Gold mining is not only energy-intensive but is also challenging. Miners weigh various factors like geology, ore grades, depth, and transport distances which could potentially turn into challenges as well. However, as the world is transitioning to sustainability, gold fields are significantly considering reliable energy supply and management not just for power operations but also for reducing emissions.
The gold mining industry as a whole has a clear path to decarbonization that aligns with the Paris Agreement. They aim to cut absolute emissions by 50% and net emissions by 30% on their journey to net zero by 2050.
S&P Global Commodity Insights recently launched a gold emissions curve that showed, in 2024 emissions were lower than the 2021 baseline. It revealed:
“329 primary gold mines emitted greenhouse gases at an average rate of 792 kilograms of CO2 equivalent per paid ounce of gold (kgCO2e/oz Au) produced, 39 kgCO2e/oz Au. The emissions are lower than in 2021.”

Tackling Scope 1 and Scope 2 Gold Emissions
The report further illustrated that Since 2021, Scope 1 and Scope 2 emissions per ounce of gold produced have steadily declined. The overall progress was a result of renewable adoption for electricity generation, operational improvements, and technological upgrades in on-site operations. In this regard, many gold mining companies turned to power purchase agreements and carbon offsets in their decarbonization strategy,
However, addressing Scope 1 emissions still remains a challenge. This is because they are related directly to mining operations like equipment use, fuel consumption, and diverse on-site processes.
- Scope 1 emissions increased by 0.68 million metric tons of CO₂ equivalent between 2021 and 2023.
Conversely, scope 2 emissions are easier to mitigate and have shown remarkable improvements. They are associated with purchased electricity, heating, cooling, and steam, and have shown notable improvements.
- In 2023, Scope 2 emissions accounted for 39% of total emissions, down from 41% in 2021.
- Scope 2 emissions dropped by 1.32 million metric tons with the 2021 baseline despite the increase in gold production by 2.1 million ounces.

Top 3 Low Emitter Gold Mines
Lundin Gold’s Fruta del Norte
Lundin Gold Inc., based in Vancouver, British Columbia, is a Canadian mining company with a strong focus on sustainability and efficiency. The company 100% owns the Fruta del Norte gold mine in southeast Ecuador, which has been producing gold since late 2019.
Known for its low carbon emissions, high-grade output, and cost efficiency, Fruta del Norte is among the most environmentally responsible and productive gold mines globally. In 2023, it achieved an impressive production of 481,274 ounces of gold, making it one of South America’s largest gold producers.
The company holds 28 metallic mineral concessions and three construction material concessions in Ecuador’s Zamora Chinchipe province. As per its sustainability report,
- Lundin Gold maintains an industry-leading greenhouse gas (GHG) emissions intensity of just 0.08 tCO2e per ounce of gold produced. This makes the miner a top low-carbon gold producer.
The mine is powered by Ecuador’s national grid, which sources 81% of its energy from renewables. This is how it achieves significantly lower Scope 2 emissions.
Source: Lundin Gold
Centerra Gold Inc.
In 2023, Centerra Gold Inc. achieved a 77% drop in emissions intensity at its Öksüt mine, despite production suspension in 2022 due to mercury detection. They resumed operations in 2023 and sold higher gold ounces after resuming operations in June 2023. A mercury abatement system was installed to restart the mine. This led to the production of 195,926 ounces of gold—the highest since 2020- and consequently, it cut down emissions.
As per their sustainability report,
- Global Scope 1 emissions totaled 107,384 metric tons of CO₂e in 2023. The company’s two main operating mines, Mount Milligan and Öksüt, accounted for 90,655 metric tons.
Mount Milligan reduced emissions by 7% due to shorter haulage distances and optimized pit sequencing, while Öksüt achieved a 21% decrease from temporary mining interruptions and improved haulage cycles.
- Global Scope 2 emissions totaled 33,790 metric tons of CO₂e in 2023, with 13,185 metric tons from Mount Milligan and Öksüt.
Despite a 7% rise in electricity use, emissions remained stable through efficient energy use. Notably, Scope 3 emissions, with purchased goods and services contributed to more than 50%.
Source: Centerra-Gold
The company uses the Greenhouse Gas Protocol for emissions reporting and is exploring cost-effective decarbonization pathways to cut Scope 1 and Scope 2 emissions in the coming years. Additionally, it is evaluating opportunities to reduce scope 3 emissions.
Agnico Eagle Mines Ltd.
The Canada-based gold mining company, is the world’s third-largest gold producer, with operations in Canada, Australia, Finland, and Mexico. In 2023, the company achieved significant progress in reducing its emissions, particularly with its Kittila mine, which halved its Scope 2 emissions intensity. They achieved this by sourcing all of its grid electricity from zero-emission sources.
Source: Agnico Eagle
In total, Agnico Eagle produced 3.44 million ounces of gold in 2023, and all 11 of its active operations outperformed the industry average for emissions per ounce of gold produced.
The company’s total Scope 1 and 2 emissions in 2023 were 1,337,000 tCO₂e, a 3% reduction from 2022 and a 5% decrease from the 2021 baseline.
The mining giant has robust plans to upgrade its technological innovation, decarbonization efforts, and its Energy and Greenhouse Gas Management Strategy. Its dedication to sustainability and emissions reduction underscores its leadership in responsible gold production.
Other Players
For 2023, PJSC Polyus has fully offset its Scope 2 emissions since 2021 by sourcing renewable energy and acquiring carbon-free electric energy certificates from H2 Clean Energy LLC to cover 72,000 metric tons of CO₂e in 2023.
Additionally, Kinross Gold Corp. reduced its Scope 2 emissions intensity by 31% and Barrick Gold’s Nevada operations significantly cut 197,000 metric tons in 2023 with the 2020 baseline.
These reductions primarily came from renewable energy sources like hydroelectric and power purchase agreements to buy energy credits from solar power plants.
On the flip side, Sibanye Stillwater had the highest emission footprint…
The S&P Global report also highlighted that among all gold mines, South African mines have record-high emissions. And Sibanye Stillwater’s Cooke operation topped the list. It recorded a massive amount of 9,980 kg CO₂e per ounce of gold in 2023. The mine relies heavily on electricity from South Africa’s coal-based grid and processes low-grade historic tailings through two plants, Cooke and Ezulwini.
Outside South Africa, Pueblo Viejo in the Dominican Republic ranked second, with 3,236 kg CO₂e per ounce of gold in 2023, indicating a 25% rise from 2022. Emissions intensity increased due to a 22% drop in production, lower head grades, and reliance on diesel-powered plants.
Gold’s Role in a Sustainable Future
Gold plays a key role in modern technologies and the shift to a low-carbon economy. Its inclusion in investment portfolios also boosts resilience against climate risks, solidifying its status as a sustainable asset in global finance.
The gold mining industry is aligning with sustainability goals by cutting its carbon footprint while increasing production. This balance highlights better energy efficiency, cleaner technologies, and improved operational strategies.
The post Gold Emissions Trends: Who Are the Top 3 Low Emitters? appeared first on Carbon Credits.
Carbon Footprint
Carbon credit providers vs marketplaces: who does what
Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.
![]()
Carbon Footprint
Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”
Democrats, Take The Deal. New York Times editorial, Nov. 12.
Carbon Footprint
Designing an Insetting Program: A Step-by-Step Playbook for Procurement
Insetting program design starts with your supplier map. The carbon claim comes much later.
Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.
If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.
Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.
Step 1: Insetting program design starts with supplier mapping
Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.
The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]
Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.
If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]
Step 2: Choose a commodity and jurisdiction for a pilot
Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.
Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.
Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.
Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.
Step 3: Design the supplier engagement and commercial model
The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.
Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]
Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]
Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.
Step 4: Build monitoring, reporting, and verification before rollout
Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.
For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.
CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.
Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]
Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.
Step 5: Decide what can be reported and claimed
Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.
SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”
Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.
What good looks like by year three
Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.
Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.
Discuss your insetting program with CCC
Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.
Sources
[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance
[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf
[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/
[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard
-
Climate Change1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Greenhouse Gases1 year ago
Guest post: Why China is still building new coal – and when it might stop
-
Renewable Energy1 year agoSending Progressive Philanthropist George Soros to Prison?
-
Greenhouse Gases1 year ago
嘉宾来稿:探究火山喷发如何影响气候预测
-
Climate Change2 years agoAnalysis: China’s CO2 falls 1% in Q2 2024 in first quarterly drop since Covid-19
-
Climate Change1 year ago嘉宾来稿:探究火山喷发如何影响气候预测
-
Renewable Energy5 months ago<