Connect with us

Published

on

Colombia’s Largest Carbon Project Secures $100M Backing from Temasek-Owned GenZero and Trafigura

GenZero, a decarbonization-focused investment platform owned by Temasek, and global commodities trader Trafigura have committed over $100 million to Brújula Verde, Colombia’s largest nature-based carbon removal project. Located in the Orinoco River Basin, this project aims to restore land degraded by agriculture and wildfires while generating high-integrity carbon removal credits.

Bringing Degraded Lands Back to Life

The planet is losing about 10 million hectares of forest worldwide every single year. The primary reason is to clear land for agriculture and materials like paper. This deforestation, largely concentrated in tropical forests (96%), contributes to 16% of total tree cover loss. 

Notably, deforestation releases nearly 5 billion tons of carbon dioxide annually, accounting for about 10% of global human-made emissions. This is why most nature-based projects are focusing on restoring degraded forests.

tropical primary forest loss 2002-2022
Source: World Resources Institute

In Colombia, 79,256 hectares were deforested in 2023. The South American nation is covered by over 60 million hectares of forests, with 405,000 hectares of planted forests.

The Brújula Verde project focuses on afforestation and reforestation across 30,000 hectares of degraded land, particularly areas previously used for cattle grazing. The initiative will plant 24 million mixed-species trees, with no plans for commercial harvesting. 

  • By restoring the land, the project could sequester over 20 million tonnes of carbon throughout its lifetime.

The project uses advanced technologies such as high-resolution sensors for accurate carbon monitoring and eDNA sampling to track biodiversity. It also assesses the health of local ecosystems, including their biodiversity, water systems, and social impacts.

Expanding the Project’s Scope

Trafigura initially invested in Brújula Verde in 2023, funding the first phase, which reforested 10,000 hectares. This latest investment, supported by GenZero, will double the project’s size and help it issue its first carbon credits by 2025.

Matthew Nelson, Head of Carbon Investments at Trafigura, highlighted the project’s potential to attract institutional investors and deliver environmental and social benefits. He stated that:

“GenZero’s partnership will enhance the scope and impact of Brújula Verde, bringing local employment alongside environmental and biodiversity benefits to the region, whilst producing high integrity nature-based carbon removal credits.”

Trafigura Sustainability and Climate Initiatives

Trafigura is a leading global commodity trading firm, specializing in the trading of oil, refined products, metals, and minerals. The company plays a vital role in connecting producers with consumers through efficient supply chains. In 2023, Trafigura reported revenues exceeding $315 billion, underscoring its significance in global markets.

The global commodity trading giant is actively pursuing ambitious carbon reduction initiatives, aiming to align with global net-zero targets. It targets a 50% reduction in Scope 1 and 2 emissions by 2032 and operational carbon neutrality by 2050.

Trafigura net zero pathway
Trafigura Net Zero Pathway. Source: Trafigura website

The company’s emissions reduction strategy also includes reducing its Scope 3 emissions intensity. These targets are complemented by investments in renewable energy projects, such as solar and wind. The company also invests in the development of low-carbon fuels, including green hydrogen and ammonia.

In 2023, Trafigura launched a $2 billion fund to support its energy transition projects. The company is also advancing its emissions trading activities, helping clients offset their carbon footprints by sourcing high-quality carbon credits. Trafigura’s climate action plan underscores its commitment to decarbonizing its supply chain and supporting global sustainability goals​.

The $100 million investment in Colombia’s Brújula Verde project for nature-based carbon removals​ is the company’s most recent initiative. 

Building High-Quality Carbon Markets

The project aims to contribute to the development of robust carbon markets by delivering high-quality, verifiable carbon removal credits. According to Hoon Ling Min, Director of Investments at GenZero, the project’s focus on soil restoration and native species reintegration ensures the production of top-tier carbon credits. He further noted that:

“The Brújula Verde project marks an important effort in restoring one of Colombia’s most biologically diverse areas. It is a unique project which adopts a restoration bridge concept by reconditioning soil health through reforestation, which enables the reintegration of native species gradually.”

GenZero, a wholly-owned subsidiary of Temasek, is committed to accelerating global decarbonization. The platform invests across three key areas:

  • technology-based solutions,
  • nature-based projects, and
  • carbon ecosystem enablers.

GenZero has already deployed capital in impactful initiatives, including investments in Carbon Capture, Utilization, and Storage (CCUS) and nature-based solutions like sustainable forestry.

The company’s key achievements include reducing carbon emissions through clean cookstove projects in Southeast Asia and supporting the New Forests Tropical Asia Forest Fund 2. Together, these efforts contribute to advancing decarbonization by 2030, aligning with global net-zero goals. 

The Brújula Verde project represents a significant step toward addressing climate change by restoring ecosystems and generating carbon credits. With GenZero and Trafigura’s combined investment, the project will deliver environmental, social, and economic benefits to the Orinoco River Basin while advancing the global carbon market.

The post Colombia’s Largest Carbon Project Secures $100M Backing from Temasek-Owned GenZero and Trafigura appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Carbon credit providers vs marketplaces: who does what

Published

on

Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.

Continue Reading

Carbon Footprint

Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”

Published

on

Democrats, Take The Deal. New York Times editorial, Nov. 12.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Trending