Engie, the world’s largest independent power producer, has made a significant commitment to sustainability by pre-ordering 5 million tons of nature-based carbon removals from Catona Climate, a climate finance company.
This move is part of Engie’s strategy to meet its Net Zero target by 2045. It also represents a major investment in nature-based solutions, which are becoming crucial for climate change mitigation.
A Major Deal for High-Quality Climate Solutions
The recent reports from the Intergovernmental Panel on Climate Change (IPCC) have highlighted the necessity of scaling up carbon removal methods to achieve climate goals. The latest IPCC report emphasizes nature-based solutions, which can remove at least 3 gigatons of CO2 annually by 2030.
Traditionally, efforts focused on technological solutions for carbon capture. However, nature-based solutions are also gaining traction due to their additional environmental benefits, as evidenced in recent Xpansiv report.
Engie’s partnership with Catona Climate reflects a broader industry trend toward integrating ecosystem restoration projects into corporate carbon strategies. This shift highlights the growing recognition of carbon removal alongside direct emission reductions in achieving net zero emissions.
Engie’s pre-order aligns with these findings and marks a significant step up from its previous smaller-scale carbon offset projects. However, scaling these projects faces several challenges, including complexities related to impacts on local communities and balancing carbon sequestration with other environmental benefits.
This is where Catona Climate’s solutions come in.
Based in California, Catona Climate funds high-impact, nature-based projects through carbon removal purchases. These projects are aligned with science-based targets and focus on regenerative land management, reforestation, and combating deforestation.
The climate finance company sources, invests, and monitors these projects, offering businesses a portfolio of high-quality climate solutions. By creating clear demand signals, Catona aims to de-risk carbon investments and accelerate the development of high-quality climate solutions.
A Growing Trend of Nature-Based Carbon Removal
The agreement enables Engie to secure carbon removal credits from multiple projects at fixed prices, offering financial stability and predictability. Under the partnership, the carbon removal credits will be issued between 2030 and 2039, with Engie having the flexibility to source from multiple projects at locked-in pricing.
Jérôme Malka, a member of Engie’s Executive Committee, emphasized the shared commitment to quality and impact between Engie and Catona. He further highlighted the benefits of this deal, saying that:
“Collaborating with Catona to address residual emissions was a natural fit given our alignment on quality and impact, and our shared commitment to supporting projects that not only remove carbon, but also provide meaningful benefits to local ecosystems and communities.”
Tate Mill, CEO of Catona Climate, stressed the importance of the partnership with Engie to drive capital and expand nature-based projects.
“Those signals help us de-risk carbon investments and drive more capital through our trusted network of project developers to accelerate the development of nature-based carbon removal solutions so critical to turning the tide on climate change.”
Engie’s collaboration with Catona is a key component of its strategy to decarbonize clients’ operations and achieve net zero. Here are the other major operational levers of action the company is undertaking.

What’s Inside Engie’s Ambitious Net Zero Goal?
Engie is committed to a bold decarbonization strategy, aiming to achieve net zero across its three scopes. In 2023, the Group’s carbon emissions totaled 158 million tonnes of CO2 equivalent, a significant reduction of 39% from 2017’s 260 million tonnes.

The French power company’s roadmap sets a goal to cut all emissions by at least 90% between 2017 and 2045, with the remaining 10% to be neutralized. The company’s 2030 decarbonization trajectory, certified as “well below 2°C” by the Science-Based Targets initiative (SBTi), involves four main goals to reduce emissions. These include:
- 59% reduction in energy production emissions (scopes 1 and 3),
- 34% decrease in emissions from gas sales (scope 3),
- 66% reduction in carbon intensity from energy production (scope 1) and consumption (scope 2), and
- 56% cut in the carbon intensity of energy sales (scopes 1 and 3).

To achieve these targets, the power company is adopting several key strategies:
- Phase Out Coal: The Group plans to completely eliminate coal by 2025 in Europe and by 2027 globally.
- Expand Renewable Energy: ENGIE aims for renewables (solar, onshore, and offshore wind) to comprise 58% of its electricity generation mix by 2030, boosting production capacity by 50 GW by 2025, reaching 80 GW by 2030. Additionally, 10 GW of battery storage capacity will be installed, mainly in Europe and the US, to enhance the flexibility of the energy mix.
- Increase Green Gases: The biomethane production capacity is targeted to reach 10 TWh/year in Europe by 2030, with an injection capacity of 50 TWh/year across ENGIE’s networks. Green hydrogen is also a crucial component, with a goal of producing 4 GW by electrolysis by 2030, supported by a 700km transport network and 1 TWh storage capacity.
Notably, the Group aims to manage 30 TWh/year of decarbonized hydrogen and establish over 100 hydrogen refueling stations.
Finally, Engie commits to a program to reduce carbon emissions, targeting 45 million tons of CO2 eq. avoided each year. Part of this goal is investing in 5 million tons of carbon credits, which what the company just did.
Engie’s pre-order from Catona represents a step towards achieving its net zero goal by 2045. This collaboration aims not only to reduce carbon emissions but also to support local ecosystems and communities, ensuring the long-term viability of nature-based carbon removal solutions.
The post Engie Buys 5 Million Tons of Nature-Based Carbon Credits for Net Zero appeared first on Carbon Credits.
Carbon Footprint
Carbon credit providers vs marketplaces: who does what
Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.
![]()
Carbon Footprint
Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”
Democrats, Take The Deal. New York Times editorial, Nov. 12.
Carbon Footprint
Designing an Insetting Program: A Step-by-Step Playbook for Procurement
Insetting program design starts with your supplier map. The carbon claim comes much later.
Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.
If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.
Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.
Step 1: Insetting program design starts with supplier mapping
Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.
The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]
Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.
If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]
Step 2: Choose a commodity and jurisdiction for a pilot
Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.
Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.
Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.
Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.
Step 3: Design the supplier engagement and commercial model
The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.
Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]
Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]
Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.
Step 4: Build monitoring, reporting, and verification before rollout
Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.
For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.
CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.
Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]
Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.
Step 5: Decide what can be reported and claimed
Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.
SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”
Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.
What good looks like by year three
Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.
Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.
Discuss your insetting program with CCC
Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.
Sources
[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance
[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf
[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/
[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard
-
Climate Change1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Renewable Energy1 year agoSending Progressive Philanthropist George Soros to Prison?
-
Greenhouse Gases1 year ago
嘉宾来稿:探究火山喷发如何影响气候预测
-
Climate Change2 years agoAnalysis: China’s CO2 falls 1% in Q2 2024 in first quarterly drop since Covid-19
-
Climate Change1 year ago嘉宾来稿:探究火山喷发如何影响气候预测
-
Renewable Energy5 months agoSend a Bible to a Starving Child
-
Green Living2 years agoOur Picks for the Top 2024 Black Friday and Cyber Week Sales From Sustainable Brands

