Connect with us

Published

on

Uranium Saskatchewan

UK-based Fulcrum Metals has acquired 100% interest in the Charlot-Neely Lake, South Pendleton, and Snowbird uranium projects in Saskatchewan, Canada, through its subsidiary, Fulcrum Metals (Canada) Ltd. Terra Balcanica Resources Corp a polymetallic exploration company, has signed a “definitive option agreement”, that allows a four-year option to acquire a 100% interest in Fulcrum’s uranium exploration licenses in northern Saskatchewan, Canada. These licenses cover 596.71 km² of promising uranium exploration ground. With uranium prices rising quickly, this deal is sure to make an impact.

Fulcrum Advances Acquisition and Sale of Major Uranium Projects

The company’s press release reveals that Fulcrum paid CA$ 5,000 upon receiving the option and an additional CA$ 60,000 when exercising it on June 28, 2024. These projects now belong to Fulcrum Metals (Canada) Ltd. This acquisition, covering 11,481 hectares, follows an agreement with Gary Clayton Dunn and Jonathan Stewart Dunn, the owners of The Dunn Option Uranium Projects of Saskatchewan.

This acquisition brings Fulcrum closer to finalizing the sale of its 59,000 hectares of uranium projects to Terra Balcanica Resources Corp. The projects include Charlot-Neely Lake, Fontaine Lake, Snowbird, and South Pendleton, all situated along the northern and southeastern edges of the Athabasca Basin. This Basin is a major source of about 20% of the world’s uranium and hosts significant deposits.

Terra has already paid Fulcrum C$25,000 in cash to secure the option. The company anticipates completing the agreement soon and will provide updates as developments occur.

Terra Balcanica CEO, Dr. Aleksandar Mišković has given a long statement on this. He said,

“The agreement signed with Fulcrum marks an exciting new chapter in Terra’s corporate history as a high-quality target generator and explorer of critically needed commodities. The Company is now exposed to a world-class uranium district that is experiencing a mining renaissance as evidenced by the recent discovery made just 20 km from of our flagship Charlot-Neely license. With close to 600 km2 of land tenure, we are supremely positioned to take early-mover advantage of opportunities along the entire northern and eastern margins of the Athabasca Basin. The optioned portfolio comprises geologically promising ground that has not seen modern surveying nor recent drilling. We are excited to approach it by applying the same level of technical rigor as we did in the Balkans to define drill targets with a high probability of success.

Dr. Aleksandar further added that the licenses also feature gold, copper, nickel, and cobalt showings, anticipating an eventful autumn of prospecting, sampling, and structural mapping. Additionally, he plans to conduct airborne geophysics to rapidly define drill targets.


A MESSAGE FROM URANIUM ROYALY CORP.
[Disseminated on behalf of Uranium Royalty Corp.]

NASDAQ’s Sole Uranium Focused Royalty Company

Uranium Royalty Corp.

The company is Uranium Royalty Corp., trading as (NASDAQ: UROY, TSX: URC), holding a strong portfolio includes strategic acquisitions in uranium interests with royalties, streams, equity in uranium companies, and physical uranium trading. Their strategic approach aims to support cleaner, carbon-free nuclear energy while fostering long-term relationships based on sustainability principles.

Learn about the company’s portfolio of royalty assets and uranium holdings >>


Athabasca Basin: The Hot Spot of the Uranium Project

Terra’s press release has emphasized this uranium project’s notable attributes and the sites’ substantial mining potential.

The optioned terrain lies near the northern and southeastern edges of the Athabasca Basin in northern Saskatchewan, a renowned mining area and top global source of high-grade uranium. It includes four license clusters targeting promising NE-SW structures and electromagnetic conductors.

Furthermore, these corridors are identified as likely zones for basement- and intrusive-hosted uranium mineralizations. The southeastern margins of the Athabasca Basin have world-class uranium deposits, such as NexGen Energy’s Arrow (4.3 Mt at 0.83% U3O8) and Fission Uranium’s Triple R (2.7 Mt at 1.94% U3O8).

Charlot-Neely Lake has significant REE potential. It lies within the emerging Uranium City district on the Basin’s northwestern margin. Past work shows evidence of uranium mineralization along favorable structural trends with promising target horizons identified by electromagnetic conductors.

The samples showed over 31% U3O8 and 16% REE. The company will target high-grade uranium sources along the most radioactive segments of the graphitic conductors, focusing on previously untested drill targets.

Similarly, Fontaine Lake and Snowbird showed 1% uranium in a minimal 2008 field program. Future exploration will involve modern systematic geological fieldwork to assess the uranium potential.

Additionally, South Pendleton shares the same basement lithologies as the prolific Key Lake and Rabbit Lake mines. Despite several surface radioactive anomalies and occurrences of uranium mineralization, this area remains unexplored.

Athabasca Basin Uraniumsource: Terra Balcanica

Fulcrum Metals: Strategic Ventures in Canada’s Uranium-Rich Terrain

Fulcrum Metals, a multi-commodity explorer has built an impressive portfolio of gold, base metal, and uranium projects. Mostly they are strategically located near rich deposits and active mines with established infrastructure. And Canada is the key hub!

Some significant exploration projects include the Schreiber-Hemlo Project in Ontario, which consists of the Big Bear and Jackfish Lake gold assets, covering 113 km². This area is not fully explored yet. Thus, presenting Fulcrum’s complete exploration opportunity. Furthermore, through joint ventures or acquisitions, it plans to develop several early-stage projects in Ontario’s greenstone belts, including Winston Lake, Dog Lake, and Tocheri Lake.

However, the Saskatchewan project is the most promising one. This is because Saskatchewan is a top source of high-grade uranium. It’s getting exposure to the growing global investment in nuclear energy for decarbonizing power. Thus, we can conclude that the Fulcrum Metals and Terra Balcanica deal would give a new dimension to uranium mining in Canada.

The post Fulcrum Metals and Terra Balcanica Forge Deal to Explore Uranium in Canada appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

The Strategic Case for Nature-Based Carbon Investments

Published

on

Nature-based carbon investments deserve consideration when they address a specific business dependency and produce outcomes you can measure. Imagine Moonbucks, a global coffee roaster planning next season’s espresso blend. It is considering natural Grade 4 coffee from Jimma, in southwestern Oromia, Ethiopia. Its sourcing decisions affect the roasting schedule and the cash tied up in coffee purchases. Moonbucks needs to understand which measures could protect that supply, what they would cost and how it would judge the results.

1. Define the sourcing problem before choosing a project

Moonbucks needs a dependable component for its espresso blend. Its procurement team wants continuity of volume and an agreed cup profile. Replacing a shipment at short notice could require new sample approval and changes to the blend, and given the schedules for cultivation, processing, and freight delivery, is practically impossible. Moonbucks needs to get this right, and its initial concern is inconsistent deliveries. It commissions an assessment of the supplying farms and post-harvest chain. The questions cover land condition, harvest availability and whether drying or storage problems are affecting saleable lots.

This distinction changes the investment brief. A tree-planting proposal cannot be assumed to fix drying problems. Better storage cannot restore eroded land. The team must establish which problem exists before selecting the response.

CCC’s guide to finding nature-based solutions in your supply chain explains where to look. Here, the next task is to turn a broad concern into a testable proposal.

2. Develop nature-based carbon investments around the actual supply chain

The assessment would trace Moonbucks’ purchases back through the exporter and supplying producer groups. Which farms supply the contracted lots? Who controls land-management decisions? How long does the buyer expect to maintain the purchasing relationship?

Furthermore, Jimma natural Grade 4 cannot be treated as interchangeable with every Ethiopian coffee. Moonbucks would need to test any substitute against its own blend and quality requirements.

Suppose Moonbucks’ assessment identifies an opportunity to maintain shade trees and restore vegetation along exposed streambanks. The IPCC describes agroforestry as a way to store carbon in vegetation and soil, with potential benefits for erosion control and water quality.1 Moonbucks would need local advice on species, growing conditions and maintenance before deciding how these measures fit its sourcing plan.

The proposal now has a defined sourcing connection and a candidate intervention. The next steps are to test its effect on production, assess carbon eligibility and build the financial case.

3. Compare the proposal with other ways to protect supply

WBCSD’s Nature-based Solutions Blueprint recommends comparing nature-based options with other responses across their benefits and costs.2 For Moonbucks, that means evaluating the landscape proposal alongside drying improvements, storage controls and alternative sourcing arrangements.

The product’s natural-process designation matters. Moonbucks should examine the drying and dry-milling chain alongside land conditions. Its team would check storage practices, contamination risks and incoming-lot quality to see whether problems arise before or after the coffee leaves the farms.

The revised proposal might combine land stewardship with separate post-harvest controls. Each component needs its own purpose and budget. A sustainability label should not obscure which activity is expected to solve which problem.

The project develops as the evidence improves. Its scope should follow the diagnosis rather than preserve the first idea unchanged.

4. Establish what the carbon outcome could count toward

Moonbucks’ sustainability team now tests the proposed carbon case separately from the sourcing case. Is the objective a measurable change in Moonbucks’ value-chain emissions, verified credits for separate voluntary use, or distinct outcomes under carefully defined arrangements?

Scope 3 covers value-chain emissions. A purchasing relationship alone does not prove that a farm intervention can be included in Moonbucks’ inventory. The team needs an applicable accounting method, defensible boundaries and evidence supporting attribution.

SBTi’s FLAG Guidance (forest, land and agriculture), version 1.2, says purchased credits used as offsets cannot meet near-term FLAG or energy and industry targets. Eligible land-based removals are subject to accounting requirements.3 Moonbucks needs to test its proposal against those rules before including an outcome in its targets.

For Moonbucks’ Jimma proposal, maintaining existing trees and establishing new vegetation could involve different carbon questions. Specialists must examine the baseline and additionality, meaning what changes because the project proceeds. They must also assess measurement and the risk that stored carbon is lost. CCC’s MRV and additionality article introduces those tests.

Until that work is complete, Moonbucks should not budget an assumed Scope 3 reduction or credit-sale receipt. Direct emissions reductions remain the priority.

5. Build a financial case that survives weaker assumptions

Moonbucks’ finance team would now build a multi-year budget. UNEP’s State of Finance for Nature 2023 compares current finance with the investment needed to meet climate, biodiversity and land-restoration goals.4 The company would cost its proposed activities, farmer participation and ongoing monitoring. Verification, where required, is a separate expense. Maintenance and responsibility for replacing failed plantings must remain visible after the initial establishment budget ends.

Operational benefits need equally careful treatment. If fewer rejected lots reduce emergency purchasing, count that saving once. Do not add “supply resilience” as another financial benefit when it represents the same avoided cost.

Moonbucks should compare a base case with slower benefits, higher implementation costs and no carbon revenue. It should also distinguish production outcomes from quality and shipment outcomes. A single good harvest would not prove that the landscape intervention caused better delivery performance.

A project can remain worth funding even when its carbon case needs more work. That decision must rest on the operational evidence and the company’s objectives, without unsupported environmental claims.

6. Fund a pilot with a clear expansion decision

Moonbucks’ first approval would fund a bounded pilot, rather than commit the entire sourcing program. Before spending, Moonbucks would agree on participating farms, responsibilities and the evidence needed at review.

Its scorecard could track farmer participation, implementation costs and plant survival, alongside accepted coffee volumes and lot-quality results. Carbon measurements would follow the selected method. Farm-level traceability must connect the intervention to the actual sourcing relationship.

Suppose Moonbucks’ review later finds that storage changes explain most quality improvements, while the land measures need longer observation. Those findings would shape the next decision: expand the proven component, adjust the landscape work or pause further spending. They would not justify crediting all improvements to tree planting.

This gives nature-based carbon investments a practical place in a multi-year strategy. Funding increases as the evidence supports it, and the project can change direction before a larger commitment.

Discuss a sourcing opportunity with CCC

Carbon Credit Capital’s nature-based supply-chain investment service uses its Dual-Value Model to examine supply-chain economics alongside potential sustainability outcomes.

Schedule a consultation to discuss your sourcing exposure and the questions to resolve before allocating capital.

Sources

  1. Intergovernmental Panel on Climate Change (IPCC), Climate Change 2022: Mitigation of Climate Change, Chapter 7, Agriculture, Forestry and Other Land Uses, section 7.4.3.3 (Agroforestry).
  2. World Business Council for Sustainable Development (WBCSD), Nature-based Solutions Blueprint, 5 June 2024.
  3. Science Based Targets initiative (SBTi), Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, section 3.1.4, pp. 37–38.
  4. United Nations Environment Programme (UNEP), State of Finance for Nature 2023, 2023.
Continue Reading

Carbon Footprint

How to buy plastic credits, and what to check before you do

Published

on

A plastic credit funds the collection of plastic waste in places where no formal system exists to collect it. Each credit represents a measured, independently audited quantity of plastic taken out of the environment or returned to use, tracked on a public registry.

Continue Reading

Carbon Footprint

EU carbon credit claims after 27 September 2026

Published

on

EU carbon credit claims changed on 27 September 2026, the day the Directive (EU) 2024/825 began to apply across the European Union. The change is narrow. It changes how a company can talk about the credits it buys. A product can no longer be called neutral on the strength of compensation alone; however, every specific, evidenced statement about what a company measured, reduced, and funded stays fully available.

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com