Solar energy started to emerge in Georgia in 2012. Coincidentally, that was around the same time that Southern Company began construction on Plant Vogtle nuclear units 3 and 4.
Plant Vogtle Unit 3 became operational earlier this year and Unit 4 is expected to be online by Q1 of 2024. However, when the Georgia Public Service Commission (PSC) certified these units for construction back in 2009, they were expected to be completed in 2016 and 2017. The fact that they are seven years past due and more than double the original budget has been well documented.
Over that same period while Vogtle 3 & 4 have been under construction, 4,500 MW of solar capacity (MW) has been developed in Georgia and at just 1/5 the cost of those two Vogtle units. By comparison, Vogtle 3 & 4 will eventually provide 2,200 MW of capacity for Georgia.
Before you retort “But the sun doesn’t shine all the time” — I am well aware. That, too, has been explored rather extensively. I’ll refer you to this enlightening podcast by Volts: What? The sun isn’t always shining?!
It is indeed constructive to consider the amount of energy generated (MWh) from solar in addition to the overall capacity (MW) constructed. Although nuclear units generally produce power for more hours in a day than solar projects do, that is only true after construction is finished.
Those solar units have been already generating for years, with even more solar planned to come online in the coming years. Meanwhile, Vogtle 3 just started generating this year (with Vogtle 4 further delayed until 2024). It got me wondering: how long will it take those new nuclear units (operating 24 hours per day) to produce as much electricity as solar units have already produced and are expected to produce into the future?
Spoiler Alert: Vogtle 3 & 4 won’t catch up!
If Vogtle 3 & 4 had been completed on-time, the situation could have been different. Nuclear output would have had the lead after 2016 and it would have taken until 2032 before the expected cumulative solar output eclipsed nuclear.
But because of the multi-year delays in starting up Vogtle 3 & 4, solar has built up such a lead that the new nuclear units may never catch up. And since the plans in Georgia forecast continued solar buildout with no new nuclear plants currently planned — even with continuous operation, the cumulative output from those new nukes will never exceed the cumulative output from solar.
This graph shows the output for Georgia Power’s share of Vogtle 3 & 4 (45.7% = 1 GW) compared to the generation from solar projects supplying the Georgia Power system (3 GW now, and continuing to grow).

The closest the Vogtle 3 & 4 output comes is in 2025 when those units are fully dispatched and new solar buildout (already approved) is continuing but not yet operational. By 2026, the annual output of solar is expected to exceed the annual output of Vogtle 3 & 4; so from that point onward, the cumulative margin of victory for solar will only increase.
As clean energy advocates, SACE anticipates even further and faster expansion of solar as we approach 2030 and beyond. This is precisely what climate science indicates is necessary.
The post Solar has been quietly running up the score during delayed Vogtle 3 & 4 construction appeared first on SACE | Southern Alliance for Clean Energy.
Solar has been quietly running up the score during delayed Vogtle 3 & 4 construction
Renewable Energy
Trump Targets Revolution Wind, Nordex Q3 EBITDA Doubles
Weather Guard Lightning Tech

Trump Targets Revolution Wind, Nordex Q3 EBITDA Doubles
Allen covers the Trump administration’s bid to reopen Revolution Wind’s permit, a bipartisan Senate permitting deal, Nordex’s doubled third-quarter profit, and GE Vernova’s new wind chief.
The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!
Renewable Energy
Dictators
Plato nailed this 2400 years ago, and it’s been on “rinse/repeat” ever since.
Renewable Energy
Making Billions by Harming Others
On average, I meet perhaps 50 K-12 teachers each year, and I often ask them: What is the biggest challenge you face that impacts your ability to connect with and educate your students?
Here’s a rough tabulation:
Screen time, how it robs kids of their ability to pay attention, impedes social interaction, and makes parenting more difficult: 80%
Everything else combined: 20%
Maybe this is a cynical viewpoint, but it seems like that world of today revolves around the mega-corporations profiting by punishing their customers.
In this case, we have the tech giants ruining the lives of our children. Elsewhere, we have healthcare industry driving people into bankruptcy, Big Oil ruining our planet, the gun lobby murdering our kids, and, of course, an ultra-corrupt government looting our treasury to pay off billionaire donors.
Note that this wasn’t the case when we boomers were growing up 60 years ago. This is a distinctive shift from the 1960s when corporate America was focused on things like color TVs and the Ford Mustang.
-
Climate Change1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases2 years ago嘉宾来稿:满足中国增长的用电需求 光伏加储能“比新建煤电更实惠”
-
Greenhouse Gases1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Climate Change2 years ago嘉宾来稿:满足中国增长的用电需求 光伏加储能“比新建煤电更实惠”
-
Renewable Energy12 months agoSending Progressive Philanthropist George Soros to Prison?
-
Climate Change2 years ago
Bill Discounting Climate Change in Florida’s Energy Policy Awaits DeSantis’ Approval
-
Greenhouse Gases1 year ago
嘉宾来稿:探究火山喷发如何影响气候预测
-
Climate Change2 years agoAnalysis: China’s CO2 falls 1% in Q2 2024 in first quarterly drop since Covid-19

Have you ever wondered why every dictator in human history follows the exact same playbook? Check this out