Uranium Royalty Corp. (NASDAQ: UROY, TSX: URC) recently announced the acquisition of a royalty on the Millennium and Cree Extension Uranium Projects located in Saskatchewan, Canada. The company purchased this royalty from a third-party industrial gas firm for $6 million in cash.
Scott Melbye, Chief Executive Officer of Uranium Royalty Corp. stated:
“We are very excited to acquire this significant royalty on the Millennium and Cree Extension Projects. Cameco has previously completed substantial development work on the Millennium project and it remains one of the largest undeveloped projects in Cameco’s portfolio. It represents an important potential contributor to the future global production pipeline. The transaction is another example of our ability to leverage the URC team’s experience and networks to source and execute accretive uranium royalty transactions.”
The Millennium Project
The Millennium Project is an advanced-stage conventional uranium project located 36 km northwest of Cameco’s Key Lake Mill in Saskatchewan, Canada. This project is a joint venture between Cameco and Japan Canada Uranium (JCU). Cameco holds a 69.9% equity share and operates the project.
As one of the largest global suppliers of uranium fuel, Cameco plays a vital role in promoting a clean-energy future. JCU, a Canadian exploration company, focuses on Saskatchewan’s Athabasca Basin and is jointly owned by Uranium Energy Corp. and Denison Mines Corp.

Figure: Location of the Millennium deposit – Source: Cameco Corporation website
The Cree Extension Project
The Cree Extension Project is currently in the exploration stage and is situated 36 kilometers northwest of Cameco’s Key Lake Mill. This project is a joint venture between Cameco, Orano Canada Inc., and JCU. The land is located to the west of Denison’s Wheeler River project and southwest of Cameco’s McArthur River project.
Cameco’s Uranium Revelation
Cameco Corporation, headquartered in Saskatchewan, Canada is the operator of the Millennium and Cree Extension Uranium Projects. The company submitted an Environmental Impact Statement (EIS) in 2009. The EIS outlined plans for the project to produce between 150,000 and 200,000 tons of ore annually, with a potential mine life of 10 years.
They reported that:
- The Millennium Project contains an estimated 1.4 million tons of resources at an average grade of 2.39% U3O8. This equates to 75.9 million pounds of U3O8 in the indicated category.
- Additionally, it has 0.4 million tonnes at an average grade of 3.19% U3O8, totaling 29.0 million pounds in the inferred category.
However, on May 15, 2014, Cameco decided to withdraw the EIS application due to unfavorable market conditions at that time.
The Millennium and Cree Extension Royalty
The press release revealed that the royalty consists of a 10% net profit interest (NPI) based on an approximate 20.6955% participating interest in the projects. This participating interest was transferred to the current owners in 1992.
In this profit-based arrangement, royalties are calculated from the revenue generated, with deductions allowed for certain expenses, including cumulative development costs. Royalties are only payable after all eligible preproduction expenses are recovered.
By securing royalties on these two projects, URC gains rights to about 12,800 hectares in the Athabasca Basin, which has the world’s top mining areas.
Uranium Royalty Corp.: Powering Decarbonization with Nuclear Efficiency
The only pure-play uranium royalty company is focused on capturing value from uranium price shifts through strategic investments. These include royalties, streams, debt, equity in uranium companies, and even physical uranium holdings. Notably, the company is growing with the rising demand for uranium.
- IEA revealed that in the U.S. alone, nuclear energy supplied roughly 19% of total electricity in 2022 and accounted for 55% of the nation’s carbon-free electricity.
- This nuclear output mitigated around 482 MMT of CO₂ emissions, which is equivalent to taking 107 million gasoline-powered vehicles off the roads.
More Power per Punch: Nuclear Energy Outshines Fossil Fuels

The U.S. government is boosting nuclear energy with a $6 billion program from the bipartisan Infrastructure Bill to support plants shifting to clean energy. The Inflation Reduction Act also offers Production Tax Credits that can drive investments to the upgradation of plants.
Nuclear energy is not only one of the safest but also among the most cost-effective and economical ways to achieve the decarbonization target.
Moving on and talking about sustainability, Uranium Royalty Corp. will collaborate with its property manager to measure emissions from its corporate office (Scope 1 and 2) for FY 2023. Additionally, the uranium miner will explore opportunities to co-invest with operators to advance shared sustainability priorities.
Disclosure: Owners, members, directors and employees of carboncredits.com have/may have stock or option position in any of the companies mentioned:
Carboncredits.com receives compensation for this publication and has a business relationship with any company whose stock(s) is/are mentioned in this article
Additional disclosure: This communication serves the sole purpose of adding value to the research process and is for information only. Please do your own due diligence. Every investment in securities mentioned in publications of carboncredits.com involve risks which could lead to a total loss of the invested capital.
Please read our Full RISKS and DISCLOSURE here.
The post Strategic Acquisition: Uranium Royalty Corp. Adds Cameco’s Uranium Projects to its Portfolio appeared first on Carbon Credits.
Carbon Footprint
Carbon credit providers vs marketplaces: who does what
Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.
![]()
Carbon Footprint
Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”
Democrats, Take The Deal. New York Times editorial, Nov. 12.
Carbon Footprint
Designing an Insetting Program: A Step-by-Step Playbook for Procurement
Insetting program design starts with your supplier map. The carbon claim comes much later.
Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.
If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.
Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.
Step 1: Insetting program design starts with supplier mapping
Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.
The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]
Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.
If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]
Step 2: Choose a commodity and jurisdiction for a pilot
Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.
Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.
Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.
Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.
Step 3: Design the supplier engagement and commercial model
The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.
Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]
Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]
Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.
Step 4: Build monitoring, reporting, and verification before rollout
Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.
For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.
CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.
Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]
Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.
Step 5: Decide what can be reported and claimed
Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.
SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”
Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.
What good looks like by year three
Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.
Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.
Discuss your insetting program with CCC
Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.
Sources
[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance
[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf
[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/
[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard
-
Climate Change1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Renewable Energy1 year agoSending Progressive Philanthropist George Soros to Prison?
-
Greenhouse Gases1 year ago
嘉宾来稿:探究火山喷发如何影响气候预测
-
Climate Change2 years agoAnalysis: China’s CO2 falls 1% in Q2 2024 in first quarterly drop since Covid-19
-
Climate Change1 year ago嘉宾来稿:探究火山喷发如何影响气候预测
-
Renewable Energy5 months agoSend a Bible to a Starving Child
-
Green Living2 years agoOur Picks for the Top 2024 Black Friday and Cyber Week Sales From Sustainable Brands

