Australia is quickly becoming a global leader in renewable energy, with commercial solar power systems playing a significant role in this progress. These systems offer businesses clean and sustainable energy, helping to lower costs and benefit the environment.  

While these systems can vary in size and design, they aim to help businesses switch to renewable energy and increase their savings. Our ultimate guide to commercial solar installation in Australia will provide all the information.  

A commercial solar power system has four main parts: solar panels, inverters, mounting equipment, and monitoring systems. Solar panels collect sunlight and generate electricity in direct current (DC) form.  

Inverters then change this into alternating current (AC), which businesses can use. Monitoring systems track energy production, usage, and savings while mounting equipment ensures the panels are securely installed. 

Commercial solar installation is becoming popular in Australia because it lowers energy costs, reduces greenhouse gas emissions, and gives businesses more energy independence.  

The installation process is now more manageable, and there are flexible financing options to suit different industries. 

Understanding Commercial Solar

Solar photovoltaic (PV) technology is an excellent way for homes and businesses to use solar energy. It works by installing solar panels that turn sunlight into electricity.  

Over the years, solar PV systems have grown a lot, making them more affordable and practical for businesses looking to save on energy costs and protect the environment.   

Commercial solar systems are more significant and generate more power than home systems. For example, a typical home solar system 2024 is about 6.6 kW, with around 18 panels. In contrast, business solar systems come in three main sizes:   

  • Small systems: Less than 30 kW (up to about 100 panels)   
  • Medium systems: Between 30 kW and 60 kW   
  • Large systems: More than 60 kW   

Since commercial solar systems are more significant, they can include more panels and produce more energy, which is ideal for companies needing a lot of electricity or those with large roof spaces for installation.   

Commercial solar systems also have extra costs and engineering needs compared to home systems. For instance, a system with more than 30 kW of inverter capacity needs special grid connection processes and protection units.   

Recent improvements in solar PV technology have made commercial solar cells much more efficient.  

For example, ten years ago, Australian companies developed commercial solar cells with an efficiency of about 14–16%. These advancements allow businesses to produce even more energy with their solar systems.   

Understanding commercial solar involves learning about solar PV technology and the differences between home and business systems.  

Businesses can make smarter decisions to adopt solar energy, save money, and support sustainability by looking at system size, energy output, and improved solar cell efficiency.  

Benefits of Commercial Solar Power 

Energy Savings

Commercial solar power systems help businesses save a lot on energy costs. By generating electricity from solar panels, companies can rely less on the grid and lower their energy bills.  

With energy prices rising in Australia, switching to solar is a smart way to control costs and improve financial stability. Solar systems also provide steady energy throughout the day, making electricity more efficient.   

Environmental Benefits

Using commercial solar power helps reduce a business’s carbon footprint. Unlike fossil fuels, solar energy is clean and doesn’t produce greenhouse gases or air pollution.  

By switching to solar, companies can significantly cut their environmental impact and support Australia’s move toward a more sustainable energy future. This shift also contributes to the fight against climate change and promotes a low-carbon economy.   

solar energy

Better Business Image

Investing in commercial solar power saves money, protects the environment, and improves a company’s reputation. Businesses that use renewable energy are seen as responsible, forward-thinking, and socially conscious.  

This commitment to sustainability can attract eco-friendly customers, boost employee morale, and enhance the company’s image in the market. Additionally, having green credentials can give businesses a competitive advantage and create new growth opportunities.  

Guide to Commercial Solar Installation

Site Assessment

The installation process begins with a site assessment. A solar expert or engineer visits the business location to determine whether it’s suitable for solar installation.  

They examine the roof’s structure, shading, orientation, and available space. This assessment helps determine the system’s size, layout, and best positioning for maximum energy production.   

System Design

After the site assessment, a solar engineer creates a system design. This includes selecting the right solar panels, inverters, and mounting equipment to ensure the system performs efficiently and lasts a long time.  

The design also accounts for the electrical setup and any needed upgrades to handle the extra electricity. Custom solutions, such as energy storage or space-saving designs, may be included for businesses with special needs.   

Approvals and Permissions

Utility companies and local authorities must obtain the necessary approvals and permissions before installation. The requirements depend on the system’s size and local rules.  

Most commercial solar systems need approval from the power network operator to confirm that the grid can support the new system. In some cases, planning permission may also be required, especially for large or noticeable installations.   

Permits and Paperwork

Before you can begin installation, you must get several permits and approvals. This will usually include applications to the local council, grid connection approvals from your energy provider, and extra licenses, depending on the size and scope of your installation.  

Experienced commercial solar panel installation firms typically include this in their service package.  

Selecting the Right Components

Choosing the appropriate solar panels and inverters is crucial. The market is flooded with different effectiveness, warranty, and price solutions.  

In Australia, selecting high-quality components that can resist the local climate while providing optimal performance over time is critical.  

Commercial solar panel installers can offer helpful guidance on selecting the appropriate components for your specific requirements. 

Installation and Commissioning

Once everything is approved, the installation begins. Trained technicians and electricians install the solar panels, mounting systems, and other components according to the design. Safety measures are followed to protect the workers and the building’s occupants.   

Certified installers will fit the solar panels onto your roof, install inverter batteries (if applicable), and do all necessary electrical work.  

Safety is paramount during this phase, and choosing a team that follows strict safety protocols is crucial. The duration of the installation will depend on the system’s size and complexity. 

After installation, the system goes through a commissioning process. This involves testing to ensure everything is working safely and as planned.  

Once approved, the system is ready to generate clean, renewable energy, helping the business lower energy costs and support sustainability efforts.  

Monitoring & Maintenance

Post-installation, it’s all about making the most of your solar investment. Modern commercial solar panel installations have monitoring devices allowing you to see real-time energy production and usage.  

Regular maintenance inspections are also required to ensure your system’s best operation and longevity. 

Understanding Commercial Solar Panel Installation Costs

Cost is a key factor for businesses when considering commercial solar panels. While the upfront cost can be high, the investment pays off over time through lower energy bills and potential government incentives.   

Factors Affecting Costs

The cost of installing commercial solar panels in Victoria depends on several factors:   

System size: Larger systems with higher energy capacity cost more.   

Quality of components: High-efficiency panels and premium inverters are more expensive but offer better long-term value.   

Installation complexity: Complicated roof designs or extra electrical work can increase costs.   

Incentives and rebates: Government programs can reduce upfront expenses, so it’s worth checking what’s available during installation.   

Return on Investment

It’s important to think beyond the initial cost and focus on long-term savings. Solar panels can significantly cut or even eliminate electricity bills. With electricity prices rising, the payback period is often shorter than expected.   

Government Incentives

The Australian government offers financial support to businesses investing in solar:   

Small-scale Technology Certificates (STCs): These certificates provide upfront discounts for systems up to 100kW, reducing the initial cost.   

Large-scale Generation Certificates (LGCs): For systems over 100kW, LGCs are issued annually based on energy production and can be sold for extra income.   

Power Purchase Agreements (PPAs)

A Power Purchase Agreement (PPA) is a contract where a solar provider installs and maintains the system.  

The business agrees to buy the electricity it produces at a set rate. PPAs are ideal for companies that want solar benefits without the upfront costs, as the provider handles installation and maintenance.   

commercial solar

Environmental Upgrade Agreements

An Environmental Upgrade Agreement (EUA) is a financing option involving a building owner, a financier, and the local government.  

It provides low-interest, long-term loans for renewable energy projects like solar. These loans are repaid through council rates, making them more accessible and affordable than traditional loans.   

Loans and Leasing

Businesses can also finance solar systems through loans or leasing:   

Loans: Many banks offer loans tailored for renewable energy, with competitive rates and flexible repayment terms. This allows businesses to install solar without needing a significant upfront payment.   

Leasing: With leasing, the solar company owns and installs the system, and the business pays a monthly fee to use it. At the end of the lease, the business can purchase the system or upgrade to a newer one, providing flexibility and access to the latest technology.   

By exploring these financial options, businesses can find a solution that works for their needs and budgets, making the transition to solar power more manageable and cost-effective.  

Contact Cyanergy to get the best commercial solar panel installation! GET A FREE QUOTE TODAY! 

Your Solution Is Just a Click Away

The post Ultimate Guide to Commercial Solar Installation in Australia appeared first on Cyanergy.

https://cyanergy.com.au/blog/ultimate-guide-to-commercial-solar-installation-in-australia/

Continue Reading

Renewable Energy

IWTG Consulting on Pitch Bearing Cracks, Loose Root Inserts

Published

on

Weather Guard Lightning Tech

IWTG Consulting on Pitch Bearing Cracks, Loose Root Inserts

Jon Zalar, founder of IWTG Consulting, joins to discuss broken blade bolts, cracked pitch bearings, loose root inserts, and early detection.

Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us!

Welcome to Uptime Spotlight, shining light on wind energy’s brightest innovators. This is the progress powering tomorrow

Allen Hall: Jon, welcome back to the program.

Jon Zalar: Thanks for having me.

Allen Hall: Uh, last time I saw you, we were in Melbourne- Yep … at WOMA 2026, and that was a huge event. We know we’re gonna do it again next year in March three, the 3rd through the 5th, so you’re invited back, of course- I can’t wait … if you can make it. Yeah. Yeah.

It’s gonna be, it’s gonna be a good time. A lot is happening in the blade world and in the wind turbine world more broadly. A lot of things we’re hearing right now are related to blade bolt connection, pitch bearing inserts still. A lot of that still happening in the United States. What is the current status of, uh, the blade connection issues in the US?

I,

Jon Zalar: I feel like it’s a growing [00:01:00] issue, not super, super fast, but it seems to be getting a little worse. There’s, you know, more bolts breaking at that joint. Um, pitch bearing cracks are, seem to be pretty common. There’s different solutions for it, and then, you know, the root inserts are another thing that we’ve talked about before that seem to be happening more and more, or maybe more and more people are finding them ’cause they’re looking.

Allen Hall: What are the first indications that you have a blade bolt or some sort of joint issue at the root of a blade? What can you see?

Jon Zalar: A bolt laying in the hub bouncing around. Um, you know, from like a– looking at it from, like, the sensors on the turbine, it’s really hard to tell unless it gets really bad. Uh, some of the OEMs have some analytics developed to kinda start to indicate if there is a aero change because there’s missing bolts or root inserts are coming out, and they’re using that as a way to go figure out which ones to go inspect first.

Allen Hall: Really? Yeah. You think [00:02:00] the SCADA data will give you some indication that you have a, basically a little bit of a loose blade?

Jon Zalar: Yeah. I, I, I think because the number of turbines and the number of data points you have, I think there is a pretty good analytic out there right now.

Allen Hall: Wow. All right. I think a lot of our operators have not taken advantage of that.

Is, is that just b- based on the high-speed data, SCADA data, or is it low-speed data you could see that same effect?

Jon Zalar: I believe it’s on the low-speed data as well, but I bet the high-speed data was used to kinda develop it.

Allen Hall: Wow. All right. So that’s a huge help to operators. Yeah. So what are you looking for if you’re looking through SCADA data, what would be the couple of markers there that say, “Hey, maybe we ought to go look up at the– in the hub”?

Jon Zalar: I don’t know exactly what they’re using, but they would basically look for maybe an imbalance or looking for certain components that are being overworked.

Allen Hall: Oh, sure. Okay.

Jon Zalar: Yeah.

Allen Hall: So your pitch actuator may be getting a little bit overworked. It would seem like one of the places- I think that, yeah … that would get loaded, right?

Jon Zalar: Mm-hmm.

Allen Hall: Okay. [00:03:00] And any vibration monitoring going on? Because it, it, uh, in some cases you’re– I’m hearing, like, millimeter gaps-

Jon Zalar: Correct. Yeah …

Allen Hall: between the blade and the pitch bearing.

Jon Zalar: So probably a combination of the ALC sensors, at least on a GE turbine, looking at that. But the PCH box also is looking at the tower vibration, so it could be a combination of all three.

I don’t know the exact- Okay … details, but between all of that, I think there are some analytics that kinda say, “Hey, go take a look.” And then I think there’s some other companies that have- tools that go monitor it.

Allen Hall: Mm-hmm.

Jon Zalar: Dial indicators remotely or even, you know, people going up there with dial indicators to go kind of rotate the rotor and kind of see if there is gapping between the blade and the pitch bearing.

Allen Hall: Is that a safe situation in your– from the gapping? I’ve heard this where they’ve basically took shims and they’re trying to measure this gap or some sort of dial indication. Is that a smart thing to do? Is it even reliable to do it that way? [00:04:00]

Jon Zalar: I, I, I think there’s some reliability there. And like, you know, these are really big parts, right?

So like a little bit of gap, it, it’s probably expected to a point, but growing gaps is where you should be a little more scared.

Allen Hall: So you’re– you would have to go do that quarterly, monthly, weekly? How, how often would you have to do it to see the progression? Because I’ve heard stories of, uh, a couple of weeks from nothing to hub crack to, “Oh, it took a year or more.”

Jon Zalar: I think it depends on the issue. I think for– if you’re looking at that, the bolted joint itself between the root inserts and the, uh, bolts breaking itself, I, I think they’re doing about quarterly. Now, the pitch bearings inspections are also quarterly. They’re al- they’re, they’re leveraging the drone inspections for the blades, and they’re looking at the pitch bearings to see if they’re cracked, right?

Uh, you guys are doing that too.

Allen Hall: Okay.

Jon Zalar: I think Coraly is doing a good job mitigating the risk, feels like.

Allen Hall: Wow. All right. [00:05:00] Yolanda, looking at pitch bearings, you’ve looked at a lot of drone images in your lifetime. Mm-hmm. How much can you see on drone images on pitch bearings? Can you see cracks and, or y- or do you see grease, which is a really indication that something is wrong in the bearing?

Yolanda Padron: You can see grease. You can see the cracks pretty, pretty well. Yeah. The drone images are, are really high quality. Uh, but you did mention that it’s something that you’re seeing a lot more. Is it because there’s a lot more aging fleets, or is it a problem with a lot of the new turbines that are coming online?

Jon Zalar: I, I think it’s an, I think it’s a more of a fatigue problem, so the aging of the fleet. And also, I think more people are looking at it, right? ‘Cause, like, initially the drones that were looking for blade cracks weren’t looking at pitch bearings, but then pitch bearings started cracking, so now they added that to whatever they buy off the drone companies, right?

Go look at my pitch bearings, for example.

Allen Hall: Hmm.

Jon Zalar: So I, I think it’s a problem of the more you look sometimes, the more you find.

Yolanda Padron: Hmm.

Jon Zalar: Yeah.

Allen Hall: So we [00:06:00] have root insert issues, which are being addressed by a couple of different companies- Yes … uh, uh, with somewhat similar solutions. OEM is offering one right now also.

Jon Zalar: I, I think there’s three solutions. There’s two uptower that are basically looking at ways to go fill the void between the root insert itself and the blade root. Um, and I– there’s another company that’s also more of a downtower solution where they’re actually, like, r- drilling out the root inserts and putting new ones in that are gonna last better, longer.

Allen Hall: Okay. So the drilling out is, would be CNC onsite. Correct.

Jon Zalar: Yeah.

Allen Hall: And they’re based over in Europe. But th- the drilling out is a take the blade down, set it on the ground sort of- Yeah. Right … doing really fine machining on the, on the blade itself. So that, that’s a different, completely different insert that’s going into that-

Jon Zalar: Correct

Allen Hall: new hole or- Yep … clean hole, right? So it’s a, just a, uh, totally different kind of product versus trying to inject [00:07:00] some s- sort of epoxy or resin into the, the void.

Jon Zalar: Right. Yeah. Uh, I mean, you would prefer to do it uptower. It’s gonna cost you less money.

Allen Hall: Sure.

Jon Zalar: But you wanna make sure you do it right, so I think, uh, I do foresee it being a combination of both solutions kinda going forward.

Allen Hall: Is it dependent upon, like, how much damage has been already done, or what the fatigue w- uh, an estimate on what the fatigue life is?

Jon Zalar: I think it’s strictly on measurement perspective right now. So how much gapping you have, um, kinda determines what potential solutions you have.

Allen Hall: So the gaps aren’t big, right?

So the, the gaps I hear are one millimeter is k- kind of sort of start a problem.

Jon Zalar: Mm-hmm.

Allen Hall: Three millimeters is, “I need to be making decisions.”

Jon Zalar: Yeah. So- That, that’s what I’ve heard, too. Yes.

Allen Hall: Three millimeters is about a eighth of an inch.

Jon Zalar: Mm-hmm.

Allen Hall: So it’s not a lot of m-

Jon Zalar: But you can see sunlight through it if you’re s- down there.

Allen Hall: Okay. That’s not… Well, you should see. That’s not

Jon Zalar: good either. Yeah.

Allen Hall: Right. Okay. So in a, in a three millimeter situation then, you’re doing what? [00:08:00]

Jon Zalar: You’re trying to decide if the uptower solutions are something you wanna go try, ’cause they’re still in the trial mode from my understanding or-

Allen Hall: Okay …

Jon Zalar: people are learning a lot.

So I think when you get to that point, you’re calling some of those companies to say, “Hey, I have this issue. I got a couple blades with, you know, .3. Can you guy- you guys wanna come take a look at it, see if your solutions, if you guys wanna go use it or not?” And then I think the ones that get too bad, from my understanding right now, is they’re, they’re replacing the blades.

Allen Hall: So they’re taking the whole blade down.

Jon Zalar: Yes.

Allen Hall: And what’s the thought process in that? Uh, versus drilling out the inserts and putting new inserts in. Is there just a composite degradation that’s happened around those joints that it just puts it at risk or, or you have actually aged the blade much faster than you would otherwise have done?

Jon Zalar: I, I think they aged that particular connection too much. So I, I- Wow … either between the [00:09:00] fatigue or lack of epoxy resin, w- whatever the actual root cause is for that root insert coming out, when it gets that bad, it’s like you’re not gonna be able to inject enough To make it adhere

Allen Hall: You can’t de-age it.

Jon Zalar: Correct.

Allen Hall: Right?

Jon Zalar: Yeah.

Allen Hall: Bring back the youthfulness of the blade. Wow. All right. And we have seen this worldwide. I know in the, in the States you hear about it all the time, but it, this seems to be not a US- Correct … problem.

Jon Zalar: It’s a worldwide problem, yes.

Allen Hall: Okay. So if, if it’s a worldwide problem, are there more solutions on the way?

I know you talked about three of them already.

Jon Zalar: I have not heard of any other ones except those three as of today.

Allen Hall: Wow.

Jon Zalar: There could be other people working on it. I think there should be.

Allen Hall: So, yeah. You would think so, yeah. So we’ll, I guess we’ll eventually hear about it on the podcast. Usually people with technology will contact us.

They might call,

Jon Zalar: yeah. They might call you, they might call you tomorrow.

Allen Hall: Sure, they may. So that leads to sort of a subsequent issue, which I think is getting grouped together. So the [00:10:00] hub crack, pitch bearing crack, root insert pullout issue is also discussed with blade bolts being broken.

Jon Zalar: Correct.

Allen Hall: Are they related or are they separate engineering problems?

Jon Zalar: If you look at them individually, you’d probably come up with some separate answers, but if you combine them all together, you kind of start looking at is there too much loading happening in the leading and trailing edge of the blade? ‘Cause the hub cracks, the root inserts, and the blade bolts, from my understanding, are happening at those two highly loaded areas of the, the blade or that whole rotor connection.

So I mean, I do feel the root cause is probably a little higher loads than anticipated.

Allen Hall: I think everybody’s talked about when they’ve done the injection method and the drilling method, all they’re discussing is leading edge, trailing edge.

Jon Zalar: Yes.

Allen Hall: And how– It’s a question of how many- Correct … are you gonna replace.

So th- [00:11:00] that’s, those are the two highly loaded spots on the bolted connection.

Jon Zalar: Correct.

Allen Hall: And that’s where blade bolts are also breaking or, or the bolts breaking elsewhere around the periphery?

Jon Zalar: I don’t have all the data, but what I had seen, it’s very similar areas.

Allen Hall: So if you don’t pull the insert out, you’re then loading the bolt.

Cr- Right It’s one or the other, right? Right. Yeah. So the, the, the load path is the load path, so it’s coming through the insert into the bolt. Bolt’s carrying it into the pitch bearing. Pitch bearing’s carrying it into the hub.

Jon Zalar: Correct.

Allen Hall: Hub carrying it downtower. So eventually, one of those, uh, links in the chain is- The weakest.

Yeah … is, is the le- is the weakest. What is it about blade bolts that is so dangerous? We hear– we walk onsite to an O&M building, there are signs saying, you know, “Pay attention for loose bolts. Look around on the ground for loose bolts.” We’re gonna– and as electrical engineer, like, “Whoa.” Bolts should not be falling out of this tower.

What i- what is that sort of sequence where a [00:12:00] bolt would escape from the nacelle?

Jon Zalar: So let’s just use one bolt. One bolt breaks, falls in the hub, bouncing around, doing some– potentially doing some damage inside the hub. And ’cause these turbines, you don’t need to go out there every day ’cause they do run pretty good, right?

Right. You just do your regular maintenance. And if you don’t really know about that, ’cause, like, it bounces around for a while, then it usually gets, like, lodged behind a, uh, either center box or pitch cabinet or actually in the front sometimes. Kinda don’t know it happened. But, you know, frees itself up, keeps bouncing around, it, it could escape through the hatch covers ’cause, you know, people have to get into the hub anyway.

And I’m sure a lot of people listening here that have sites, like, you know, probably found some bolts laying on the ground, which is a little scary.

Allen Hall: Right. So is, is the busting the hatch opening levers? I know there, there’s a couple different ways to get into that hatch. Yeah. But, uh, is it just completely busting the hatch?

Yeah. So it’s– [00:13:00] okay. So you see a– so if you see a loose hatch panel, you have an issue. You probably gotta be careful about coming up on that turbine?

Jon Zalar: Potentially. A lot, a lot of hatches are, you know, not always maintained well.

Allen Hall: Right. I’ve seen them, I’ve seen loose ones, yeah.

Jon Zalar: Yeah.

Allen Hall: Okay. So that, that would be a sign that– but though if, if you’re approaching a turbine, one look on the ground.

And Yolando, you, you’ve seen a lot of turbines. So are you, are we looking on the ground and seeing what’s around the turbine before we approach the turbine now? Yeah. Just, just a sanity check?

Yolanda Padron: Yeah. Be aware also of what’s happening on site, right? Because if it’s some- if it’s a problem on site, you need to be extra careful when you’re approaching any turbine there.

Uh, is it something that people maybe should start thinking about implementing, like, a sensors earlier on than when they’re seeing the issue actually happen?

Jon Zalar: Yeah. I, I, I think that’s a potential, ’cause it, the quicker you catch it, the less damage you’re gonna do, and it also reduce the risk of [00:14:00] it, um, falling out of the hub And I’ve worked with a couple of my, uh, customers for some, like, potential ways to detect it.

Still kind of trialing it right now. But I, I do think there’s gonna be some benefit from a safety reduction, but also from a strictly a damage. ‘Cause, like, you get a couple bolts bouncing around there, and you bang up some cabinets or some pitch motors, that’s expensive and hard to go fix.

Yolanda Padron: Yeah, we were talking about it earlier too.

Like, it goes down, it can hit a transformer, it can hit, like, a truck or someone.

Jon Zalar: Chance of it hitting someone. Yeah. I mean, I don’t care what hard hat you have on, it’s not gonna do anything.

Yolanda Padron: Yeah.

Allen Hall: So what kind of sensor should you be putting onto the turbine if you don’t have access to the SCADA data or you don’t know what the correct algorithm is to suss out there’s something wrong up there?

But a, a bolt breaking is not gonna be something that a SCADA would even pick up, I don’t think. One bolt out of the whole- Yeah. No.

Jon Zalar: No way. Okay. I mean, there’s a– I think there’s, like, [00:15:00]one company looking at more of a, like, mechanical way to, like, prevent the bolt from coming out. I forgot the name of it.

Allen Hall: Okay.

Jon Zalar: Um, and then what I was looking at was more of a, like, you know, microphone type detection to kind of listen for that.

Allen Hall: It would make a lot of noise.

Jon Zalar: Yeah. It seems like it works. It, um, yeah, still more development needed on my end.

Allen Hall: So- The engineer in me was, is saying, “Why are we not putting strain gauges on bolts?”

I picked on the leading and the trailing. It’s like right dead center there to look at, even if it’s just two strain gauge bolts to see what the loads are.

Jon Zalar: So like there are s- there are bolts that are, or that are made with the strain gauges built in that you can use to go, you know, monitor that. But you also need to understand like what was the design intent.

So unless you’re working with the OEM, you don’t really know what you’re seeing is good or bad. You just say, “Oh-

Allen Hall: You just see a number.

Jon Zalar: Yeah. Right. I mean like, and if you install, I don’t know, four, you’d be like, “All right. Leading and trailing edge are higher [00:16:00] than the other two.” Well, yeah, it’s supposed to be, but like is a 10% difference expected or not expected?

Allen Hall: Is that something where if you’re, especially if you’re in a full service agreement, and a lot of these turbines are- Yeah … for the first couple of years, if you were to do that, it’s something you would just say to the OEM, “Hey, this is, these are the loads we’re seeing from the strain gauges on these bolts.

Does this make sense to you?” Or, or would an OEM just not even respond to that kind of inquiry?

Jon Zalar: I mean, I think it’s all about relationship with the OEM. I, I, I think

Allen Hall: it- I think they would wanna know.

Jon Zalar: I have a feeling they probably are looking.

Allen Hall: Okay.

Jon Zalar: I mean, ’cause I mean they have the test turbines too that they probab- that, that I know they have instrumented heavily.

Allen Hall: Yeah. So they, they’re probably getting at least some feedback. Th- that’s the problem. Yeah. And you worked on the other side, right? I have. So you worked for an OEM doing the RTAs. The first problem is you don’t have data, so now you gotta go get the data.

Jon Zalar: Correct.

Allen Hall: And that data is not available tomorrow. No.

‘Cause you’re gonna have to go run some sort of design of experiment to go figure out if [00:17:00] there is even a true problem or even what the root causes could be.

Jon Zalar: And it, and it’s expensive to go instrument a blade and get the data back at the right speed and connected to the turbine data. I mean, I rem- I, I used to say it’s about like 300 to 500,000 to go put a couple gauges on a blade just with all the equipment you need to get the data correct.

Allen Hall: To get the right data.

Jon Zalar: Get the right data at the right frequency connected to the controller. It’s, it’s very expensive.

Allen Hall: Wow. Okay. Yeah. I, I don’t, I don’t see a lot of operators doing that.

Jon Zalar: And especially connecting it to the operating data, right? So like if you go put a strain gauge and I don’t know, you’re curtailed, you’re only making, I don’t know, a megawatt- Doesn’t matter.

And if you don’t know what the turbine’s doing and you’re looking at this, like, strain gauge data, it’s really hard to correlate anything.

Allen Hall: So you need a full suite of data. Yeah. That includes weather data- Yeah … at some level, right? Gust winds and- Oh,

Jon Zalar: yeah …

Allen Hall: average wind speed. You need the anemometer. You need which, which way [00:18:00] the n- cell’s pointing.

Y- uh, you would need a lot of information- And what the controller’s- … to even suss it out …

Jon Zalar: and what the controller’s doing, right? Right. ‘Cause, like, every turbine, the controller’s trying to, like, you know, balance the rotor the whole time. It’s trying to, you know, micro pitch depending on what the winds are doing.

And if you don’t know what all that stuff’s doing, like, it’s really hard to correlate a strain gauge measurement to is that bad or not.

Allen Hall: It’s a complicated problem.

Jon Zalar: Yes. That’s why RCAs take, you know, a long time, and they’re not done in two weeks.

Allen Hall: No, they’re done in a year.

Jon Zalar: Yeah.

Allen Hall: Typically, or longer. So what should an operator be thinking about now?

If, if we s- get our drone images back, we’re scanning through them like, “Oh, there’s a crack” What am I doing next besides calling you and connecting to your LinkedIn page?

Jon Zalar: So right now with the pitch bearing crack, um, some of the OEMs are providing stiffener plates to put over the crack and try to run it.

Allen Hall: So that’s a doubler plate, basically. A double plate. Doubler

Jon Zalar: plate, yes. [00:19:00]

Allen Hall: Yeah. Okay. So even in a, in a crack scenario, that pitch bearing, if given mechanical support, can run like that?

Jon Zalar: That’s my understanding, yes. That, that potentially could run for some period of time. I don’t know if it’ll make it 20 years or not, but it’ll buy you time for sure.

Allen Hall: Does that involve a crane to do that work or is that just… My recollection, that was in pieces, like there, it’s not a ring, it’s a, a couple of pieces that you’d be able to bolt on without taking the-

Jon Zalar: No, it’s a- … blade down … it’s a, it’s a single piece that-

Allen Hall: It’s like a single casting kind of thing.

Jon Zalar: Right. And I, I think you need some like small crane, like a jig crane or one of those-

Allen Hall: Just to support the blade while you do it?

Jon Zalar: And to go put it in, right. Okay. Yeah, I don’t think, you’re not taking the blade off. You’re not taking the

Allen Hall: blade down.

Jon Zalar: Correct. Yeah. It’s, it’s done with the blade up there.

Allen Hall: Okay.

Jon Zalar: You’re putting new, putting longer studs in and putting the plate on.

Allen Hall: So first step is let’s get the joint reinforced. Right.

That’s the easy first step.

Jon Zalar: Right. Although there has been some cases where since [00:20:00]you’ve put that stiffener plate on, the loads get spread out to the end of the plate, and then you- Sure … you could see cracks there.

Allen Hall: Okay. All right. So the loads- It, that- … have to go somewhere …

Jon Zalar: loads have to go somewhere. That’s, that is a bottom line.

Allen Hall: All right. So you’re just changing where the load path is, so you have to be cognizant of that. Okay. Sure. Fine. But if you have, uh, especially in the United States, you don’t have 10 of these turbines, you have 50, 100- 100 … 200, 300 of these things, or thousands as it, as it turns out. Are there simple solutions that can be applied to, just to give me a sense, like that turbine’s having a problem, but the one next to it’s not, and, and just, just from a maintenance spin standpoint where I’m not just blanketing everything and trying to do everything to all these turbines at once, how do I, how do I manage this?

Jon Zalar: I, I think it’s like being very observant. So like, you know, making sure you’re looking at the pitch bearings from the drone images, right? Um, also talking [00:21:00] to your maintenance people like, “Hey, are, are you finding a bunch of broken bolts? Like, what positions?” Like, you know, if I was back at the OEM, I would like to have as much data as possible on this issue.

Like how many bolts are, when did you find them, what positions? A lot of times we, when I was there, like we would not get all that information, so it’s like really hard to run an RCA without that information.

Allen Hall: Sure. Yeah, where did this bolt break in the ring?

Jon Zalar: Right.

Allen Hall: Could tell you a lot. Is it just a b- bad lot of bolts, or is it something more load related?

Jon Zalar: Correct.

Allen Hall: Wow. Okay.

Yolanda Padron: Yeah, I think that’s a really good point, too, to make sure that you’re connected with like every stage of the operations. ‘Cause I know that everybody’s obviously really, really busy on a wind farm, but it’s really common for like an engineer to have certain data and the site team to just be running around and having a lot of data, but maybe they don’t realize that, oh, it’s important to know how many bolts per tower are coming down.

Jon Zalar: Correct. Yeah

Allen Hall: That’s a lot of work

Jon Zalar: It definitely-

Allen Hall: It’s a tremendous effort if you’re gonna [00:22:00] go after this problem and, and solve it RCS

Jon Zalar: are hard. They

Allen Hall: are. Yeah. All of it. Yeah. Machines are complicated today. There’s a lot of computer-driven s- things about them, and then you have these loading issues, and you have composite materials.

Th- there’s just, y-

Jon Zalar: you got to get- It’s a very complex

Allen Hall: It’s a machine, right? Yeah. It’s a complex machine. So how do people reach out to… You’re, you’re the head of IWTG, which is based in South Carolina, but you do consulting worldwide. Yes. And, and you are a huge resource because you understand the complexities of these problems.

How do people get ahold of you and, and get something started if they have a, a, a blade bolt issue or an insert issue or a cracked pitch bearing? Where do they start?

Jon Zalar: They can send me an email, jzalar@iwtgconsulting.com.

Allen Hall: Okay. And you have a great LinkedIn page, so you can connect with you on LinkedIn.

Jon Zalar: Yes.

Yeah, I have one

Allen Hall: of those. Yes. Or you could just come to WOMA in [00:23:00]2027. Yeah. You can. You can meet John there and, and arrange everything there. So John, it’s great to see you, and thank you for coming up. We, uh, we’re recording this at the world headquarters of Weather Guard Lightning Tech, and, uh, John just lives down the street in, in, in US terms.

Yeah. So it’s, it’s great to have John come and visit us up here in North Carolina. So John, thank you so much for joining us.

Jon Zalar: Thanks for having me. Appreciate it.

IWTG Consulting on Pitch Bearing Cracks, Loose Root Inserts

Continue Reading

Renewable Energy

The Divided States of America

Published

on

Trump’s (fairly successful) attempts to divide America are just a means to the end of staying in power so as to be able to continue to loot the U.S. treasury.

At this point, there are three essential factions in the United States:

  • A small number of extremely powerful billionaires
  • The MAGA base of white nationalist / hateful morons who believe that only Trump can save us from communism, racial impurity, and godlessness
  • Decent, educated people

The Divided States of America

Continue Reading

Renewable Energy

Faith and Reason

Published

on

People have been dancing around the faith/reason duality for more than 2000 years.  Aristotle worked out the rules of logic around 350 BCE, and Thomas Aquinas assumed the task of using them to prove the existence of God in the 13th Century CE. Descartes came along a couple of hundred years later, and made some improvements on all this, but we’re still left with very little.

As I told my nephew once when he was assigned a college paper on this, “You can’t have your metaphysical cake and eat it too. You either believe in things for which there is evidence, or you don’t.”

Moreover, as shown at left, faith runs headlong into logical inconsistencies.

Faith and Reason

Continue Reading

Trending

Copyright © 2022 BreakingClimateChange.com