The expansion of data centers, driven by the rise of artificial intelligence (AI), cloud computing, and data storage, is one of the largest contributors to increased electricity demand. To address this issue, Google has teamed up with Intersect Power, a clean energy developer, and TPG Rise Climate, a private equity firm, to launch a $20 billion partnership that promises to transform the way data centers are powered.
This collaboration aims to co-locate renewable energy sources with Google’s data centers, ensuring that new facilities are powered by clean energy. The deal, which involves the development of massive energy parks, will integrate renewable energy generation—such as solar power—with energy storage solutions in industrial parks that house data centers.
The first phase of the project is expected to be operational by 2026, with full completion anticipated in 2027.
What Are Energy Parks and Why Are They Important?
The core idea behind Google and Intersect Power’s collaboration is the development of energy parks. They are large-scale, co-located renewable energy facilities designed to serve the dual purpose of powering data centers and contributing to the broader power grid.
These energy parks will combine solar power generation with storage solutions, enabling Google’s data centers to operate on clean energy. More importantly, the energy parks can also feed excess electricity into the grid, helping to stabilize the energy supply and provide power for other needs.

Energy parks offer several significant benefits over traditional energy-sourcing models:
- They reduce the reliance on external, non-renewable energy grids, which are often fueled by fossil fuels and can contribute to environmental degradation.
- They provide financial benefits, such as cost savings from bulk energy purchases, leveraging tax credits, and creating local economic development opportunities.
- They will also help speed up the integration of renewable energy into the energy market.
As these facilities are developed to serve large, energy-intensive loads like data centers, they can quickly connect to the grid. As such, they provide a faster alternative to waiting for new grid-connected resources to come online.
Google’s Commitment to Sustainability and Clean Energy
The tech giant’s partnership with Intersect Power aligns with Google’s longstanding commitment to sustainability. Over the years, the tech company has made significant progress in reducing its carbon footprint and increasing the use of renewable energy in its operations.
However, as the demand for data and computing power increases—especially with the proliferation of AI and machine learning—Google has found it increasingly difficult to keep pace with its energy needs using traditional renewable energy sources alone.
In 2023, Google reported a 13% increase in emissions, due to the growing energy consumption of its expanding data centers. This prompted the company to seek innovative solutions, such as the creation of energy parks, which integrate renewable energy production directly into the data center ecosystem.

The $20 billion partnership with Intersect Power is an ambitious effort to meet Google’s energy needs as well as help reduce the environmental impact of the tech industry’s rapid growth.
The Role of TPG Rise Climate and Intersect Power in Scaling the Effort
TPG Rise Climate, part of the private equity firm TPG, plays a key role in this collaboration by providing funding to help scale the renewable energy infrastructure. It led the $800 million funding round for Intersect Power.
With its focus on climate solutions, TPG Rise Climate is committed to driving investments that reduce carbon emissions and support the global transition to clean energy.
Intersect Power also brings valuable experience to the table, having developed and managed renewable energy assets across North America. The company has over 2.2 gigawatts (GW) of solar energy and 2.4 gigawatt-hours (GWh) of battery storage already in operation or under construction. With this, the company has demonstrated its ability to deliver large-scale energy solutions.
The partnership with Google is set to further expand its renewable energy footprint, as it looks to break ground on 4 GW of solar and 10 GWh of battery storage in the near future.
Meeting the Soaring Energy Demands of Data Centers: Challenges and Solutions
The rapidly growing demand for data centers is not unique to Google’s operations. In Virginia, for example, the state faces a daunting challenge in meeting the energy needs of its data center industry.
According to a recent study by the Joint Legislative Audit and Review Commission (JLARC), the state’s energy demand, which had remained relatively flat for years, is projected to double over the next decade. This is driven primarily by the expansion of data centers.
Virginia’s largest data center market, located in Northern Virginia, is home to about 13% of global data center capacity. This creates a massive strain on the state’s power grid.
The JLARC report highlighted the need for significant investments in new infrastructure, including solar and wind generation, natural gas plants, and upgraded transmission capacity.
Virginia has set ambitious goals to achieve 100% renewable energy by 2045. However, the state’s existing infrastructure is struggling to keep pace with demand.
On the national level, data centers in the U.S. will continue to require more power with new data center load needing most energy by 2029, per S&P Global analysis.

A Sustainable Model for the Future
As Google and other tech giants like Meta expand their operations, solutions like energy parks could become essential for alleviating this pressure while ensuring that data centers are powered by clean, reliable energy.
Speaking of, the world’s largest AI data center will be built in Alberta, Canada, with an estimated $70 billion investment. Known as Wonder Valley, this data center will be powered by 7.5 GW of low-cost, renewable energy, with an emphasis on scalability to meet the growing demand of hyperscalers—large-scale data centers that can dynamically adjust to varying workloads.
The project, led by O’Leary Ventures, is to be located in a heavy eco-industrial district in the Greenview area. It will begin generating 1.4 GW of power in its first phase by 2026. Then it aims to add another 1 GW each subsequent year.
Wonder Valley’s integration of renewable energy sources and its focus on AI-driven computing make it a key player in the future of sustainable data infrastructure. This massive project will also position Alberta to be a major hub for clean energy and data processing.
All in all, the partnership between Google, Intersect Power, and TPG Rise Climate represents a new frontier in the intersection of digital infrastructure and clean, renewable energy. By combining the scale of data center growth with renewable energy generation, this collaboration sets a precedent for how large tech companies can address their environmental impact while meeting the energy demands of the digital age.
The post Google’s $20B Deal with Intersect Power and TPG Rise: How Can It Transform Data Centers? appeared first on Carbon Credits.
Carbon Footprint
Carbon credit providers vs marketplaces: who does what
Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.
![]()
Carbon Footprint
Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”
Democrats, Take The Deal. New York Times editorial, Nov. 12.
Carbon Footprint
Designing an Insetting Program: A Step-by-Step Playbook for Procurement
Insetting program design starts with your supplier map. The carbon claim comes much later.
Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.
If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.
Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.
Step 1: Insetting program design starts with supplier mapping
Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.
The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]
Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.
If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]
Step 2: Choose a commodity and jurisdiction for a pilot
Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.
Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.
Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.
Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.
Step 3: Design the supplier engagement and commercial model
The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.
Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]
Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]
Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.
Step 4: Build monitoring, reporting, and verification before rollout
Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.
For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.
CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.
Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]
Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.
Step 5: Decide what can be reported and claimed
Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.
SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”
Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.
What good looks like by year three
Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.
Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.
Discuss your insetting program with CCC
Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.
Sources
[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance
[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf
[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/
[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard
-
Climate Change1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Renewable Energy1 year agoSending Progressive Philanthropist George Soros to Prison?
-
Greenhouse Gases1 year ago
嘉宾来稿:探究火山喷发如何影响气候预测
-
Climate Change2 years agoAnalysis: China’s CO2 falls 1% in Q2 2024 in first quarterly drop since Covid-19
-
Climate Change1 year ago嘉宾来稿:探究火山喷发如何影响气候预测
-
Renewable Energy5 months agoSend a Bible to a Starving Child
-
Green Living2 years agoOur Picks for the Top 2024 Black Friday and Cyber Week Sales From Sustainable Brands

