Connect with us

Published

on

solarbank bess

SolarBank Corporation, a pioneer in clean and renewable energy in Canada and the U.S., is entering the battery energy storage market by securing $3 million in project financing. The loan, provided by RE Royalties Ltd., marks a significant milestone in SolarBank’s growth strategy, which includes battery energy storage system (BESS) projects.

A Milestone for SolarBank’s Battery Energy Storage Goals

The company aims to capitalize on the market forecast by Fortune Business Insights that predicts project growth at a 16.3% annual rate and reaching $31.2 billion by 2029.

SolarBank is developing three 4.99 MW Battery Energy Storage System (BESS) projects in Ontario. These projects are owned by 1000234763 Ontario Inc. and 1000234813 Ontario Inc. (“ProjectCos”). The loan agreement is under Solar High Yield Projects #1 Ltd. (“the Borrower”).

The company got involved in the projects through its $45 million acquisition of Solar Flow-Through Funds Ltd., which was completed in July 2024. This acquisition expanded the company’s renewable energy assets and opportunities in energy storage. Subsequently, the newly secured financing will help SolarBank leverage this acquisition and refresh its storage project plans. This is also one way to diversify its portfolio for renewable energy solutions.

Matthew Wayrynen, Chair of SolarBank commented,

“We are thrilled to continue our partnership with RE Royalties to secure this financing for our BESS projects in Ontario. Having worked with RE Royalties on previous projects, we value their expertise and shared commitment to sustainability. This financing is a key step toward a cleaner future and the further diversification of SolarBank’s growing project portfolio.”

                           Mergers & Acquisitions Opportunistic ExpansionSolarBank solar energy Source: SolarBank

Unlocking the BES Project Loan Agreement

RE Royalties Ltd. will issue the entire $3 million loan to SolarBank’s in a single installment and the company has to repay by November 26, 2025. The loan carries an annual interest rate of 11%. To secure the financing, SolarBank agreed to a 0.40% royalty on the gross revenue from the projects. Notably, if they can repay the within six months, the royalty will drop to 0.25%.

Bernard Tan, CEO of RE Royalties, stated

 “We are excited to be working with the SolarBank management team again on this transaction. The SolarBank team has a long proven track record in developing, building and operating renewable energy assets in North America. These BESS projects will help the province of Ontario support renewable electricity generation, build resiliency in the grid, and help lower emissions compared to conventional sources.”

The press release further revealed some critical details of the loan, illustrated below:

  1. The loan is backed by a first-ranking security interest on all assets of the borrower, excluding shares in the ProjectCos.
  2. The borrower, a fully-owned subsidiary of SolarBank, holds a 50% indirect interest in the ProjectCos. The remaining 50% is owned by a partnership with First Nations communities in Ontario.

This financing will cover development and construction costs for the projects. Additionally, SolarBank is also working on securing a larger financing package to fully fund the construction of their projects.

                                              SolarBank’s AchievementsSolarBank PortfolioSource: SolarBank

Factors Driving Market Growth

Although Asia Pacific is the key player in the BESS market, U.S., the market is also booming. One main reason is the adoption of renewable energy sources like solar and wind. Fortune Business Insights says:

  • The global market size was USD 18.20 billion in 2023 and is projected to reach USD 114.05 billion by 2032. Essentially, the U.S. battery energy storage market is projected to reach $31.36 billion in the same forecast period.

battery energy storage system US

Efforts to improve grid stability and resilience through clean energy solutions will further fuel demand for battery energy storage systems (BESS). This includes merging lower carbon emissions options like BESS with renewable energy sources like solar and wind. Together they can become the prime alternatives to fossil fuels.

Additionally, a surge in investments and supportive government policies is driving significant growth in the industry. These factors are creating a strong foundation for the expansion of battery energy storage systems worldwide.

Another reason behind renewable energy companies turning to battery energy storage is the cost advantages. In today’s energy transition, solar and wind are abundant and often more affordable than coal and other fossil fuels. Additionally, the cost of solar and battery energy storage has dropped by 85% over the past decade, making these solutions even more feasible and demanding.

SolarBank noted,

  • The North American solar PV market was valued at US $25.02 billion in 2019 and is projected to reach US $120.74 billion by 2027; it is expected to grow at a CAGR of 21.7% from 2020 to 2027.

Assessing Potential Project Risks

While the BES project presents growth opportunities, it also has certain risks. Development depends on securing necessary permits and maintaining access to third-party financing. Construction risks and potential delays could also impact progress.

Additionally, changes in government policies and reductions in incentives for battery energy storage could make such projects less viable in the future. Despite these challenges, SolarBank is determined to advance its renewable energy goals.

SolarBank Corporation: Powering the Future with Solar Energy

SolarBank Corporation is a full-service solar energy developer driving innovation and sustainability across North America. With over 250 MW of development opportunities in New York and Maryland since 2017, the company is a leader in commercial, industrial, and community solar solutions in the U.S.

In Canada, the company made huge progress by participating in the Ontario Independent Electricity System Operator (IESO) Feed-in-Tariff (FIT) program under the Green Energy Act. Most importantly, their success came from small FIT solar projects, including rooftop and ground-mounted installations.

                                     Strong Visibility to Continued GrowthSolarBank solar energy Battery energy storageSource: SolarBank

Expanding Renewable Horizons

SolarBank is now part of IESO’s first Long-Term Request for Proposals (E-LT1 RFP and LT1 RFP). This initiative targets 4,000 MW of new, year-round dispatchable electricity capacity from cutting-edge technologies like BESS.

The company has already entered the electric vehicle (EV) charging market as a service provider to business and residential customers. Thus, with years of expertise, they have become a trusted partner for ESG-focused businesses, driving advancements in energy storage, EV charging, and solar solutions to support their Net-Zero goals.

                                     A Decade of Strong Revenue GrowthSolarBank solar energy battery energy storageSource: SolarBank

In conclusion, the financial backup and a clear growth trajectory SolarBank can make a remarkable impact on the battery energy storage sector.

The post SolarBank Charges Ahead with $3M Boost for Battery Energy Storage System Projects appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Carbon credit providers vs marketplaces: who does what

Published

on

Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.

Continue Reading

Carbon Footprint

Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”

Published

on

Democrats, Take The Deal. New York Times editorial, Nov. 12.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Trending