Connect with us

Published

on

Verra approved the first carbon credits under its new digital monitoring, reporting, and verification (DMRV) pilot. This move signals a major shift in how carbon credits are issued. Instead of waiting for annual verification cycles, projects can now receive high-frequency issuances, including monthly or bi-monthly approvals. As a result, the carbon market may become faster, more transparent, and more data-driven.

The first credits under this pilot came from the Foumbouni-Mitsamiouli solar farm project (Verra Project 3788) in the Union of Comoros.

Foumbouni-Mitsamiouli Solar Project Leads Verra’s Digital Carbon Shift

The project operates on Grande Comore Island, also known as Ngazidja. It was developed and is operated by Innovent Comores and Aera Group. The project follows the Clean Development Mechanism (CDM) methodology AMS I.D, which applies to grid-connected renewable electricity generation.

The solar initiative includes two photovoltaic parks, each with a capacity of 4 megawatt-peak (MWp). One is located in Foumbouni in the south of the island, while the other is in Mitsamiouli in the north. Together, the facilities use 10,080 solar modules rated at 405 Wp each. The panels are mounted on single-axis trackers with a backtracking system, which improves efficiency by adjusting panel angles throughout the day.

solar farm
Foumbouni-Mitsamiouli solar project: Aera

In addition, the project integrates 1 MW/2 MWh of battery storage. This storage system allows the solar plants to operate in hybrid mode and islanding mode. In simple terms, the plants can stabilize the grid and export clean power even when grid conditions fluctuate.

This development marked a turning point for the island’s energy system. Before the solar farms came online, the national utility SONELEC relied almost entirely on diesel-fired power plants. Electricity access remained below 60%, and supply was often unreliable. Diesel imports were costly and exposed the country to fuel price volatility.

Now, each plant generates around 12.7 gigawatt-hours (GWh) of electricity per year. On average, the bundled project reduces 9,384 tons of carbon dioxide equivalent annually. Beyond emissions cuts, the project strengthens national energy security and creates local employment opportunities.

Most importantly, it replaces fossil fuel-based electricity with renewable solar power. For a country that depended heavily on diesel generation, this shift is significant.

Fully Digital Verification Sets a New Standard for Carbon Credit Integrity

SustainCERT acted as the validation and verification body (VVB). It conducted a fully digital verification process. Project developers submitted monitoring data electronically, and the verification process took place entirely online. This marked the first successful digital verification under Verra’s DMRV pilot.

Verra Project Hub Powers a New Digital Era

Verra launched the DMRV pilot as part of a broader plan to digitize its entire project cycle. The organization aims to improve efficiency, reliability, speed, and transparency across the voluntary carbon market.

At the center of this transformation is the Verra Project Hub. This online platform serves as a comprehensive tool for creating and managing projects under Verra’s standards programs. It allows project proponents to submit validation, monitoring, and verification documents digitally. It also integrates directly with the Verra Registry, enabling faster issuance once approvals are granted.

The platform simplifies several steps in the project lifecycle. For example:

  • It enables the digital submission of monitoring data.
  • It automates calculations of emission reductions and removals using built-in engines aligned with approved methodologies.
  • It allows VVBs to access project records and submit verification reports directly.
  • It tracks milestones, deliverables, and reviews progress in real time.

As a result, stakeholders can collaborate more efficiently. Communication between project developers, VVBs, and Verra becomes smoother. At the same time, the system enhances transparency because documentation and data are centrally managed and traceable.

Verra is also digitalizing its most widely used methodologies. Templates collect all required project information in a structured format. A built-in calculation engine then computes emission reductions or removals for a given crediting period. This reduces human error and improves consistency across projects.

Verra digital carbon credits
Source: Verra

Digital Project Submission Tool for QC

In parallel, the Digital Project Submission Tool strengthens quality control. It checks data consistency and completeness using automated validation logic. If data is missing or incorrect, the system flags it immediately. Corrections can be made quickly, and all changes are logged for traceability. This improves auditability and builds trust among credit buyers.

Safeguards and Phased Credit Issuance

Under the DMRV pilot, Verra introduced a phased issuance structure to manage risks.

If a DMRV-based verification request for a high-frequency issuance installment is approved, the project proponent may request 80% of the approved credits. Verra withholds the remaining 20% as a safeguard during the pilot phase.

After one year of high-frequency issuances, the project must undergo a full traditional verification. This broader review covers additional elements such as safeguards, stakeholder engagement, and other non-digitized parameters. If Verra approves this non-DMRV-based verification request, the proponent can request issuance of the remaining 20%.

This structure balances innovation with risk management. It allows projects to benefit from faster cash flow while maintaining environmental integrity.

Verra is currently piloting this digital process for other project types as well. These include carbon capture and storage (CCS) activities and clean cookstove projects. If successful, the DMRV approach could expand across multiple sectors.

LATEST:

Carbon Market Supply and Demand Shift in 2025

While Verra pushes digital innovation, the broader carbon market also experienced notable changes in 2025.

As of December 31, 2025, more than 10,200 projects were registered across 18 major carbon credit registries tracked by MSCI. During the year, these projects issued 294 million tonnes of carbon dioxide equivalent (MtCO2e). Since the Paris Agreement was signed in late 2016, cumulative issuances have surpassed 2.6 billion credits.

Also, according to Sylvera, new issuances declined to roughly 270 million tonnes in 2025. This marked the lowest annual issuance level since 2020.

sylvera carbon credits issuances

On the supply side, renewable energy credits saw the sharpest drop. For years, market participants debated their additionality. Many buyers increasingly viewed grid-connected renewable projects as having limited incremental climate impact, especially in markets where renewables are already competitive. As confidence weakened, fewer new renewable credits entered the market.

Nature-based projects still dominate overall volumes. Forestry and land-use projects remain the largest sources of issued and retired credits. However, even within this segment, the mix is evolving. Buyers now focus more on quality, permanence, and robust monitoring systems.

On the demand side, retirements fell slightly in 2025. Yet this does not necessarily signal declining corporate interest. The number of buyers remained relatively stable. What changed was purchasing behavior.

msci carbon credit demand and supply

Companies became more selective. They scrutinized methodologies, co-benefits, and verification standards more closely. In many cases, they shifted toward higher-integrity credits, even if volumes were lower. At the same time, price sensitivity increased in some segments.

Therefore, the market is not shrinking. Instead, it is maturing. Buyers demand stronger transparency, clearer impact, and better data.

Digitalization Could Restore Confidence

In this context, Verra’s DMRV initiative arrives at a critical moment. As the voluntary carbon market faces scrutiny over quality and additionality, digital monitoring and automated calculations can improve credibility.

High-frequency issuance also benefits project developers. Faster approvals improve cash flow and reduce administrative delays. Meanwhile, automated systems reduce manual paperwork and the risk of calculation errors.

For buyers, digital verification enhances confidence. Real-time data submission and traceable logs create a clearer audit trail. Over time, this may help rebuild trust in segments where credibility has weakened.

Ultimately, the Foumbouni-Mitsamiouli solar project represents more than just a renewable energy investment. It marks the beginning of a new digital chapter for carbon markets. If Verra successfully scales DMRV across sectors, the VCM could become more transparent, efficient, and resilient in the years ahead.

The post Verra’s First DMRV Solar Project Pushes Carbon Credits into the Digital Era appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Carbon Footprint

The Strategic Case for Nature-Based Carbon Investments

Published

on

Nature-based carbon investments deserve consideration when they address a specific business dependency and produce outcomes you can measure. Imagine Moonbucks, a global coffee roaster planning next season’s espresso blend. It is considering natural Grade 4 coffee from Jimma, in southwestern Oromia, Ethiopia. Its sourcing decisions affect the roasting schedule and the cash tied up in coffee purchases. Moonbucks needs to understand which measures could protect that supply, what they would cost and how it would judge the results.

1. Define the sourcing problem before choosing a project

Moonbucks needs a dependable component for its espresso blend. Its procurement team wants continuity of volume and an agreed cup profile. Replacing a shipment at short notice could require new sample approval and changes to the blend, and given the schedules for cultivation, processing, and freight delivery, is practically impossible. Moonbucks needs to get this right, and its initial concern is inconsistent deliveries. It commissions an assessment of the supplying farms and post-harvest chain. The questions cover land condition, harvest availability and whether drying or storage problems are affecting saleable lots.

This distinction changes the investment brief. A tree-planting proposal cannot be assumed to fix drying problems. Better storage cannot restore eroded land. The team must establish which problem exists before selecting the response.

CCC’s guide to finding nature-based solutions in your supply chain explains where to look. Here, the next task is to turn a broad concern into a testable proposal.

2. Develop nature-based carbon investments around the actual supply chain

The assessment would trace Moonbucks’ purchases back through the exporter and supplying producer groups. Which farms supply the contracted lots? Who controls land-management decisions? How long does the buyer expect to maintain the purchasing relationship?

Furthermore, Jimma natural Grade 4 cannot be treated as interchangeable with every Ethiopian coffee. Moonbucks would need to test any substitute against its own blend and quality requirements.

Suppose Moonbucks’ assessment identifies an opportunity to maintain shade trees and restore vegetation along exposed streambanks. The IPCC describes agroforestry as a way to store carbon in vegetation and soil, with potential benefits for erosion control and water quality.1 Moonbucks would need local advice on species, growing conditions and maintenance before deciding how these measures fit its sourcing plan.

The proposal now has a defined sourcing connection and a candidate intervention. The next steps are to test its effect on production, assess carbon eligibility and build the financial case.

3. Compare the proposal with other ways to protect supply

WBCSD’s Nature-based Solutions Blueprint recommends comparing nature-based options with other responses across their benefits and costs.2 For Moonbucks, that means evaluating the landscape proposal alongside drying improvements, storage controls and alternative sourcing arrangements.

The product’s natural-process designation matters. Moonbucks should examine the drying and dry-milling chain alongside land conditions. Its team would check storage practices, contamination risks and incoming-lot quality to see whether problems arise before or after the coffee leaves the farms.

The revised proposal might combine land stewardship with separate post-harvest controls. Each component needs its own purpose and budget. A sustainability label should not obscure which activity is expected to solve which problem.

The project develops as the evidence improves. Its scope should follow the diagnosis rather than preserve the first idea unchanged.

4. Establish what the carbon outcome could count toward

Moonbucks’ sustainability team now tests the proposed carbon case separately from the sourcing case. Is the objective a measurable change in Moonbucks’ value-chain emissions, verified credits for separate voluntary use, or distinct outcomes under carefully defined arrangements?

Scope 3 covers value-chain emissions. A purchasing relationship alone does not prove that a farm intervention can be included in Moonbucks’ inventory. The team needs an applicable accounting method, defensible boundaries and evidence supporting attribution.

SBTi’s FLAG Guidance (forest, land and agriculture), version 1.2, says purchased credits used as offsets cannot meet near-term FLAG or energy and industry targets. Eligible land-based removals are subject to accounting requirements.3 Moonbucks needs to test its proposal against those rules before including an outcome in its targets.

For Moonbucks’ Jimma proposal, maintaining existing trees and establishing new vegetation could involve different carbon questions. Specialists must examine the baseline and additionality, meaning what changes because the project proceeds. They must also assess measurement and the risk that stored carbon is lost. CCC’s MRV and additionality article introduces those tests.

Until that work is complete, Moonbucks should not budget an assumed Scope 3 reduction or credit-sale receipt. Direct emissions reductions remain the priority.

5. Build a financial case that survives weaker assumptions

Moonbucks’ finance team would now build a multi-year budget. UNEP’s State of Finance for Nature 2023 compares current finance with the investment needed to meet climate, biodiversity and land-restoration goals.4 The company would cost its proposed activities, farmer participation and ongoing monitoring. Verification, where required, is a separate expense. Maintenance and responsibility for replacing failed plantings must remain visible after the initial establishment budget ends.

Operational benefits need equally careful treatment. If fewer rejected lots reduce emergency purchasing, count that saving once. Do not add “supply resilience” as another financial benefit when it represents the same avoided cost.

Moonbucks should compare a base case with slower benefits, higher implementation costs and no carbon revenue. It should also distinguish production outcomes from quality and shipment outcomes. A single good harvest would not prove that the landscape intervention caused better delivery performance.

A project can remain worth funding even when its carbon case needs more work. That decision must rest on the operational evidence and the company’s objectives, without unsupported environmental claims.

6. Fund a pilot with a clear expansion decision

Moonbucks’ first approval would fund a bounded pilot, rather than commit the entire sourcing program. Before spending, Moonbucks would agree on participating farms, responsibilities and the evidence needed at review.

Its scorecard could track farmer participation, implementation costs and plant survival, alongside accepted coffee volumes and lot-quality results. Carbon measurements would follow the selected method. Farm-level traceability must connect the intervention to the actual sourcing relationship.

Suppose Moonbucks’ review later finds that storage changes explain most quality improvements, while the land measures need longer observation. Those findings would shape the next decision: expand the proven component, adjust the landscape work or pause further spending. They would not justify crediting all improvements to tree planting.

This gives nature-based carbon investments a practical place in a multi-year strategy. Funding increases as the evidence supports it, and the project can change direction before a larger commitment.

Discuss a sourcing opportunity with CCC

Carbon Credit Capital’s nature-based supply-chain investment service uses its Dual-Value Model to examine supply-chain economics alongside potential sustainability outcomes.

Schedule a consultation to discuss your sourcing exposure and the questions to resolve before allocating capital.

Sources

  1. Intergovernmental Panel on Climate Change (IPCC), Climate Change 2022: Mitigation of Climate Change, Chapter 7, Agriculture, Forestry and Other Land Uses, section 7.4.3.3 (Agroforestry).
  2. World Business Council for Sustainable Development (WBCSD), Nature-based Solutions Blueprint, 5 June 2024.
  3. Science Based Targets initiative (SBTi), Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, section 3.1.4, pp. 37–38.
  4. United Nations Environment Programme (UNEP), State of Finance for Nature 2023, 2023.
Continue Reading

Carbon Footprint

How to buy plastic credits, and what to check before you do

Published

on

A plastic credit funds the collection of plastic waste in places where no formal system exists to collect it. Each credit represents a measured, independently audited quantity of plastic taken out of the environment or returned to use, tracked on a public registry.

Continue Reading
Advertisement