champion, relying heavily on this renewable resource. However, balancing environmental and social considerations remains crucial for sustainable development.

This comprehensive statistical overview, I hope, provides a clear understanding of the strength and complexities of Norway’s hydropower landscape.

Norway Hydro Energy Lansdcape

Norway’s Hydropower Landscape: A Model for the World

The Future of Hydropower in Norway:

Hydropower remains a cornerstone of Norway’s energy strategy. The country is continuously investing in research and development to improve the efficiency and environmental sustainability of its hydropower plants. Additionally, exploring pumped-hydro storage to address the issue of fluctuating demand is being actively pursued.

Norway’s success in harnessing hydropower offers valuable lessons for other countries seeking to transition to clean energy. By carefully considering the environmental and social impacts of hydropower projects, and by investing in technological advancements, Norway can continue to be a leader in sustainable energy generation and inspire others to follow suit.

Norway’s hydropower landscape is a testament to the country’s commitment to clean energy and sustainable development. By harnessing the power of its abundant water resources, Norway has not only secured its own energy independence but also provided a model for other countries aspiring to a greener future.

https://www.exaputra.com/2024/01/norway-hydro-energy-lansdcape.html

Renewable Energy

Poverty in the United States

Published

on

There is no doubt that poverty, ignorance, intolerance, and support of criminal tyrants are deeply interconnected.  It’s a shame that nothing can be done to help these people.

Poverty in the United States

Continue Reading

Renewable Energy

Choosing the Right Commercial Solar System Size for Business

Published

on

Undoubtedly, installing a commercial solar system in 2026 is one of the smartest long-term decisions any Australian business can make.

The underlying reason is pretty straightforward!

With electricity prices rising and sustainability becoming increasingly important, solar offers both financial savings and reputational benefits.

But one of the biggest questions business owners face early on is this:

What size solar system do we actually need?

Go too small, and you won’t see the savings you were hoping for. Go too big, and you risk overcapitalising or exporting excess energy at low feed-in rates.

Therefore, the right answer sits somewhere in the middle, and finding it requires more than just a guess.

In this guide, we’ll walk you through the three key steps that determine the right commercial solar system size for your business:

  1. Load analysis
  2. Roof or site assessment
  3. System design considerations

So let’s break down how to help you make a confident decision.

Step 1: Understanding Your Business Energy Load

This is where it all starts: before panels, inverters, or roof space are even discussed, the most important piece of the puzzle is your energy usage, not just how much you use, but when you use it.

Most businesses start by looking at their electricity bill and focusing on the total kilowatt-hours (kWh) used per month or year.

While that number matters, it’s only part of the story. Look beyond the total kWh because, for solar, the timing of your energy use is critical.

Consider an office, manufacturing facility, medical centre, or retail business that uses most of its electricity between 9 am and 4 pm; it is far more “solar-friendly” than one that uses most of its power overnight, such as cold storage or 24/7 operations.

Daytime vs After-Hours Usage

Before installing solar in your commercial property, ask yourself these:

  • Are your main operations running during daylight hours?
  • Do heavy machines, HVAC systems, or production lines operate while the sun is up?
  • Does usage drop significantly after business hours?

The more energy you use during the day, the more of your business solar power you’ll consume directly, which is where the biggest savings are.

However, in some cases, exporting excess energy back to the grid is beneficial, but feed-in tariffs are usually much lower than what you pay for electricity. For greater financial outcomes, it’s better to install battery storage.

Interval Data: A Standard Method

In Australia, for a proper load analysis, solar professionals typically review interval data, typically 15 or 30 minute usage from your electricity retailer.

This data shows your:

  • Daily load patterns
  • Peak demand times
  • Seasonal variations like summer vs winter

This level of detail allows system sizing to be tailored specifically to your business, rather than depending on rough averages.

Step 2: Roof and Site Assessment – What Can Your Building Actually Handle?

Once energy usage is understood, the next question becomes: where will the system go?

Thinking the same? Here’s your answer!

For most commercial systems, the roof is the obvious choice, but not all roofs are equal in size.

Available Roof Space

Solar panels take up space, and commercial systems can require significant space. The rough estimation says:

  • 100kW system is needed for a roof of 500–600 square metres
  • 200kW system is needed for a roof of 1,000–1,200 square metres

However, usable space is often less than the total roof area. Factors that reduce usable space include:

  • HVAC units
  • Skylights
  • Roof access paths
  • Setback requirements
  • Fire safety regulations

Roof Orientation and Tilt

In Australia, north-facing panels generally produce the most energy, but east- and west-facing systems can still perform very well, especially for businesses with high daytime energy requirements.

Also, flat roofs are common on commercial buildings and offer flexibility, as panels can be tilted and oriented at any time using mounting frames.

Structural Integrity

One overlooked factor is whether the roof can physically support the system.

Commercial solar systems add weight, and while it’s usually well within limits, older buildings or lightweight structures may need a structural engineer’s approval.

Therefore, it’s far better to identify this early than be surprised later in the project.

Ground-Mounted and Carport Options

If your roof space is limited, don’t stress out, there are alternative ways, such as:

  • Ground-mounted solar systems
  • Solar carports over parking areas

Even these options can increase the system’s potential size but come with higher costs and planning considerations.

Step 3: Matching System Size to Business Needs

A common problem or misconception about solar panels is that bigger is always better. In reality, the best-sized system is one that aligns closely with your energy profile and business goals.

Self-Consumption

Do you know that the highest financial return comes from using solar energy directly on-site?

This is why many commercial systems are designed to offset 60-80% of daytime energy use, rather than 100% of total annual consumption.

Oversizing a system may result in:

  • Excess exports at low feed-in tariffs
  • Longer payback periods
  • Underutilised capital

A perfectly designed system balances generation with actual energy demand.

Future-Proofing

Above all these, it’s also important to think ahead. Therefore, businesses should consider:

Sometimes installing a slightly larger system, or choosing inverters that support future expansion, makes sense. The goal is to give scalability to your system, not blind oversizing.

Demand Charges and Peak Loads

Many Australian businesses pay demand charges based on their highest usage intervals.

While solar can help reduce daytime demand, it won’t always eliminate peaks, especially if they occur early morning or late afternoon.

In some cases, system design may focus on shaving peaks rather than just maximising total generation.

Which Components Make a Great Commercial Solar System?

A great commercial solar system comes down to a few essential components working together in sync.

Together, these ensure maximum energy output, safety, and return on investment. So, here’s a list:

  1. Solar panels: High-efficiency, durable, long warranties
  2. Inverters: Reliable DC-to-AC conversion and system control
  3. Mounting & racking: Strong, site-specific structural support
  4. Monitoring: Real-time performance tracking and alerts
  5. Safety & protection: Grounding, rapid shutdown, surge and fault protection
  6. Engineering & design: Proper system layout, permitting, and grid compliance

Operations & maintenance: Ongoing inspections to ensure long-term performance

Commercial Solar Batteries: Should They Affect System Size?

In Australia the battery storage is becoming more common, but it’s not always necessary upfront.

For many businesses, only solar panel systems offer the best return on investment. However, batteries tend to make more sense when:

  • Evening or overnight usage is high
  • Demand charges are significant
  • Backup power is critical
  • Time-of-use tariffs are extreme

Nowadays, most businesses choose to design a battery-ready solar system, allowing storage to be added later as prices in the Australian energy market decline.

Which System is Best for You? The Decision Behind the Panels

Now you might be wondering which solar system best fits your life.

We know every home needs a different solar story. So, beyond the numbers, choosing the right commercial solar system size is about confidence.

Panel Type Options

  • Monocrystalline solar Panels: These panels have the highest efficiency and are ideal when the roof or land space is limited.
  • Polycrystalline Solar Panels: They are also a strong choice for Australian businesses seeking a lower upfront cost and are satisfied with slightly reduced efficiency.
  • Bifacial Solar Panels: They are super-efficient as they generate power from both sides. They are best suited for ground-mounted systems or highly reflective surfaces.

Selecting the right panel type helps ensure your commercial solar system delivers maximum performance and long-term value, so choose wisely.

However, in large-scale commercial properties, business owners often have many concerns. For instance:

  • Making the wrong investment.
  • Disrupting operations during commercial solar installation.
  • Dealing with complex approvals.
  • Understanding long-term performance.

Keep in mind that a good, accredited solar partner doesn’t just sell you panels; they explain the “why” behind the system size, show realistic projections, and design around how your business actually operates.

Work with Cyanergy| Your Reputable Solar Installer

Well, in the end note, if you are still looking for the right commercial solar system size, honestly, there’s no one-size-fits-all answer.

Every Australian business is different. Whether a warehouse in Victoria, a winery in Queensland, or a medical centre in New South Wales will all have very different solar needs, even if their electricity bills look similar.

Choosing the right commercial solar system size ultimately comes down to understanding your energy usage, making proper use of roof space, and designing a system that fits your business for the long term.

When those pieces align, solar stops being a guessing game and becomes what it should be.

It’s a smart, reliable investment that works quietly in the background while your business gets on with what it does best.

For more informative content and to schedule a proper energy audit, contact Cyanergy today!

Our solar experts will answer all your questions, making the energy transition process hassle-free and faster.

Your Solution Is Just a Click Away

The post Choosing the Right Commercial Solar System Size for Business appeared first on Cyanergy.

Choosing the Right Commercial Solar System Size for Business

Continue Reading

Renewable Energy

UK Awards 8.4 GW Offshore, US Allows Offshore Construction

Published

on

Weather Guard Lightning Tech

UK Awards 8.4 GW Offshore, US Allows Offshore Construction

Allen, Joel, Rosemary, and Yolanda cover major offshore wind developments on both sides of the Atlantic. In the US, Ørsted’s Revolution Wind won a court victory allowing construction to resume after the Trump administration’s suspension. Meanwhile, the UK awarded contracts for 8.4 gigawatts of new offshore capacity in the largest auction in European history, with RWE securing nearly 7 gigawatts. Plus Canada’s Nova Scotia announces ambitious 40 gigawatt offshore wind plans, and the crew discusses the ongoing Denmark-Greenland tensions with the US administration.

Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us!

The Uptime Wind Energy Podcast brought to you by Strike Tape, protecting thousands of wind turbines from lightning damage worldwide. Visit strike tape.com. And now your hosts, Alan Hall, Rosemary Barnes, Joel Saxon and Yolanda Padron. Welcome to the Uptime Wind Energy Podcast. I’m Allen Hall, along with Yolanda, Joel and Rosie.

Boy, a lot of action in the US courts. And as you know, for weeks, American offshore wind has been holding its breath and a lot of people’s jobs are at stake right now. The Trump administration suspended, uh, five major projects on December 22nd, and still they’re still citing national security concerns.

Billions of dollars are really in balance here. Construction vessels for most of these. Sites are just doing nothing at the minute, but the courts are stepping in and Sted won a [00:01:00] key victory when the federal judge allowed its revolution wind project off the coast of Rhode Island to resume construction immediately.

So everybody’s excited there and it does sound like Osted is trying to finish that project as fast as they can. And Ecuador and Dominion Energy, which are two of the other bigger projects, are fighting similar battles. Ecuador is supposed to hear in the next couple of days as we’re recording. Uh, but the message is pretty clear from developers.

They have invested too much to walk away, and if they get an opportunity to wrap these projects up quickly. They are going to do it now. Joel, before the show, we were talking about vineyard wind and vineyard. Wind was on hold, and I think it, it may not even be on hold right now, I have to go back and look.

But when they were put on hold, uh, the question was, the turbines that were operating, were they able to continue operating? And the answer initially I thought was no. But it was yes, the, the turbines that were [00:02:00] producing power. We’re allowed to continue to produce powers. What was in the balance were the remaining turbines that were still being installed or, uh, being upgraded.

So there’s, there’s a lot going on right now, but it does seem like, and back to your earlier point, Joel, before we start talking and maybe you can discuss this, we, there is an offshore wind farm called Block Island really closely all these other wind farms, and it’s been there for four or five years at this point.

No one’s said anything about that wind farm.

Speaker: I think it’s been there, to be honest with you, since like 2016 or 17. It’s been there a long time. Is it that old? Yeah, yeah, yeah, yeah. So when we were talk, when we’ve been talking through and it gets lost in the shuffle and it shouldn’t, because that’s really the first offshore wind farm in the United States.

We keep talking about all these big, you know, utility scale massive things, but that is a utility scale wind farm as well. There’s fi, correct me if I’m wrong, Yolanda, is it five turbos or six? It’s five. Their decent sized turbines are sitting on jackets. They’re just, uh, they’re, they’re only a couple miles offshore.

They’re not way offshore. But throughout all of these issues that we’ve had, um, with [00:03:00] these injunctions and stopping construction and stopping this and reviewing permits and all these things, block Island has just been spinning, producing power, uh, for the locals there off the coast of Rhode Island. So we.

What were our, the question was is, okay, all these other wind farms that are partially constructed, have they been spinning? Are they producing power? And my mind goes to this, um, as a risk reduction effort. I wonder if, uh, the cable, if the cable lay timelines were what they were. Right. So would you now, I guess as a risk reduction effort, and this seems really silly to have to think about this.

If you have your offshore substation, was the, was the main export cable connected to some of these like revolution wind where they have the injunction right now? Was that export cable connected and were the inter array cables regularly connected to turbines and them coming online? Do, do, do, do, do. Like, it wasn’t like a COD, we turned the switch and we had to wait for all 62 turbines.

Right. So to our [00:04:00] knowledge and, and, uh, please reach out to any of us on LinkedIn or an email or whatever to our knowledge. The turbines that are in production have still have been spinning. It’s the construction activities that have been stopped, but now. Hey, revolution wind is 90% complete and they’re back out and running, uh, on construction activities as of today.

Speaker 2: It was in the last 48 hours. So this, this is a good sign because I think as the other wind farms go through the courts, they’re gonna essentially run through this, this same judge I that. Tends to happen because they have done all the research already. So you, you likely get the same outcome for all the other wind farms, although they have to go through the process.

You can’t do like a class action, at least that’s doesn’t appear to be in play at the minute. Uh, they’re all gonna have to go through this little bit of a process. But what the judge is saying essentially is the concern from the Department of War, and then the Department of Interior is. [00:05:00] Make believe. I, I don’t wanna frame it.

It’s not framed that way, the way it’s written. There’s a lot more legalistic terms about it. But it basically, they’re saying they tried to stop it before they didn’t get the result they wanted. The Trump administration didn’t get the result they wanted. So the Trump administration ramped it up by saying it was something that was classified in, in part of the Department of War.

The judge isn’t buying it. So the, the, the early action. I think what we initially talked about this, everybody, I think the early feeling was they’re trying to stop it, but the fact that they’re trying to stop it just because, and just start pulling permits is not gonna stand outta the court. And when they want to come back and do it again, they’re not likely to win.

If they would. Kept their ammunition dry and just from the beginning said it’s something classified as something defense related that Trump administration probably would’ve had a better shot at this. But now it just seems like everything’s just gonna lead down the pathway where all these projects get finished.

Speaker: Yeah, I think that specific judge probably was listening to the [00:06:00] Uptime podcast last week for his research. Um, listen to, to our opinions that we talked about here, saying that this is kind of all bs. It’s not gonna fly. Uh, but what we’re sitting at here is like Revolution Wind was, had the injunction against it.

Uh, empire Wind had an injunction again, but they were awaiting a similar ruling. So hopefully that’s actually supposed to go down today. That’s Wednesday. Uh, this is, so we’re recording this on Wednesday. Um, and then Dominion is, has, is suing as well, and their, uh, hearing is on Friday. In two, two days from now.

And I would expect, I mean, it’s the same, same judge, same piece of papers, like it’s going to be the same result. Some numbers to throw at this thing. Now, just so the listeners know the impact of this, uh, dominion for the Coastal Virginia Offshore Wind Project, they say that their pause in construction is costing them $5 million a day, and that is.

That’s a pretty round number. It’s a conservative number to be honest with you. For officer operations, how many vessels and how much stuff is out there? That makes sense. Yep. [00:07:00] 5 million. So $5 million a day. And that’s one of the wind farms. Uh, coastal, Virginia Wind Farm is an $11 billion project. With, uh, it’s like 176 turbines.

I think something to that, like it’s, it’s got enough power, it’s gonna have enough production out there to power up, like, uh, like 650,000 homes when it’s done. So there’s five projects suspended right now. I’m continuing with the numbers. Um, well, five, there’s four now. Revolution’s back running, right? So five and there’s four.

Uh, four still stopped. And of those five is 28. Billion dollars in combined capital at risk, right? So you can understand why some of these companies are worried, right? They’re this is, this is not peanuts. Um, so you saw a little bump in like Ted stock in the markets when this, this, uh, revolution wind, uh, injunction was stopped.

Uh, but. You also see that, uh, Moody’s is a credit [00:08:00] rating. They’ve lowered ORs, Ted’s um, rating from stable to negative, given that political risk.

Speaker 2: Well, if you haven’t been paying attention, wind energy O and m Australia 2026 is happening relatively soon. It’s gonna be February 17th and 18th. It’s gonna be at the Pullman Hotel downtown Melbourne.

And we are all looking forward to it. The, the roster and the agenda is, is nearly assembled at this point. Uh, we have a, a couple of last minute speakers, but uh, I’m looking at the agenda and like, wow, if you work in o and m or even are around wind turbines, this is the place to be in February. From my

Speaker: seat.

It’s pretty, it’s, it’s, it’s shaping up for pretty fun. My phone has just been inundated with text message and WhatsApp of when are you traveling? What are your dates looking forward to, and I wanna say this right, Rosie. Looking forward to Melvin. Did I get it? Did I do it okay.

Speaker 3: You know how to say it.

Speaker: So, so we’re, we’re really looking forward to, we’ve got a bunch of people traveling from around the [00:09:00] world, uh, to come and share their collective knowledge, uh, and learn from the Australians about how they’re doing things, what the, what the risks are, what the problems are, uh, really looking forward to the environment down there, like we had last year was very.

Collaborative, the conversations are flowing. Um, so we’re looking forward to it, uh, in a big way from our seats. Over here,

Speaker 2: we are announcing a lightning workshop, and that workshop will be answering all your lightning questions in regards to your turbines Now. Typically when we do this, it’s about $10,000 per seat, and this will be free as part of WMA 2026.

We’re gonna talk about some of the lightning physics, what’s actually happening in the field versus what the OEMs are saying and what the IEC specification indicates. And the big one is force majeure. A lot of operators are paying for damages that are well within the IEC specification, and we’ll explain.[00:10:00]

What that is all about and what you can do to save yourself literally millions of dollars. But that is only possible if you go to Woma 2020 six.com and register today because we’re running outta seats. Once they’re gone, they’re gone. But this is a great opportunity to get your lightning questions answered.

And Rosemary promised me that we’re gonna talk about Vestus turbines. Siemens turbines. GE Renova turbines. Nordex turbines. So if you have Nordex turbines, Sulan turbines, bring the turbine. Type, we’ll talk about it. We’ll get your questions answered, and the goal is that everybody at at Wilma 2026 is gonna go home and save themselves millions of dollars in 26 and millions of dollars in 27 and all the years after, because this Lightning workshop is going to take care of those really frustrating lightning questions that just don’t get answered.

We’re gonna do it right there. Sign up today.

Speaker 3: [00:11:00] You know what, I’m really looking forward to that session and especially ’cause I’ve got a couple of new staff or new-ish staff at, it’s a great way to get them up to speed on lightning. And I think that actually like the majority of people, even if you are struggling with lightning problems every day, I bet that there is a whole bunch that you could learn about the underlying physics of lightning.

And there’s not so many places to find that in the world. I have looked, um, for my staff training, where is the course that I can send them to, to understand all about lightning? I know when I started atm, I had a, an intro session, one-on-one with the, you know, chief Lightning guy there. That’s not so easy to come by, and this is the opportunity where you can get that and better because it’s information about every, every OEM and a bit of a better understanding about how it works so that you can, you know, one of the things that I find working with Lightning is a lot of force MA mature claims.

And then, um, the OEMs, they try and bamboozle you with this like scientific sounding talk. If you understand better, then you’ll be able to do better in those discussions. [00:12:00] So I would highly recommend attending if you can swing the Monday as well.

Speaker: If you wanna attend now and you’re coming to the events.

Reach out to, you can reach out to me directly because what we want to do now is collect, uh, as much information as possible about the specific turbine types of the, that the people in the room are gonna be responsible for. So we can tailor those messages, um, to help you out directly. So feel free to reach out to me, joel.saxo, SAXU m@wglightning.com and uh, we’ll be squared away and ready to roll on Monday.

I think that’s Monday the 16th.

Speaker 2: So while American offshore wind fights for survival in the courts, British offshore wind just had its biggest day ever. The United Kingdom awarded contracts for 8.4 gigawatts. That’s right. 8.4 gigawatts of new offshore wind capacity, the largest auction in European history.

Holy smokes guys. The price came in at about 91 pounds per megawatt hour, and that’s 2024 pounds. [00:13:00] Uh, and that’s roughly 40% cheaper than building a new. Gas plant Energy Secretary Ed Milliband called it a monumental step towards the country’s 2030 clean power goals and that it is, uh, critics say that prices are still higher than previous auctions, and one that the government faces challenges connecting all this new capacity to the grid, and they do, uh, transmission is a limiting factor here, but in terms of where the UK is headed.

Putting in gigawatts of offshore wind is going to disconnect them from a lot of need on the gas supply and other energy sources. It’s a massive auction round. This was way above what I remember being, uh. Talked about when we were in Scotland just a couple of weeks ago, Joel.

Speaker: Yeah, that’s what I was gonna say.

You know, when we were, when we were up with the, or E Catapult event, and we talked to a lot of the different organizations of their OWGP and um, you know, the course, the or e Catapult folks and, and, and a [00:14:00] few others, they were really excited about AR seven. They were like, oh, we’re, we’re so excited. It’s gonna come down, it’s gonna be great.

I didn’t expect these kind of numbers to come out of this thing. Right? ’cause we know that, um, they’ve got about, uh, the UK currently has about. 16 and a half or so gigawatts of offshore wind capacity, um, with, you know, they got a bunch under construction, it’s like 11 under construction, but their goal is to have 43 gigawatts by 2030.

So,

Speaker 2: man.

Speaker: Yeah. And, and when 2030, put this into Conte Con context now. This is one of our first podcasts of the new year. That’s only four years away. Right. It’s soon. And, and to, to be able to do that. So you’re saying they got 16, they go some round numbers. They got 16 now. Pro producing 11 in the pipe, 11 being constructed.

So get that to 27. That’s another 16 gigawatts of wind. They want, they that are not under construction today that they want to have completed in the next four years. That is a monumental effort now. We know that there’s some grid grid complications and connection [00:15:00] requirements and things that will slow that down, but just thinking about remove the grid idea, just thinking about the amount of effort to get those kind of large capital projects done in that short of timeline.

Kudos to the UK ’cause they’re unlocking a lot of, um, a lot of private investment, a lot of effort to get these things, but they’re literally doing the inverse of what we’re doing in the United States right now.

Speaker 2: There would be about a total of 550, 615 ish megawatt turbines in the water. That does seem doable though.

The big question is who’s gonna be providing those turbines? That’s a. Massive order. Whoever the salesperson is involved in that transaction is gonna be very happy. Well, the interesting thing here

Speaker: too is the global context of assets to be able to deliver this. We just got done talking about the troubles at these wind farms in the United States.

As soon as these. Wind farms are finished. There’s not more of them coming to construction phase shortly, right? So all of these assets, all these jack up vessels, these installation vessels, these specialized cable lay vessels, they [00:16:00]can, they can fuel up and freaking head right across, back across the Atlantic and start working on these things.

If the pre all of the engineering and, and the turbine deliveries are ready to roll the vessels, uh, ’cause that you, that, you know, two years ago that was a problem. We were all. Forecasting. Oh, we have this forecasted problem of a shortage of vessels and assets to be able to do installs. And now with the US kind of, basically, once we’re done with the wind farms, we’re working on offshore, now we’re shutting it down.

It frees those back up, right? So the vessels will be there, be ready to roll. You’ll have people coming off of construction projects that know what’s going on, right? That, that know how to, to work these things. So the, the people, the vessels that will be ready to roll it is just, can we get the cables, the mono piles, the turbines and the cells, the blades, all done in time, uh, to make this happen And, and.

I know I’m rambling now, but after leaving that or e Catapult event and talking to some of the people, um, that are supporting those [00:17:00] funds over there, uh, being injected from the, uh, the government, I think that they’ve got

Speaker 2: the, the money flowing over there to get it done too. The big winner in the auction round was RWE and they.

Almost seven gigawatts. So that was a larger share of the 8.4 gigawatts. RWE obviously has a relationship with Vestus. Is that where this is gonna go? They’re gonna be, uh, installing vestus turbines. And where were those tur turbines? As I was informed by Scottish gentlemen, I won’t name names. Uh, will those turbines be built in the uk?

Speaker 3: It’s a lot. It’s a, it’s one of the biggest challenges with, um, the supply chain for wind energy is that it just is so lumpy. So, you know, you get, um, uh. You get huge eight gigawatts all at once and then you have years of, you know, just not much. Not much, not much going on. I mean, for sure they’re not gonna be just building [00:18:00] eight gigawatts worth of, um, wind turbines in the UK in the next couple of years because they would also have to build the capacity to manufacture that and, and then would wanna be building cocks every couple of years for, you know, the next 10 or 20 years.

So, yeah, of course they’re gonna be manufacturing. At facilities around the world and, and transporting them. But, um, yeah, I just, I don’t know. It’s one of the things that I just. Constantly shake my head about is like, how come, especially when projects are government supported, when plans are government supported, why, why can’t we do a better job of smoothing things out so that you can have, you know, for example, local manufacturing because everyone knows that they’ve got a secure pipeline.

It’s just when the government’s involved, it should be possible.

Speaker 2: At least the UK has been putting forth some. Pretty big numbers to support a local supply chain. When we were over in Scotland, they announced 300 million pounds, and that was just one of several. That’s gonna happen over the next year. There will be a [00:19:00] near a billion pounds be put into the supply chain, which will make a dramatic difference.

But I think you’re right. Also, it’s, they’re gonna ramp up and then they, it’s gonna ramp down. They have to find a way to feed the global marketplace at some point, be because the technology and the people are there. It’s a question of. How do you sustain it for a 20, 30 year period? That’s a different question.

Speaker 3: I do agree that the UK is doing a better job than probably anybody else. Um, it it’s just that they, the way that they have chosen to organize these auctions and the government support and the planning just means that they have that, that this is the perfect conditions to, you know. Make a smooth rollout and you know, take care of all this.

And so I just a bit frustrated that they’re not doing more. But you are right that they’re doing the best probably

Speaker 4: once all of these are in service though, aren’t there quite a bit of aftermarket products that are available in the UK

Speaker: on the service then? I think there’s more.

Speaker 4: Which, I mean, that’s good. A good part of it, right?

Speaker: If we’re talking Vestas, so, so let’s just round this [00:20:00] up too. If we’re talking vest’s production for blades in Europe, you have two facilities in Denmark that build V 2 36 blades. You have one facility in Italy that builds V 2 36 blades, Taiwan, but they build them for the APAC market. Of course. Um, Poland had a, has one on hold right now, V 2 36 as well.

Well, they just bought that factory from LM up in Poland also. That’s, but I think that’s for onshore term, onshore blades. Oh, yes, sure. And then Scotland has, they have the proposed facility in, in Laith. That there, that’s kind of on hold as well. So if that one’s proposed, I’m sure, hey, if we get a big order, they’ll spin that up quick because they’ll get, I am, I would imagine someone o you know, one of the, one of the funds to spool up a little bit of money, boom, boom, boom.

’cause they’re turning into local jobs. Local supply

Speaker 2: chain does this then create the condition where a lot of wind turbines, like when we were in Scotland, a lot of those wind turbines are. Gonna reach 20 years old, maybe a little bit older here over the next five years where they will [00:21:00] need to be repowered upgraded, whatever’s gonna happen there.

If you had internal manufacturing. In country that would, you’d think lower the price to go do that. That will be a big effort just like it is in Spain right now.

Speaker: The trouble there though too, is if you’re using local content in, in the uk, the labor prices are so much

Speaker 2: higher. I’m gonna go back to Rosie’s point about sort of the way energy is sold worldwide.

UK has high energy prices, mostly because they are buying energy from other countries and it’s expensive to get it in country. So yes, they can have higher labor prices and still be lower cost compared to the alternatives. It, it’s not the same equation in the US versus uk. It’s, it’s totally different economics, but.

If they get enough power generation, which I think the UK will, they’re gonna offload that and they’re already doing it now. So you can send power to France, send power up [00:22:00] north. There’s ways to sell that extra power and help pay for the system you built. That would make a a lot of sense. It’s very similar to what the Saudis have done for.

Dang near 80 years, which is fill tankers full of oil and sell it. This is a little bit different that we’re just sending electrons through the water to adjacent European countries. It does seem like a plan. I hope they’re sending ’em through a cable in the water and not just into the water. Well, here’s the thing that was concerning early on.

They’re gonna turn it into hydrogen and put it on a ship and send it over to France. Like that didn’t make any sense at all. Uh. Cable’s on the way to do it. Right.

Speaker: And actually, Alan, you and I did have a conversation with someone not too long ago about that triage market and how the project where they put that, that that trans, that HVDC cable next to the tunnel it, and it made and it like paid for itself in a year or something.

Was that like, that they didn’t wanna really tell us like, yeah, it paid for itself in a year. Like it was a, the ROI was like on a, like a $500 million [00:23:00]project or something. That’s crazy. Um, but yeah, that’s the same. That’s, that is, I would say part of the big push in the uk there is, uh, then they can triage that power and send it, send it back across.

Um, like I think Nord Link is the, the cable between Peterhead and Norway, right? So you have, you have a triage market going across to the Scandinavian countries. You have the triage market going to mainland eu. Um, and in when they have big time wind, they’re gonna be able to do it. So when you have an RWE.

Looking at seven gigawatts of, uh, possibility that they just, uh, just procured. Game on. I love it. I think it’s gonna be cool. I’m, I’m happy to see it blow

Speaker 2: up. Canada is getting serious about offshore wind and international developers are paying attention. Q Energy, France and its South Korean partner. Hawa Ocean have submitted applications to develop wind projects off Nova Scotia’s Coast.

The province has big ambitions. Premier, Tim Houston wants to license enough. Offshore [00:24:00] wind to produce 40 gigawatts of power far more than Nova Scotia would ever need. Uh, the extra electricity could supply more than a quarter of Canada’s total demand. If all goes according to plan, the first turbines could be spinning by 2035.

Now, Joel. Yeah, some of this power will go to Canada, but there’s a huge market in the United States also for this power and the capacity factor up in Nova Scotia offshore is really good. Yeah. It’s uh, it

Speaker: is simply, it’s stellar, right? Uh, that whole No, Nova Scotia, new Brunswick, Newfoundland, that whole e even Maritimes of Canada.

The wind, the wind never stops blowing, right? Like I, I go up there every once in a while ’cause my wife is from up there and, uh, it’s miserable sometimes even in the middle of summer. Um, so the, the wind resource is fantastic. The, it, it is a boom or will be a boom for the Canadian market, right? There’re always [00:25:00] that maritime community, they’re always looking for, for, uh, new jobs.

New jobs, new jobs. And this is gonna bring them to them. Um, one thing I wanna flag here is when I know this, when this announcement came out. And I reached out to Tim Houston’s office to try to get him on the podcast, and I haven’t gotten a response yet. Nova Scotia. So if someone that’s listening can get ahold of Tim Houston, we’d love to talk to him about the plans for Nova Scotia.

Um, but, but we see that just like we see over overseas, the triage market of we’re making power, we can sell it. You know, we balance out the prices, we can sell it to other places. From our seats here we’ve been talking about. The electricity demand on the east coast of the United States for, for years and how it is just climbing, climbing, climbing, especially AI data centers.

Virginia is a hub of this, right? They need power and we’re shooting ourselves in the foot, foot for offshore wind, plus also canceling pipelines and like there’s no extra generation going on there except for some solar plants where you can squeeze ’em in down in the Carolinas and whatnot. [00:26:00] There is a massive play here for the Canadians to be able to HVD see some power down to us.

Speaker 2: The offshore conditions off the coast of Nova Scotia are pretty rough, and the capacity factor being so high makes me think of some of the Brazilian wind farms where the capacity factor is over 50%. It’s amazing down there, but one of the outcomes of that has been early turbine problems. And I’m wondering if the Nova Scotia market is going to demand a different kind of turbine that is specifically built for those conditions.

It’s cold, really cold. It’s really windy. There’s a lot of moisture in the air, right? So the salt is gonna be bad. Uh, and then the sea life too, right? There’s a lot of, uh, sea life off the coast of the Nova Scotia, which everybody’s gonna be concerned about. Obviously, as this gets rolling. How do we think about this?

And who’s gonna be the manufacturer of turbines for Canada? Is it gonna be Nordics? Well,

Speaker: let’s start from the ground up there. So from the or ground up, it’s, how about sea [00:27:00] floor up? Let’s start from there. There is a lot of really, really, if you’ve ever worked in the offshore world, the o offshore, maritime Canadian universities that focus on the, on offshore construction, they produce some of the best engineers for those markets, right?

So if you go down to Houston, Texas where there’s offshore oil and gas companies and engineering companies everywhere, you run into Canadians from the Maritimes all over the place ’cause they’re really good at what they do. Um, they are developing or they have developed offshore oil and gas platforms.

Off of the coast of Newfoundland and up, up in that area. And there’s some crazy stuff you have to compete with, right? So you have icebergs up there. There’s no icebergs in the North Atlantic that like, you know, horn seats, internet cruising through horn C3 with icebergs. So they’ve, they’ve engineered and created foundations and things that can deal with that, those situations up there.

But you also have to remember that you’re in the Canadian Shield, which is, um, the Canadian Shield is a geotechnical formation, right? So it’s very rocky. Um, and it’s not [00:28:00] like, uh, the other places where we’re putting fixed bottom wind in where you just pound the piles into the sand. That’s not how it’s going to go, uh, up in Canada there.

So there’s some different engineering that’s going to have to take place for the foundations, but like you said, Alan Turbine specific. It blows up there. Right. And we have seen onshore, even in the United States, when you get to areas that have high capacity burning out main bearings, burning out generators prematurely because the capacity factor is so high and those turbines are just churning.

Um, I, I don’t know if any of the offshore wind turbine manufacturers are adjusting any designs specifically for any markets. I, I just don’t know that. Um, but they may run into some. Some tough stuff up there, right? You might run into some, some overspeeding main bearings and some maintenance issues, specifically in the wintertime ’cause it is nasty up there.

Speaker 2: Well, if you have 40 gigawatts of capacity, you have several thousand turbines, you wanna make sure really [00:29:00] sure that the blade design is right, that the gearbox is right if you have a gearbox, and that everything is essentially over-designed, heated. You can have deicing systems on it, I would assume that would be something you would be thinking about.

You do the same thing for the monopoles. The whole assembly’s gotta be, have a, just a different thought process than a turbine. You would stick off the coast of Germany. Still rough conditions at times, but not like Nova Scotia.

Speaker: One, one other thing there to think about too that we haven’t dealt with, um.

In such extreme levels is the, the off the coast of No. Nova Scotia is the Bay of Fundee. If you know anything about the Bay of Fundee, it is the highest tide swings in the world. So the tide swings at certain times of the year, can be upwards of 10 meters in a 12 hour period in this area of, of the ocean.

And that comes with it. Different time, different types of, um, one of the difficult things for tide swings is it creates subsid currents. [00:30:00] Subsid currents are, are really, really, really bad, nasty. Against rocks and for any kind of cable lay activities and longevity of cable lay scour protection around turbines and stuff like that.

So that’s another thing that subsea that we really haven’t spoke about.

Speaker 3: You know, I knew when you say Bay Bay of funding, I’m like, I know that I have heard that place before and it’s when I was researching for. Tidal power videos for Tidal Stream. It’s like the best place to, to generate electricity from.

Yeah, from Tidal Stream. So I guess if you are gonna be whacking wind turbines in there anyway, maybe you can share some infrastructure and Yeah. Eca a little bit, a little bit more from your, your project.

Speaker 2: that wraps up another episode of the Uptime Wind Energy Podcast. If today’s discussion sparked any questions or ideas. We’d love to hear from you. Just reach out to us on LinkedIn and don’t forget to subscribe so you never miss an episode.

And if you found value in today’s conversation, please leave us a review. It really helps other wind energy professionals discover the show For Rosie, Yolanda and Joel, I’m Alan Hall, and we’ll see you here next week on the Uptime [00:36:00] Wind Energy Podcast.

UK Awards 8.4 GW Offshore, US Allows Offshore Construction

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com