Connect with us

Published

on

HighPeak Energy has completed and commissioned the 9.9 MW WildHorse Solar Farm, located in the Flat Top, Texas region. 

The project was developed, and is owned and operated, by Priority Power Management. Priority Power’s scope of work for the farm included managing its interconnection process and the turnkey design, building and EPC services.

“Priority Power has been a pleasure to work with throughout this process,” says Mike Hollis, president of HighPeak. 

“HighPeak constantly strives to be great stewards of the environment and this solar farm is both fiscally and environmentally beneficial for our shareholders and the local community. The 10 MW generated from this project will reduce our power costs, shield us from summer spot power price spikes and reduce our carbon footprint. HighPeak has been energizing our drilling rigs with grid power, and we are now drilling with power directly supplied by West Texas sunshine.”

The post WildHorse Solar Farm Goes Into Commission appeared first on Solar Industry.

WildHorse Solar Farm Comes Online

Continue Reading

Renewable Energy

Foreign-Born Judges

Published

on

Absolutely!

We need to rewrite every word of the U.S. Constitution to support all the hate and ignorance of modern-day America.

With a little work, we can be one big Alabama: uneducated, dirt poor, diseased, inbred, and White supremacist.

Let’s get ‘er done!

Foreign-Born Judges

Continue Reading

Renewable Energy

So Much Has Changed, So Quickly

Published

on

It seems like just yesterday that there was honor and integrity in the U.S. presidency.

So Much Has Changed, So Quickly

Continue Reading

Renewable Energy

Sad but Funny at the Same Time

Published

on

Ann Coulter looks like a complete jackass every time she opens her mouth.

Sad but Funny at the Same Time

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com