Connect with us

Published

on

China and Indonesia partnered for a series of business agreements worth $10 billion during the Indonesia-China Business Forum in Beijing on Sunday. This high-level forum followed a Saturday meeting between China’s President Xi Jinping and Indonesia’s President Prabowo Subianto. Reuters revealed that the leaders expressed their plans for strategic economic growth across sectors like food, clean tech, biotechnology, and pressing issues related to water conservation, maritime resources, and mining, particularly nickel.

Notably President Prabowo Subianto said,

“We must give an example that in this modern age, collaboration — not confrontation — is the way for peace and prosperity.”

The joint statement further explained their plans to expand cooperation across new energy vehicles, lithium batteries, photovoltaic projects, and the digital economy. They also committed to advancing the global energy transition, securing mineral resources, and stabilizing supply chains.

Indonesia Nickel

Indonesia’s Nickel Surge: Fresh Billion-Dollar Deals from China

Indonesia’s nickel industry was a significant topic of discussion during the meeting. The country, which leads global nickel production always has been a major investment hub for Chinese firms.

In this regard, the latest news is that Chinese battery materials producer GEM Co., Ltd striking a groundbreaking deal with Indonesia’s PT Vale to build a high-pressure acid leaching (HPAL) plant in Central Sulawesi. The agreement with a deal value of $1.42 billion, will ensure the nickel plant maintains nickel supplies which is crucial for battery-grade materials.

Moving on, Tsingshan Holding Group and Zhejiang Huayou Cobalt, the two major Chinese companies, continue to dominate Indonesia’s nickel industry. Their investments reflect faith in Indonesia as a prominent supplier of raw materials for EVs, lithium-ion batteries, and other green technologies.

Elaborating this further, Bloomberg reported that Zhejiang Huayou Cobalt Co. is pursuing $2.7 billion in financing for its battery-nickel plant in Indonesia. The financing deal, backed by Ford Motor Co., is being coordinated by HSBC Holdings Plc and Standard Chartered Plc, who are inviting additional banks to participate.

The Pomalaa plant, located in Southeast Sulawesi, will use high-pressure acid leaching (HPAL) technology to produce battery-grade nickel for electric vehicles. Notably, it will have a capacity of 120,000 tons of nickel annually, making it one of Indonesia’s largest HPAL projects. 

Both nations consider the timing of these deals a boon to the slump nickel market. Currently, nickel prices are weak due to low demand in the stainless-steel market and slow growth of the EV sector.

The Ever-Expanding Indonesian Nickel Industry

Indonesia has always attracted foreign investment to boost its domestic nickel production. The country sees this as essential for boosting and adding value to its vast natural resources. Despite these market pressures, Indonesia and China remain committed to their long-term goals, with Indonesia flagging its nickel industry as an integral part of its economic strategy.

As one of the top producers of metallic commodities—including gold, copper, cobalt, and especially nickel—Indonesia produced over half of the world’s mined nickel in 2023. Indonesia’s cost-effective nickel industry spurred major shifts in the nickel market. While nickel prices have dropped since last year, the country still maintained a resilient and steady production.

According to S&P Global Commodity Insights, Indonesia’s mined nickel production is expected to reach 2.1 million metric tons in 2024. This value is more than 50% of the anticipated global output and more than 2X its 2020 levels.

Indonesia Nickel

Source: S&P Global Commodity Insights

However, the rapid increase could eventually result in a global supply shortage, pushing prices back up to $28,000 per metric ton.

New Ventures in Tech, Travel, and Trade

China and Indonesia are not limiting their partnerships to the resources sector. Credible media agencies reported that GoTo Gojek Tokopedia, a prominent Indonesian technology company, signed agreements with China’s Tencent and Alibaba to bolster Indonesia’s digital infrastructure.

These partnerships can advance cloud services and foster local digital talent. It also signals a long-term investment in Indonesia’s digital economy and improving digital literacy and infrastructure at large.

Notably, President Subianto envisions transforming Indonesia’s tech landscape with investments in the most advanced sectors like AI and cloud computing.

Reuters reported, in addition to high-level industry deals, China and Indonesia agreed to streamline travel and visa policies, introducing measures like multi-entry long-term visas. This will enable more bilateral exchanges, business trips, and tourism.

Furthermore, the nations also agreed to deepen trade in agricultural products, including fresh coconuts. Interestingly, President Subianto also secured export agreements during his visit. This expansion of agricultural exports creates new opportunities for Indonesian farmers while fulfilling China’s demand for tropical produce.

Overall, it is evident that President Subianto’s decision to choose China as its first state visit shows the nation’s strong intention to deepen ties with Beijing.

Source: China, Indonesia seal $10 billion in deals focused on green energy and tech | Reuters

The post China and Indonesia Bolster Ties with $10B Deal in Strategic Sectors. How will it Impact Indonesia’s Nickel Industry? appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Carbon credit providers vs marketplaces: who does what

Published

on

Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.

Continue Reading

Carbon Footprint

Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”

Published

on

Democrats, Take The Deal. New York Times editorial, Nov. 12.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com