Connect with us

Published

on

Westinghouse is Pioneering Nuclear Microreactor for Remote Energy Needs

Westinghouse Electric Company has successfully finished the front-end engineering and experiment design (FEEED) phase for its eVinci microreactor prototype. This phase is part of preparations for testing at the Idaho National Laboratory (INL), scheduled as early as 2026. The eVinci microreactor is one of three innovative designs selected for evaluation at the world’s first nuclear microreactor test bed.

The FEEED phase is critical for developers like Westinghouse to plan and design the fabrication, construction, and potential testing of the reactor at the DOME test bed. The test bed is operated by the National Reactor Innovation Center (NRIC), a U.S. Department of Energy initiative. 


A MESSAGE FROM URANIUM ROYALY CORP.

The First and Only Pure Play Uranium Royalty CompanyUranium Royalty Corp

Uranium Royalty Corp  is the first company to apply the successful royalty and streaming business model exclusively to the uranium sector.

With interests in advanced, permitted and producing uranium projects, the company is well positioned as a capital provider to meet the growing need for uranium as fuel for carbon free, nuclear energy.

Discover first mover pure-play uranium royalty exposure >>

[ Disseminated on behalf of Uranium Royalty Corp.] NASDAQ: UROY | TSX: URC 


What Are Nuclear Microreactors?

Nuclear is getting smaller and smaller. Nuclear microreactors are a prime example. 

Several microreactor designs are being developed in the U.S. These small reactors are portable, fitting on a truck, and could address energy needs in remote locations, both commercial and residential, as well as military bases.

Microreactors are distinguished by 3 main features rather than their fuel or coolant, according to U.S. DOE’s Office of Nuclear Energy:

  1. Factory Fabrication: All components are pre-assembled in a factory and shipped to the site, reducing construction challenges and capital costs, and allowing quick deployment.
  2. Transportability: Their small size allows easy transportation via truck, ship, airplane, or train, making deployment versatile.
  3. Self-Adjustment: They are designed to automatically adjust operations with minimal operator involvement, using passive safety systems to prevent overheating or meltdowns.
what is a nuclear microreactor
Graphic from the US DOE’s Office of Nuclear Energy

Westinghouse’s completion of its prototype microreactor’s FEEED process moves the project a step closer to the testing and commercialization phase. The process involves creating a detailed schedule, budget, and design for the experiment, along with a preliminary safety report to ensure safe testing. This phase helps developers prepare for the eventual fabrication and installation of the reactor. 

Westinghouse, along with Radiant and Ultra Safe Nuclear Corporation, was competitively selected to complete the FEEED process last year. Jon Ball, President of eVinci Technologies at Westinghouse, emphasized the significance of completing this phase:

“This marks a critical step in bringing the Westinghouse eVinci Microreactor to commercial operation. We are targeting deployment of multiple eVinci microreactors worldwide by the end of the decade. The strong partnership with NRIC, INL, and the Department of Energy is instrumental to our efforts.”

What is the eVinci Microreactor?

The eVinci microreactor is one of several designs funded by the U.S. Department of Energy’s Advanced Reactor Demonstration Program. This heat-pipe cooled reactor can generate 5 megawatts of electricity and is designed for sites as small as two acres. It can operate for 8+ years before needing to be refueled.

Unlike conventional reactors, the eVinci uses heat pipes to transfer heat out of its core, allowing for air cooling instead of water or pressurized gas. This makes it more efficient and suitable for various environments, especially remote areas where water is not easily accessible.

The microreactor has a wide range of applications, including:

  • Powering remote communities
  • Supporting mining operations
  • Supplying energy to data centers

In 2023, Westinghouse announced an agreement to deploy an eVinci microreactor in Saskatchewan, Canada, showcasing its potential in cold, remote areas.

The Role of NRIC and the DOME Test Bed

Westinghouse will continue to work with NRIC to finalize the design and planning for the eVinci experiment. The company is also preparing for long-lead procurement items in anticipation of potential installation at the DOME test bed.

The NRIC, a program under the U.S. Department of Energy’s Office of Nuclear Energy, is dedicated to advancing the development of next-generation nuclear reactors. By bringing together industry and national labs, NRIC aims to help new reactor technologies move from the concept stage to demonstration and, eventually, commercialization.

The DOME test bed is a critical facility in this process. It provides a controlled environment where reactor developers can test fueled experiments with reduced risks. This collaboration between industry players like Westinghouse and national laboratories like INL accelerates the safe development of advanced reactor designs.

Radiant and Ultra Safe Nuclear Corporation are also expected to finish their FEEED processes by the end of the year. These companies are gearing up to test their own microreactor designs at DOME.

A Significant Step for Microreactor Innovation

Completing the FEEED phase is a major milestone in bringing microreactor technology closer to reality. Westinghouse is positioning itself as a leader in the next wave of nuclear technology. 

The development of nuclear microreactors like the eVinci could have far-reaching impacts, providing a new, sustainable energy source for various industries and remote communities. It is a perfect example of how nuclear innovation is evolving to meet the energy demands of the 21st century. 

With testing expected at the DOME test bed by 2026, and the continued support of the Department of Energy, these projects represent significant progress toward clean, reliable, and versatile nuclear power. As the world transitions to low-carbon energy sources, microreactors could play a critical role in the future of global energy.

The post Westinghouse is Pioneering Nuclear Microreactor for Remote Energy Needs appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Carbon credit providers vs marketplaces: who does what

Published

on

Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.

Continue Reading

Carbon Footprint

Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”

Published

on

Democrats, Take The Deal. New York Times editorial, Nov. 12.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com