I composed this essay over much of 2026, as I was writing Beyond Vogtle — my detailed study (co-authored with James Boucher) of U.S. nuclear costs from the 1980s post-Three Mile Island reactors to the Vogtle 3 and 4 units completed earlier in this decade. It traces my journey from nuclear power doubter to proponent.
My story is both general and personal: what was changing in the wide world of nuclear power, energy policy and climate; and how I viewed those changes. I hope this mode of story-telling resonates with a wide audience and also provide a backdrop to “Beyond Vogtle.”
It’s in three parts.
Detail from 1979 rally poster. Full poster appears below.
The first installment begins at the big Washington rally called to mark the Three Mile Island reactor accident, and covers the recession of nuclear dread, the advent of virtually always-on reactor operation, and nuclear’s status as the least carbon-emitting energy supply technology.
Installment #2 begins with the failure (to date) of carbon tax advocacy — “A Climate Cure No One Wanted” — and continues with the closure of Indian Point and the concurrent slow dissolve of my dream that renewable energy could do it all.
The third and final installment begins with a slight detour in which I contrast the appalling human damage from automobility with nuclear power’s increasingly remote dangers, and then return to energy policy with a fresh way to regard nuclear power’s potential contribution to decarbonizing U.S. grids.
Thank for reading. Enjoy. And be sure to look at Beyond Vogtle: What History Tells Us About the Cost of New Nuclear (yes, that’s the full title).
— C.K.
* * * * * * * * *
I’m pro-nuclear power. Big time.
I don’t just want the U.S. to keep running its 95 extant reactors. I want us to build more. Lots more. Hundreds.
I’m not alone. Public opinion is shifting toward nuclear power. But I came to that conclusion after spending years arguing the other side. From the mid-1970s to the late 1980s, I published a raft of critical analyses that got a good deal of public attention ― and even some traction within the nuclear industry itself. My core argument was that the cost of building nuclear plants was rising much faster than the costs of competing sources of energy. The main driver, I said, was a cascade of safety-requirement changes triggered by widespread fears of reactor accidents.
Here’s the full poster.
That work earned me a speaking spot at the massive May 6, 1979 rally in Washington demanding a halt to reactor construction in the wake of the March 28 meltdown at Three Mile Island in Pennsylvania. In the weeks before the rally, my research was cited in hundreds of news stories. At the Capitol, I stood alongside consumer advocate Ralph Nader, the leading figure in the U.S. antinuke movement; actress Jane Fonda, whose new film, “The China Syndrome,” had eerily foretold the Three Mile Island meltdown; and folk-rock icon Jackson Browne. I told the cheering throng that nuclear power was finished.
Cost overruns and canceled reactor projects were putting billions of dollars on the line, and I spent much of the next decade in courtrooms all over the country, explaining patiently to utility regulators why investors, not customers, should bear those losses. I eventually moved on to other public policy work, sparking big-city bicycling and helping bring congestion pricing to New York. But I kept watching nuclear power and the broader energy landscape. Over time, what I saw led me to turn from skeptic to supporter. Here’s why, in eight parts.
1. Fear and Dread Recede
Ask 100 random people today what “TMI” means, and at least 90 will say “Too Much Information.” Maybe one will mention the 1979 accident at Three Mile Island.
That’s a real shift.
The 1970s were commercial nuclear power’s first decade, and the Three Mile Island accident brought it to a terrifying close. Sixty hours into the slow-unfolding crisis, as fears grew that a “hydrogen bubble” in the reactor might explode and rupture the containment dome, CBS Evening News anchor Walter Cronkite captured the nation’s dread: “The world has never known a day quite like today. It faced the considerable uncertainties and dangers of the worst nuclear power plant accident of the atomic age. And the horror tonight is that it could get much worse.”[1]
The stricken reactor was eventually stabilized. But a combination of soaring costs and public apprehension brought an end to nuclear power’s rapid expansion in the United States.
Cronkite’s warning was about Three Mile Island itself, but it seemed to foreshadow more disasters to come. Yet since 1979, the U.S. nuclear industry has accumulated nearly 20 times as much reactor operating experience as it had built up in its entire history before the meltdown, without a sequel.[2] Like the dog that didn’t bark, this quiet fadeout of reactor calamities is an overlooked shift ― and it is prompting a rethink of long-held certitudes about nuclear power.
With each passing year there are fewer people who grew up with dread from Cold War-era A-bomb drills and weapons test fallout that got bundled into nuclear power. There are more young people like Zeke, a Brooklyn high-schooler who in 2019 went to Battery Park City to greet climate activist Greta Thunberg after her sail-powered trans-Atlantic voyage, but who this past May called fears about nuclear power “over-exaggerated.”[3] (Thunberg herself has said that Germany made a mistake by phasing out its nuclear plants, since it led to a sharp rise in coal-fired electricity.)
I’ve heard the same sentiment in hundreds of casual conversations over the past decade ― at climate rallies and on Trader Joe’s checkout lines, in California and in New York. These conversations suggest that the oppositional currents that once compelled federal nuclear regulators to keep piling on costly new safety requirements are losing force.
2. Permanent Peak Performance
Even before construction costs began to soar in the 1970s, nuclear power had another Achilles heel: spotty operating performance.
Throughout the 1970s and 1980s, the U.S. nuclear power sector struggled to maintain even a 60 percent “capacity factor” ― a measure of how much of a plant’s potential output it generates. That’s a dismal rate for equipment that’s expensive to build. I know this because I researched and wrote the first full-length study of shortfalls in U.S. nuclear plant performance, in 1976.[4]
That started to change in the mid-1980s. Plants finished safety upgrades required after Three Mile Island. The industry began sharing best practices ― and mistakes to avoid. Economic incentives helped too, as utility earnings became tied to how often plants actually ran.
A remarkable turnaround, though seldom credited in climate and nuclear discourse.
The turnaround has been dramatic. Since 2000, U.S. nuclear plants have averaged 90 percent capacity factor ― a huge leap from the earlier 60 percent. In effect, downtime has dropped four-fold, from 40 percent of the time to just 10 percent. Repair jobs and retrofits that used to drag on are now precision-scheduled like the train heist in “Breaking Bad.”
The higher reliability brings a huge symbolic benefit. In the 1970s, U.S. reactors seemed to stumble from one fiasco to the next. In Alabama, a technician using a lit candle to locate an air leak started a fire that burned through a thousand cables and knocked two brand-new reactors offline for 19 months. At some ocean-cooled plants, saltwater corroded delicate heat-transfer tubes, forcing protracted repairs. Profits and industry morale took a beating, and nuclear power became a punchline on “The Simpsons.”
Those days are long past. Nuclear power, uniquely, has blossomed into both grid bulwark and climate hero. Thanks to those higher ― much higher! ― capacity factors, each nuclear plant now displaces 50 percent more carbon-emitting power generation than it used to.[5] In fact, at a 90 percent capacity factor, a kilowatt of nuclear power delivers double or triple the climate benefit of a kilowatt of wind power (which averages 30 to 40 percent capacity factor) and roughly five times that of solar (15 to 20 percent) ― a crucial distinction that’s often missing from gushing coverage of renewable energy.
3. Climate to the Fore
Nuclear power’s newfound operational mastery would matter much less but for the urgency of the climate crisis and the persistence of U.S. and global carbon emissions. Like wind and solar, nuclear power generates electricity without burning carbon.
Squint to see that nuclear lifecycle greenhouse gas emissions range from 5.1 to 6.4 (in g CO2 equivalent per kWh); analogous range for solar-PV is 7.4 – 83.0; wind, 7.8 – 23.0. Source, Dinon et al., in report linked in this section’s second paragraph.
It is true that fossil fuels are implicated in nuclear power’s supply chain. Uranium mining uses petroleum, and enriching nuclear fuel requires electricity. But even counting upstream carbon, nuclear power’s climate footprint is smaller than that of wind, solar or hydropower, according to an authoritative 2022 analysis by a multinational team for the UN Economic Commission for Europe. (Their finding matched that of the similarly comprehensive 2018 report by the UN-chartered Intergovernmental Panel on Climate Change.[6])
That’s another big change. In nuclear power’s early years, uranium fuel enrichment was so energy-intensive that the three U.S. “gaseous diffusion” plants were said to consume 10 percent of all electricity used by American factories. But diffusion enrichment has given way to gas centrifuges and, more recently, laser isotopic separation ― methods that use 20 times less energy to isolate fissile U-235 from U-238.
The bottom line: kilowatt-hour for kilowatt-hour, nuclear-generated electricity is at least as effective as solar and wind at cutting climate pollution. Meanwhile, Hurricane Katrina, Superstorm Sandy, “heat domes” and wildfires, and, in August, the first Himalayan glacial collapse, have made once-hypothetical climate death and disruption a daily reality. More than rising electricity demand from A.I., it’s the climate crisis that’s driving renewed interest in nuclear power.
Click here for the second installment, Why I’m Pro-Nuke Now: Beginning.
[1] Quoted passage is from a local (PA) news site, though the an archived Channel 2 broadcast it cited is no longer on line.
[2] The sole “near-miss,” and a major one, was the 2002 discovery by operators at the Davis-Besse nuclear plant near Toledo, OH of extensive corrosion of the reactor vessel head — a vital barrier against loss of coolant and release of radiation. The U.S. General Accounting Office sternly rebuked the Nuclear Regulatory Commission for failing to identify and prevent the corrosion. See GAO, Nuclear Regulation: NRC Needs to More Aggressively and Comprehensively Resolve Issues Related to the Davis-Besse Nuclear Power Plant’s Shutdown, GAO-04-415, May 2004.
[3] In-person conversation at People’s Policy Conference at the New School for Social Research in New York, May 2, 2026.
[4] C. Komanoff, Power Plant Performance: Nuclear and Coal Capacity Factors and Economics (15 MB pdf), Council on Economic Priorities, 1976.
[5] Dividing today’s 90% uptime by the former 60% yields 1.50, indicating 50 percent more kilowatt-hours per kW.
[6] IPCC Annex III report, Technology-Specific Cost and Performance Parameters, 2018. See table on p. 1333.
Carbon Footprint
The Economics of Nature-Based Investments: What CFOs Need to Model
Build the cash-flow case before the carbon-revenue line.
Your finance team receives a proposal for restoring land in a sourcing region. The spreadsheet has a planting budget, an attractive carbon estimate and a line called “resilience value.” Nobody can explain which invoice that last line would reduce.
The economics of nature-based investments need the same scrutiny as any other spending decision. Start with the business exposure, compare practical alternatives and identify who receives each benefit. Then test whether the project earns its place in your budget under weaker assumptions. CCC’s CFO’s Guide to Nature Based Solutions sets out the broader strategic case. Here, you will build the model behind the funding request.
The four cost categories you can model now
Give every cost an owner, payment date and basis of estimate. Your model needs four categories:
- Design and establishment. Include site assessment, rights checks, baseline work and implementation. Separate land measures from other improvements, such as better drying equipment, so you can compare what each component achieves.
- Supplier participation and maintenance. Cost training, farmer payments, upkeep and replacement of failed plantings. Record who bears each expense and how long support continues. A buyer’s contribution may cover only part of the total project budget.
- Measurement and assurance. Include data collection, monitoring and verification where required. Credit certification, if pursued, needs its own budget. WRI’s financial-sector guidebook identifies high transaction costs as a barrier for smaller nature-based projects.1
- Financing and risk management. Include financing fees, insurance premiums and expected remediation spending. Show working-capital requirements separately from operating costs. A contingency funding allowance also needs a clear purpose and drawdown rule.
Build the model around incremental cash flows: what changes because you fund this proposal? Compare it with continuing current practices and with credible alternatives. For a coffee buyer, those might include storage improvements or a different sourcing arrangement. Do not assign every future procurement saving to the landscape project.
Specify the currency and whether costs rise with inflation. Keep tax assumptions consistent with the discount rate. Add an estimate range where a supplier quote or site assessment is still missing.
The two return categories to test separately
Start with changes in recurring operating cash flow. Better input quality might reduce processing losses; more efficient water use might lower bills. Record the baseline, expected change and evidence linking the intervention to it. A supplier’s higher yield becomes a buyer benefit only through a defined mechanism, such as more contracted volume or a change in purchase cost.
Then assess reductions in expected disruption losses. Identify a specific event, its financial consequence and the assumed change in probability or severity. If a sourcing interruption has an assumed 20% annual probability and would cost $1 million, its expected annual loss is $200,000. An intervention assumed to lower that probability to 15% creates a hypothetical $50,000 annual benefit. Those assumptions need evidence before becoming a funding forecast.
Keep the two categories distinct. If lower rejection rates already reduce emergency purchasing in your operating forecast, adding the same saving under resilience would count it twice. WRI distinguishes risk mitigation and resilience from financial growth opportunities; neither category guarantees a return to a particular buyer.1
Maintain a separate record of environmental outcomes that you cannot credibly monetize. UNEP’s 2023 finance-for-nature assessment describes the global funding challenge, rather than establishing a return for your project.2 A biodiversity objective can matter to your decision without becoming an invented cash receipt.
Carbon income needs another schedule. Test eligibility, ownership, issuance timing and selling costs before adding revenue. The World Bank dashboard covers different carbon-pricing instruments; a tax rate or allowance price does not establish what your project’s credits could sell for.3 Start the base case with zero carbon receipts and show any supported carbon scenario separately.
Multi-year P&L treatment options
Separate the investment appraisal from the accounting treatment. A4S’s capital-investment guidance provides a framework for bringing sustainability considerations into investment decisions.4 Your cash-flow model should show the proposal’s funding needs and economic assumptions before the controller maps it into the accounts.
The contract matters. Are you buying ongoing services, paying suppliers in advance, acquiring an interest in an entity, or obtaining an asset your company controls? Ask your controller to document the applicable recognition policy for the arrangement. The word “investment” on a proposal does not settle whether expenditure can be capitalized.
Prepare a bridge from project cash payments to forecast profit and loss. Show when services are received, when any recognized asset would be consumed, and what obligations could remain after the purchasing contract ends. Confirm the treatment with your accounting team before circulating the board pack.
For background on disclosure and credit-quality questions, see CCC’s 2025 Year in Review. Cost the actual reporting work in your proposal rather than assigning a generic compliance premium.
Do not count depreciation as another cash payment in a model that already includes the asset purchase. Equally, do not treat a benefit included in an investment appraisal as revenue recognized in the accounts. The economics of nature-based investments can support a spending decision while the environmental outcome still requires separate verification.
Where insurance and reserves fit
List the losses you expect a policy to cover, then check the actual exclusions, limits and deductible. Keep uncovered exposure visible. Ask how a claim would be evidenced and how long payment could take. Model a delayed recovery where the business would need cash before an insurer pays.
Distinguish insurance from a carbon-program buffer and from your own contingency funding. If the proposal relies on a buffer to address a carbon reversal, establish what it protects and which commercial losses remain with you. Require the relevant program rules and contract terms; do not assume that lost supply volumes would be compensated.
A budget contingency is also different from an accounting provision. Have the controller review whether any accounting recognition is required. In the cash forecast, show the expected remediation spending and a separate liquidity stress, rather than charging the full allowance and the same expected loss twice.
Before signing, allocate responsibility for maintenance and restoration if the intervention fails. Review those obligations alongside exit terms and the length of your purchasing relationship. A five-year financial forecast may sit inside a much longer stewardship commitment.
A worked example at three commodity exposures
The following illustration uses invented assumptions, not CCC project results or market benchmarks. Coffee, cocoa and cotton label three annual procurement-spend exposures; they do not rank the commodities’ investment potential.
Assume $150,000 paid at signing and $40,000 of annual costs in years one through five. From year two, assume gross benefits equal 1.2% of annual sourcing spend: 0.4% from routine savings and a separate 0.8% from lower expected disruption losses. This simplified example excludes insurance premiums and contingency spending. Assume no carbon receipts, taxes, inflation, financing cash flows or terminal value. Discount year-end cash flows at 8%.
| Illustrative exposure | Annual sourcing spend | Base-case NPV | Downside NPV |
|---|---|---|---|
| Coffee | $5 million | −$126,000 | −$217,000 |
| Cocoa | $10 million | +$58,000 | −$124,000 |
| Cotton | $20 million | +$426,000 | +$61,000 |
NPV, or net present value, discounts future net cash flows and subtracts the initial payment. The downside cuts both benefit assumptions by 30% and delays their start to year three. Annual costs continue throughout the same five-year window. Values are rounded to the nearest $1,000.
The middle case changes from positive to negative. A reasonable response would be to narrow the pilot or gather better evidence before approving expansion. Holding costs constant across exposures is a sensitivity exercise; a real project would need a separate design and budget at each scale.
The economics of nature-based investments become useful when you can explain what changes the decision. Carbon Credit Capital’s Dual-Value Model examines supply-chain economics alongside potential sustainability outcomes. Bring your finance and sustainability teams together to compare a proposed engagement with your existing carbon spend. Schedule a consultation.
Sources
- World Resources Institute, Financial Sector Guidebook on Nature-Based Solutions Investment: Aligning Investment With Impacts and Showcasing Examples, June 2025, pp. 6–7 and 13.

- United Nations Environment Programme, State of Finance for Nature 2023, 2023. Historical finance-flow context; not a project return benchmark.

- World Bank, Carbon Pricing Dashboard, instrument categories for emissions trading systems, carbon taxes and crediting, accessed 25 November 2026.

- Accounting for Sustainability, Essential Guide to Capex, pp. 18–21. Original guide content; the 2019 PDF updated cover and colours only. Accessed 25 November 2026.

Carbon Footprint
Carbon credit providers vs marketplaces: who does what
Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.
![]()
Carbon Footprint
Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”
Democrats, Take The Deal. New York Times editorial, Nov. 12.
-
Climate Change1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Renewable Energy1 year agoSending Progressive Philanthropist George Soros to Prison?
-
Greenhouse Gases1 year ago
嘉宾来稿:探究火山喷发如何影响气候预测
-
Climate Change2 years agoAnalysis: China’s CO2 falls 1% in Q2 2024 in first quarterly drop since Covid-19
-
Climate Change1 year ago嘉宾来稿:探究火山喷发如何影响气候预测
-