Connect with us

Published

on

CARBONCREDITS

Gentoo.earth, a California-based company has launched an advanced, AI-powered intelligence platform to support carbon removal companies to scale up their operations. The company is founded by Juliet Kirby, an ex-Product Manager at Australian food-tech company Harvest B and former Oliver Wyman Management Consultant.

With powerful insights into market trends, their innovative tool can simplify the complexities of carbon removals and support companies for a lasting impact. This strategy will also help rebuild the VCM from the very beginning to achieve a measurable impact.

Fixing a Market in Crisis: Tackling VCM Challenges with Innovation and Transparency

The company has fairly analyzed the flaws of the traditional Voluntary Carbon Market (VCM). Due to an unstable foundation, it suffers from conflicting incentives, unreliable methodologies, and a few unreliable parties. As a result, the VCM has largely failed to support the global net-zero transition.

According to Gentoo.earth, the key issues include:

  • Shortage of permanent removals as the market lacks a steady supply of long-term carbon removal solutions.
  • Inconsistent standards create confusion and entry barriers.
  • Flawed, untrustworthy methods and opaque practices have damaged market credibility.

Elaborating further, the VCM faces problems due to unclear guidance on how carbon credits support net zero goals. There are also limited options for permanent fossil fuel emissions removal, making it hard for companies to find effective solutions. Another significant issue is the high costs for permanent removals that discourage buyers and reduce market participation.

These challenges contribute to a market that struggles to make a tangible contribution to global net-zero goals. Due to this inconsistency, corporations often find it difficult to track and understand varying net-zero strategies. This makes it hard for carbon removal companies to find suitable buyers.

Unveiling Demand in Carbon Removals

Gentoo.earth addresses a critical question in the market: Where are the buyers? By analyzing thousands of corporate climate reports, the platform has discovered that 19% of evaluated companies are interested in permanent carbon dioxide removal (CDR) solutions, even though they may not be highly visible to suppliers.

This data highlights an untapped demand for durable removals and bridging a significant gap in the market.

So, what are their solutions for carbon removal companies?

Gentoo.earth’s Solution: Empowering Carbon Removers

Gentoo.earth empowers carbon removal suppliers by offering unique, data-driven insights traditionally held by buyers. The platform encompasses detailed data from over a thousand public companies, shedding light on:

  • Corporate Net-Zero Targets: Track goals and commitments.
  • Annual GHG Reduction Progress: Monitor companies’ progress toward emissions goals.
  • Carbon Credit Strategies: Discover carbon credit preferences and usage.
  • Key Climate Priorities: Identify what drives companies’ climate agendas.

By consolidating this data, Gentoo.earth makes it easier for companies to find buyers, saving them up to 80% of the time they would spend analyzing climate strategies manually.

Building a Sustainable VCM for the Future

The VCM must scale rapidly to mitigate the impact of climate change effectively. To achieve this, the company advocates a fundamental reset based on transparency, scientific rigor, and equitable access to data across market participants. Key aspects of this transformation include:

  • Independent standards and exchanges: built with scientific accuracy and impartial oversight.
  • Clear carbon credit pathways: establishing which credit types apply to specific emissions sources.
  • Accessible market data: ensuring all participants have access to transparent, high-quality data.

Gentoo.earth

source: Gentoo.earth

The company draws inspiration from Bloomberg’s transformative approach in financial markets, where increased transparency enabled both buyers and sellers to make informed decisions, drastically increasing transaction volumes. They also envision a similarly transparent VCM, where suppliers gain insight into buyers’ demands, reducing friction and accelerating market growth.

Overall, with this explanation, one can understand how Gentoo.earth’s innovative platform transforms the VCM by enabling suppliers to efficiently meet buyer demands. With these tools, carbon removal companies can succeed and create a more effective and sustainable carbon market together.

The post Gentoo.earth Launches AI-Driven Platform to Simplify Corporate Net Zero appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Carbon credit providers vs marketplaces: who does what

Published

on

Carbon credit providers vs marketplaces is the first comparison many buyers try to make. In this comparison, a carbon credit provider is the project developer: the company that originates credits from its own projects and sells them directly. A carbon credit marketplace is a platform that lists credits from many projects at published prices.

Continue Reading

Carbon Footprint

Democrats who call climate change an emergency should not defend a permitting system too slow to build the clean energy that would address it.”

Published

on

Democrats, Take The Deal. New York Times editorial, Nov. 12.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com