Connect with us

Published

on

nickel

This December, the International Council on Clean Transportation (ICCT) released a report- “A Global and Regional Battery Material Outlook” that emphasized the critical need for major vehicle markets to achieve 100% BEV sales for new light-duty vehicles by 2035 and heavy-duty vehicles by 2040. This is in conjunction with the Paris Agreement’s target of limiting global warming to below 2°C. While progress lags behind this trajectory, many nations are setting ambitious targets and exploring new measures to accelerate vehicle electrification. This transition will drive a sharp rise in demand for batteries and essential materials like nickel, lithium, and cobalt.

Nickel Demand Soars with EV Batteries

Governments worldwide are adopting policies to expand battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs) to combat global warming and air pollution. 

The surge in EV adoption has significantly boosted demand for nickel, a key component in battery production. This analysis highlights trends in battery technology and the growing importance of nickel while exploring strategies to manage the demand for this material.

To begin with, let’s study the growth trajectory of electric vehicles as explained in the ICCT report.

  • Baseline projections estimate that global annual battery demand for road transport will grow from 808 GWh in 2023 to 3.8 TWh by 2030, reaching 7.0 TWh by 2040.
  • Light-duty vehicle (LDV) BEV battery demand alone is expected to increase ninefold by 2050, while heavy-duty vehicles (HDVs) will see a 24-fold jump.

icct report nickel battery demand

Moving on nickel’s role in the battery landscape continues to evolve. The silvery-white metal plays a vital role in high-performance batteries like lithium nickel manganese cobalt oxide (NMC) variants. This variant has higher nickel content and unique features like better energy storage and vehicle range. Thus, as EV adoption rises, nickel demand is expected to soar. 

  • The global nickel demand for EV batteries will reach 1.4 million metric tons (Mt) by 2030 and 2.2 Mt by 2040.

Image: Annual global demand for nickel under the baseline and demand reduction scenarios, all with the baseline battery technology share

nickel demand nickel supply

Tracking Nickel Demand for Batteries Across Regions

China

Nickel demand for batteries in China is expected to grow significantly, increasing from 93 kt in 2023 to 273 kt in 2030 and 379 kt in 2040. This rise is mainly due to the emergence of high-nickel NMC variants, even when the overall share of NMC batteries declines. However, policy measures like recycling programs and the promotion of smaller battery sizes could help reduce nickel demand by up to 29% by 2050.

United States

In the U.S. demand for nickel demand is set to surge from 50 kt in 2023 to 359 kt in 2030 and 471 kt in 2040. This reflects rising sales of high-nickel, low-cobalt NMC variants, such as NMC811. Additionally, recycling and changes in cathode composition are expected to moderate long-term demand growth.

European Union

The EU forecasts demand for nickel to increase from 71 kt in 2023 to 353 kt in 2030 and 623 kt in 2040. High-nickel variants, including NMC811 and NMC955, will dominate the market. However, smaller battery sizes and recycling could cut demand by 29% in 2035 and 16% by 2050.

MUST READ: Powering the Future of Nickel with NMC 811 Batteries 

India and Indonesia

Emerging economies like India will see a nickel demand surge, projected from 1 kt in 2023 to 20 kt in 2030 and 67 kt in 2040. Notably, industrialists predict that this growth will be driven by expanding BEV sales, especially two- and three-wheelers, and the adoption of high-nickel variants.

In Indonesia, nickel demand will climb from 0.18 kt in 2023 to 8 kt in 2030 and 27 kt in 2040. Indonesia’s rich nickel resources make it a top player in NMC battery production, potentially driving higher demand under NMC-dominant scenarios. On the contrary, a shift to high LFP market shares could reduce nickel demand.

Tackling Nickel Supply Challenges Amid Surging Demand

From the above study, we saw that high-nickel NMC batteries currently drive global nickel demand, with China, the United States, and the European Union leading this surge. However, advancements in battery technologies present viable pathways to reduce reliance on nickel.

For example, expanding LFP battery adoption could decrease nickel demand by 33% by 2030 and 21% by 2040 compared to baseline projections. Similarly, sodium-ion batteries, a promising technology with minimal nickel content, are expected to replace some LFP batteries. Thereby, further alleviating supply pressures.

These emerging technologies showcase the industry’s adaptability in overcoming supply chain challenges and addressing rising material costs. The growing shift toward diverse battery chemistries demonstrates the potential to balance material demand while maintaining electrification goals.

LFP NMC nickel

Strategies for a Sustainable Supply Chain

Ensuring a sustainable battery supply chain requires proactive strategies to manage nickel demand effectively. Key approaches include:

  1. Material Innovation: Developing and scaling low-nickel or nickel-free battery chemistries like sodium-ion and solid-state batteries to reduce dependency on critical materials.
  2. Battery Recycling: Investing in advanced recycling technologies to recover nickel and other valuable materials from used batteries, creating a circular economy.
  3. Smaller Batteries: Promoting EV models with smaller battery sizes to optimize material use and reduce the strain on raw material supplies.

Boosting Domestic Battery Production and Mining Capacities

Financial incentives are vital for strengthening domestic battery production and supporting material supply chains. Policies like the U.S. Inflation Reduction Act (IRA) provide tax credits for battery manufacturing, while the EU’s Battery Fund aims to boost battery production across Europe. Similarly, India’s FAME scheme and Indonesia’s reduced VAT for EVs link purchase incentives to the use of local components, enhancing domestic supply chains. These initiatives connect financial support to local manufacturing, fostering self-reliance and industry growth.

nickel critical minerals demand mining

A robust EV supply chain also requires upstream investments in mining and refining capacities. Under baseline scenarios, nickel mining is projected to meet 97% of global demand by 2030. ICCP predicts if LFP batteries gain more market share then nickel supply could exceed demand to adapt to the industry dynamics. 

Disclaimer: Visuals and Data Source

Alaska Energy Metals: An Emerging Nickel Player

However, mining and refining capacities face challenges, such as long project lead times and regional concentration. Governments with domestic reserves can step in with financial support to expand operations. For instance, the IRA mandates that some critical EV battery materials must be mined, refined, or recycled in the U.S. or allied countries. This ensures stable material flows, secures supply chains, and strengthens local economies.

By diversifying mining and refining capacities while promoting alternative battery chemistries, the industry can balance growth with sustainability and resource conservation.

Significantly amid all these challenging market conditions, an emerging player is targeting U.S. nickel independence. Alaska Energy Metals Corporation (AEMC) is leading efforts to support the U.S. energy transition through its flagship Nikolai project in Alaska. The site holds a significant resource of nickel, copper, cobalt, and platinum group metals. And the Canadian Nickel Junior is sourcing them sustainably.

Thus, a company like AEMC will play a significant role in reducing U.S. reliance on imports with robust exploration plans for nickel and other critical minerals. 

The post Nickel Supply Woes: Innovations Steering a Sustainable EV Future appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Carbon credit providers vs marketplaces: who does what

Published

on

Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.

Continue Reading

Carbon Footprint

Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”

Published

on

Democrats, Take The Deal. New York Times editorial, Nov. 12.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Trending