The Golden Plains Wind Farm key Elements
The Golden Plains Wind Farm is a true giant in the Australian renewable energy sector, not only in terms of size and capacity but also in its positive impact on the environment, economy, and local community.
Its statistics paint a clear picture of a project that is making a significant contribution to Australia’s transition towards a cleaner future.
The Golden Plains Wind Farm in Australia is a massive and ambitious project set to be a landmark in the country’s clean energy journey.
Here’s a comprehensive overview:
Project Scope:
- Location: Golden Plains Shire, Victoria, roughly 60 km northwest of Geelong.
- Size: Sprawling across 16,739 hectares, it’s planned to be Australia’s largest wind farm.
- Capacity: Divided into two stages, the total generating capacity will be a staggering 1,332.4 MW.
- Stage 1: Operational since September 2024, it features 122 turbines with a combined capacity of 420 MW, enough to power over 200,000 homes.
- Stage 2 (West): Still under construction, this stage will have 93 turbines with a capacity of 800 MW. Completion is targeted for 2025.
Impact and Benefits:
- Clean Energy: Upon completion, the Golden Plains Wind Farm will generate over 4,000 GWh of electricity annually, enough to power over 765,000 homes and offset 4.5 million tonnes of carbon dioxide emissions per year.
- Economic Boost: The project is estimated to create over 1,200 jobs during construction and 30 ongoing operational positions. It will also bring significant investment to the Golden Plains Shire.
- Community Engagement: The developers are committed to working closely with the local community, providing opportunities for education, training, and employment.
Key Players:
- Stage 1: Developed by TagEnergy (85%) and Ingka Group (15%).
- Stage 2 (West): Owned and developed by WestWind Energy.
The Golden Plains Wind Farm in Australia stands as a testament to the country’s commitment to clean energy. Here are some of its impressive statistics:
Location:
- Golden Plains Shire, Victoria, Australia
- Approximately 60 km northwest of Geelong
Size:
- Total Land Area: 16,739 hectares (larger than the city of Paris!)
- Planned to be Australia’s largest wind farm once fully operational
Capacity:
- Total: 1,332.4 megawatts (MW) – enough to power over 765,000 homes
- Stage 1 (Operational): 420 MW (powering over 200,000 homes)
- 122 turbines, each with a 3.5 MW capacity
- Stage 2 (West): 901 MW (under construction)
- 93 turbines, each with a 9.7 MW capacity
- Expected completion in 2025
Energy Production:
- Over 4,000 GWh of electricity annually
- Reduces carbon dioxide emissions by 4.5 million tonnes per year
Economic Impact:
- Created over 1,200 jobs during construction
- Provides 30 ongoing operational positions
- Significant investment boost for the Golden Plains Shire
Community Engagement:
- Collaborates with the local community on education, training, and employment opportunities
Sustainability:
- Reduces reliance on fossil fuels
- Promotes clean energy generation
- Contributes to a more sustainable future for Australia
Golden Plains Wind Farm: Statistics at a Glance
| Stat | Details |
|---|---|
| Location | Golden Plains Shire, Victoria, Australia |
| Land Area | 16,739 hectares |
| Total Capacity | 1,332.4 MW |
| Stage 1 Capacity | 420 MW |
| * Number of Turbines | 122 |
| * Turbine Capacity | 3.5 MW each |
| Stage 2 Capacity (West) | 901 MW |
| * Number of Turbines | 93 |
| * Turbine Capacity | 9.7 MW each |
| Annual Energy Production | Over 4,000 GWh |
| Carbon Dioxide Emission Reduction | 4.5 million tonnes per year |
| Construction Jobs Created | Over 1,200 |
| Ongoing Operational Positions | 30 |
This table summarizes the key statistics of the Golden Plains Wind Farm, providing a quick and comprehensive overview of its size, capacity, energy production, and impact.
The Golden Plains Wind Farm is a monumental undertaking that promises to be a game-changer for Australia’s renewable energy landscape. It will not only generate clean power but also create jobs, stimulate the local economy, and contribute to a more sustainable future.
https://www.exaputra.com/2024/01/golden-plains-wind-farm-australia.html
Renewable Energy
How Should the Measles/Mumps/Rubella Vaccine Be Administered? Should You Ask a High School Baseball Coach?
There are so many things going wrong in this country simultaneously that it’s hard to list them all.
Here’s something that no one could have seen coming: (see short video here) crackpot politicians giving parents insane medical advice about how to care for their children.
If I told you that our country’s parents were making decisions on vaccinating their children based on information provided by figure skaters or lawn mower salesmen, you wouldn’t believe me.
But the case is actually worse; it’s coming from the White House.
Renewable Energy
Do Americans Approve of Our Country’s Execution of Innocent People?
In this short video on the bombing of ships leaving Venezuela, President Trump asserts that drug overdoses took like lives of more than 350,000 people last year, a figure that, according to the CDC, is actually 79,383.
In any case, the video fails to mention that executing people who have not been charged with and convicted of a crime is a violation of both domestic and international law.
Do Americans Approve of Our Country’s Execution of Innocent People?
Renewable Energy
Why January 6th Wasn’t the End of Trump/MAGA
Keep in mind that, in 2020, more than 70 million voters cast their ballots for Trump, who, though he is a pathological liar, is 100% trusted by his supporters. When Trump said the election was rigged, the vast majority of these folks believed him. Even today, more than five years later, there are still millions of people who believe there was rampant voter fraud in the election.
Now, is storming the Capitol and beating up/killing law enforcement personnel an acceptable solution? It wouldn’t be for you or me, or most people, but imagine you’re an uneducated white-supremacist MAGA guy, and your president is telling you to do whatever’s necessary to prevent the election from being certified.
These are people who were so desperate to hang Mike Pence that the vice president had to be escorted out of the Capitol building to a secret and secure location, so he didn’t end up at the end of a rope.
When asked about this, Trump replied, “Maybe he deserved it.” To anyone trying to make sense of this, remember that you’re dealing with a deeply disturbed individual, and many millions of truly pathetic people who believe his is an honest and effective servant of the American people. In congress, we have a couple of hundred of the most terrible butt-kissers imaginable, all clamoring to curry favor with him.
-
Climate Change2 years ago
Spanish-language misinformation on renewable energy spreads online, report shows
-
Climate Change3 months ago
Guest post: Why China is still building new coal – and when it might stop
-
Climate Change Videos2 years ago
The toxic gas flares fuelling Nigeria’s climate change – BBC News
-
Greenhouse Gases1 year ago嘉宾来稿:满足中国增长的用电需求 光伏加储能“比新建煤电更实惠”
-
Greenhouse Gases3 months ago
Guest post: Why China is still building new coal – and when it might stop
-
Climate Change1 year ago嘉宾来稿:满足中国增长的用电需求 光伏加储能“比新建煤电更实惠”
-
Carbon Footprint2 years agoUS SEC’s Climate Disclosure Rules Spur Renewed Interest in Carbon Credits
-
Renewable Energy3 months ago
US Grid Strain, Possible Allete Sale



