Connect with us

Published

on

nickel

As demand for nickel rises, the Philippines can strengthen its role in the EV supply chain. However, a proposed ban on raw mineral exports could reshape its industry. At the same time, global trade tensions are adding uncertainty. New US tariffs on nickel imports, combined with an ongoing supply surplus, are keeping prices volatile.

While some experts predict that the long-term nickel price might increase as demand outpaces supply, near-term challenges remain. Can the Philippines capitalize on this shift, or will market instability hinder progress?

Nickel and Copper Demand Soars – Can the Philippines Capitalize?

The Philippines is the world’s second-largest producer of mined nickel. Copper and nickel both are essential for lithium-ion batteries used in electric vehicles (EVs). With the demand for these metals rising, the Philippines has a unique opportunity to become a key supplier in the EV supply chain.

But on February 3, Senate President Francis Chiz G. Escudero approved the measure to ban the export of raw minerals. 

He said,

“What we are looking at is to shift our policy from merely exporting raw minerals that will be utilized by other countries to produce higher value products, to developing our processing capabilities. This will result in added value for our minerals-related exports, provide a much-needed boost to our economy and generate employment for our people.”

Boosting Domestic Nickel Refining

If enacted, the ban will take effect in five years, giving mining companies time to establish processing plants. This policy shift is especially significant for key energy metals like nickel, which play a crucial role in the global battery and renewable energy sectors.

Escudero highlighted Indonesia’s 2020 ban on nickel ore exports as a successful example. He hopes that by processing nickel and copper within the country, the Philippines can become a major supplier of battery materials and a key player in the global EV industry.

He also believes that building a strong refining industry will create jobs, reduce dependence on raw material exports, and boost the economy. In the future, this could even help the Philippines manufacture its electric vehicles.

Challenges in Implementation

Mining groups are against a proposed export ban on ore, saying it will hurt the country’s mineral sector.

The Chamber of Mines of the Philippines (COMP) and the Philippine Nickel Industry Association (PNIA) support Senate Bill (SB) 2826 but disagree with the ban. The bill introduces a new tax system based on profits, but the groups believe stopping ore exports will cause problems.

They argue that mining companies cannot build processing plants within five years because of high power costs, poor transport systems, and conflicting local rules. The Philippines also has some of the highest electricity prices in Asia, making local processing too expensive.

They said, “Unless these issues are fixed, processing minerals locally will remain just a dream. There are no shortcuts.”

To make this plan work, the government must improve infrastructure, cut energy costs, and help mining companies build processing plants. Without these steps, the export ban could hurt the industries it aims to support.

Supply Surplus and Investment Risks

Even though the Philippines wants to boost its nickel industry, the global market already has too much supply. Big companies have secured their nickel resources, and experts at the Shanghai Metals Market (SMM) predict this surplus will grow even more in 2025 and beyond.

As this decision takes shape, the Philippines may face challenges in developing a strong local processing industry. With too much nickel already available, demand may not be high enough to make processing profitable. This could make it hard to attract big investors, slowing down the country’s plans to move from raw ore exports to processed nickel products.

Impact on China’s Nickel Supply

According to SMM, the Philippines exported 54 million metric tons of nickel ore in 2024. Out of this, 43.5 million mt went to China, while 10.35 million mt was sent to Indonesia.

If the Philippines decides to ban ore exports, China could face serious supply disruptions. The country relies heavily on Philippine nickel, especially after Indonesia tightened its mining quotas in 2024. A ban would likely create shortages, pushing China to look for other suppliers or invest in processing facilities within the Philippines to secure its supply.

china nickel

A Short-Lived Rally for Nickel Prices

So, what happened to nickel prices after the Philippine government’s announcement of considering banning nickel ore exports? Well, as reported by S&P Global, this news sparked optimism in the nickel market, helping prices climb back to $15,811 per ton on February 6. 

However, further gains were limited. Between February 7 and February 21, prices remained within the $15,400 to $15,800 range, and fears of worsening trade tensions loomed large.

lme nickel

The Larger Picture: How the U.S Tariff War is Shaping Nickel Prices?

S&P Global has provided deeper insights into how U.S. tariffs could affect nickel prices and the broader American nickel market. In January, the White House announced new tariffs on imports from Canada, Mexico, and China. Following this, nickel prices tumbled to a one-month low of $15,210 per ton.

In early February, President Trump signed executive orders imposing a 10% tariff on imports from China and an even higher 25% tariff on goods from Canada and Mexico. These tariffs took effect on February 4, keeping nickel prices on the London Metal Exchange (LME) below $16,000 per ton throughout the month. As trade tensions escalated, market uncertainty overshadowed concerns about a possible nickel ore export ban in the Philippines.

Canada quickly responded. Trudeau announced a 25% tariff on $155 billion worth of US goods, set to take effect the same day. But just before the deadline, the US government delayed tariffs on Canada and Mexico by 30 days, temporarily easing market concerns.

Will it Backfire on the US EV Industry?

If the US moves forward with a 10% tariff on nickel imports from Canada after the 30-day delay, it could drive up costs for American industries. Canada supplied nearly one-third of the US’s primary nickel imports in 2024, making it the country’s largest source.

The bigger challenge? The US produces very little nickel. The only nickel-producing mine is Lundin Mining’s Eagle Mine in Michigan. It contributed just 0.21% of global output in 2024 and is set to close before the decade ends. On top of that, the US lacks refining capacity for class 1 nickel, a key material for EV batteries.

If tariffs on Canadian nickel remain in place, it could become harder for US manufacturers to access affordable supplies, especially for the EV and stainless-steel industries. The US had expected to depend on Canada to meet its rising demand for battery-grade nickel.

However, trade restrictions might create challenges for this plan. It can also affect the competitiveness of domestic EV companies in the global market.

nickel canada U.S.

The Bottom Line

At present, the global nickel market remains volatile, affected by trade tensions, excessive supply, and evolving policies. All these factors are driving prices down. However, this dim nickel environment is expected to shift in the future.

nickel price

With a declining market balance and reduced oversupply, nickel prices are forecasted to rise. By 2030 and beyond, demand is projected to exceed supply, leading to a further price increase.

The post Philippines’ Nickel Export Ban and U.S. Tariffs: What’s Happening in the Nickel Market Now? appeared first on Carbon Credits.

Continue Reading

Carbon Footprint

Designing an Insetting Program: A Step-by-Step Playbook for Procurement

Published

on

Insetting program design starts with your supplier map. The carbon claim comes much later.

Consider a coffee procurement team that funds a farm intervention before checking its sourcing data. The supplier aggregates coffee lots from several regions. The buyer lacks farm-level traceability. Another purchaser expects to report the same outcome. A more attractive project brochure solves none of these problems.

If the distinction between a value-chain intervention and a purchased credit is still open, read CCC’s Insetting vs Offsetting guide before you set the brief.

Insetting program design begins with the purchasing relationship and works outward. You need to decide 1) where an intervention belongs, 2) what business problem it addresses, 3) who pays for it, 4) how results will be measured, and 5) what the evidence will let you say about them. This five-step playbook turns that sequence into a procurement plan.

Step 1: Insetting program design starts with supplier mapping

Start with the commodities that matter most to your Scope 3 inventory and sourcing continuity. Ask finance for spend by supplier, sustainability for the emissions baseline, and category managers for origin and volume records. Then identify which suppliers can trace material to a jurisdiction, sourcing region, producer group, or individual land-management unit.

The level of traceability affects what you can account for. Under the GHG Protocol Land Sector and Removals Standard, the spatial boundary for purchased land-based products depends on the traceability associated with each volume. Farm-specific factors or removals require physical traceability through an acceptable chain-of-custody model. A contract with a tier-one trader, by itself, does not establish a link to the farms behind its deliveries.[1]

Build a first-pass table with five columns: commodity and annual volume; supplier and origin; current traceability level; land-use and production risks; and the business owner who can change the purchasing terms. Mark missing data plainly. A blank cell is cheaper to fix before a program starts than after a claim is drafted.

If your company sets an SBTi Forest, Land and Agriculture target (FLAG), keep its land-related target boundary separate from energy and industry emissions. The current FLAG guidance also requires relevant companies to assess primary deforestation-linked commodities in their value chains.[2]

Step 2: Choose a commodity and jurisdiction for a pilot

Select one supply corridor where the sourcing connection can be established and procurement has a reason to stay. A useful pilot has repeat purchases, suppliers willing to share records, an intervention matched to a diagnosed problem, and a defined plan to measure the result. Carbon potential alone is a poor selection rule if the supplier cannot deliver the crop your business needs.

Compare candidate regions on land-use risk, supplier concentration, local rights and tenure, the availability of baseline data, and exposure to drought, erosion, or forest conversion. Check the relevant legal requirements separately. A nature project does not satisfy a due-diligence obligation merely because it has a carbon method attached.

Consider a coffee buyer sourcing from two districts. In the first, producer-group records identify the farms, while recent dry seasons have increased rejected green coffee lots. In the second, deliveries pass through several intermediaries and farm origins are unknown. Pilot shade management in the first district, with local agronomic advice and quality checks built into the plan. The buyer can trace purchases there and test the intervention against a defined sourcing problem.

Use a short decision memo to record why the selected corridor beats the alternatives, what remains uncertain, and what would stop the pilot. That memo is the first control against a project drifting toward whatever happens to photograph well.

Step 3: Design the supplier engagement and commercial model

The intervention needs an owner on each side of the contract. Decide who supplies planting material or training, who maintains the practice, who bears the cost if a harvest disappoints, and how long the buyer expects to purchase from participating suppliers. Where smallholders participate, budget cash flow and technical support for practices that offer a later return.

Put these terms in a supplier agreement or pilot addendum. It should cover eligible farms and volumes, consent to data collection, access for monitoring, any land or carbon rights that matter, benefit sharing, and what happens if the purchasing relationship ends. Ask local counsel and producer representatives to review the arrangement. The Accountability Framework is a useful reference for supply-chain work involving forests, ecosystems, and human rights.[3]

Avoid assigning an automatic carbon benefit to the buyer. The contract should say which party has the right to report each outcome, how overlapping claims will be checked, and how any issued credits will be handled. A reduction reported in a buyer’s inventory cannot simply be sold for someone else’s offset claim without an accounting review. SBTi FLAG guidance excludes purchased credits used as offsets from near-term FLAG target achievement.[2]

Set commercial measures beside environmental ones: delivered volume, rejection rate, supplier retention, and procurement cost. They tell you whether the program works as a supply-chain investment, even if carbon accounting takes longer to resolve.

Step 4: Build monitoring, reporting, and verification before rollout

Agree on the baseline and data flow before paying for a full rollout. Identify the land units or sourcing regions in scope, the practices that change, the records suppliers already keep, and the additional measurements the program requires. Decide which data can come from field visits, transaction records, or remote sensing, and who checks each source.

For carbon, separate three questions. Did the practice happen? Did emissions or removals change under an applicable method? Can the buyer attribute a defensible share to its purchased goods without double counting? The GHG Protocol’s 2026 guidance includes dedicated chapters on spatial boundaries, data and methods, evaluating actions, credited outcomes, and assurance.[1] These are distinct jobs. A photograph of a planted tree answers only part of the first.

CCC’s MRV and Additionality article explains the separate evidence questions a project reviewer will ask.

Create an evidence file for every reporting period: dated supplier and farm records, purchase volumes, methods and emission factors, uncertainty, quality checks, and changes from the baseline. Specify who can challenge the data and how corrections are recorded. If a project also seeks credit certification, keep project accounting and corporate inventory accounting separate. The GHG Protocol says its land standard focuses on entity-level inventories and does not set the rules for credit certification.[4]

Start with the minimum viable measurement design that can survive review. Add complexity when the pilot tells you which data actually changes a decision.

Step 5: Decide what can be reported and claimed

Insetting program design needs reporting rules before the marketing copy. Procurement, sustainability, finance, and legal should agree on four distinct outputs: operational performance; observed land or nature outcomes; inventory effects, if the accounting criteria are met; and any separately issued credits. One dashboard can display them, but they should not share a single unqualified headline.

SBTi FLAG guidance allows certain land-based removals within a company’s operations or supply chain to contribute to FLAG pathways, subject to criteria including permanence, traceability, data quality, and allocation. It does not allow purchased offsets to meet near-term FLAG targets.[2] Eligibility therefore depends on evidence and the applicable target rules, not on calling an activity “insetting.”

Draft a claims register. For each proposed sentence, record the period, boundary, data owner, calculation method, reviewer, and whether the result is measured, estimated, or still a goal. If the evidence supports only “we funded a pilot with 200 farms,” say that. Do not turn a funding fact into a verified emissions reduction.

What good looks like by year three

Treat year three as a review point, not a promised payback date. A mature pilot should have mapped participating supply volumes, a stable supplier agreement, a repeatable data collection process, and a comparison of commercial and environmental results against the baseline. It should also have a documented answer for outcomes that cannot be included in the buyer’s inventory.

Scale only where the pilot improves a sourcing decision and the evidence can follow the product. If neither condition holds, redesign the intervention or change the corridor. A disciplined program can conclude that a site is unsuitable. That is useful procurement intelligence.

Discuss your insetting program with CCC

Carbon Credit Capital designs nature-based supply chain investments around sourcing needs and measurable sustainability outcomes. Schedule a consultation with our carbon and sustainability experts to map your tier-one supplier network, FLAG exposure, and first pilot decision.

Sources

[1] GHG Protocol, Land Sector and Removals Standard, version 1.1, and companion Guidance, June 2026: https://ghgprotocol.org/land-sector-and-removals-standard ; https://ghgprotocol.org/land-sector-and-removals-guidance

[2] Science Based Targets initiative, Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, especially pp. 16–17, 37, and 41: https://sciencebasedtargets.org/resources/files/SBTiFLAGGuidance.pdf

[3] Accountability Framework initiative, Accountability Framework and guidance for companies: https://accountability-framework.org/

[4] GHG Protocol, Frequently Asked Questions: Land Sector and Removals Standard, questions 10 and 18: https://ghgprotocol.org/blog/frequently-asked-questions-land-sector-and-removals-lsr-standard

Continue Reading

Carbon Footprint

The Strategic Case for Nature-Based Carbon Investments

Published

on

Nature-based carbon investments deserve consideration when they address a specific business dependency and produce outcomes you can measure. Imagine Moonbucks, a global coffee roaster planning next season’s espresso blend. It is considering natural Grade 4 coffee from Jimma, in southwestern Oromia, Ethiopia. Its sourcing decisions affect the roasting schedule and the cash tied up in coffee purchases. Moonbucks needs to understand which measures could protect that supply, what they would cost and how it would judge the results.

1. Define the sourcing problem before choosing a project

Moonbucks needs a dependable component for its espresso blend. Its procurement team wants continuity of volume and an agreed cup profile. Replacing a shipment at short notice could require new sample approval and changes to the blend, and given the schedules for cultivation, processing, and freight delivery, is practically impossible. Moonbucks needs to get this right, and its initial concern is inconsistent deliveries. It commissions an assessment of the supplying farms and post-harvest chain. The questions cover land condition, harvest availability and whether drying or storage problems are affecting saleable lots.

This distinction changes the investment brief. A tree-planting proposal cannot be assumed to fix drying problems. Better storage cannot restore eroded land. The team must establish which problem exists before selecting the response.

CCC’s guide to finding nature-based solutions in your supply chain explains where to look. Here, the next task is to turn a broad concern into a testable proposal.

2. Develop nature-based carbon investments around the actual supply chain

The assessment would trace Moonbucks’ purchases back through the exporter and supplying producer groups. Which farms supply the contracted lots? Who controls land-management decisions? How long does the buyer expect to maintain the purchasing relationship?

Furthermore, Jimma natural Grade 4 cannot be treated as interchangeable with every Ethiopian coffee. Moonbucks would need to test any substitute against its own blend and quality requirements.

Suppose Moonbucks’ assessment identifies an opportunity to maintain shade trees and restore vegetation along exposed streambanks. The IPCC describes agroforestry as a way to store carbon in vegetation and soil, with potential benefits for erosion control and water quality.1 Moonbucks would need local advice on species, growing conditions and maintenance before deciding how these measures fit its sourcing plan.

The proposal now has a defined sourcing connection and a candidate intervention. The next steps are to test its effect on production, assess carbon eligibility and build the financial case.

3. Compare the proposal with other ways to protect supply

WBCSD’s Nature-based Solutions Blueprint recommends comparing nature-based options with other responses across their benefits and costs.2 For Moonbucks, that means evaluating the landscape proposal alongside drying improvements, storage controls and alternative sourcing arrangements.

The product’s natural-process designation matters. Moonbucks should examine the drying and dry-milling chain alongside land conditions. Its team would check storage practices, contamination risks and incoming-lot quality to see whether problems arise before or after the coffee leaves the farms.

The revised proposal might combine land stewardship with separate post-harvest controls. Each component needs its own purpose and budget. A sustainability label should not obscure which activity is expected to solve which problem.

The project develops as the evidence improves. Its scope should follow the diagnosis rather than preserve the first idea unchanged.

4. Establish what the carbon outcome could count toward

Moonbucks’ sustainability team now tests the proposed carbon case separately from the sourcing case. Is the objective a measurable change in Moonbucks’ value-chain emissions, verified credits for separate voluntary use, or distinct outcomes under carefully defined arrangements?

Scope 3 covers value-chain emissions. A purchasing relationship alone does not prove that a farm intervention can be included in Moonbucks’ inventory. The team needs an applicable accounting method, defensible boundaries and evidence supporting attribution.

SBTi’s FLAG Guidance (forest, land and agriculture), version 1.2, says purchased credits used as offsets cannot meet near-term FLAG or energy and industry targets. Eligible land-based removals are subject to accounting requirements.3 Moonbucks needs to test its proposal against those rules before including an outcome in its targets.

For Moonbucks’ Jimma proposal, maintaining existing trees and establishing new vegetation could involve different carbon questions. Specialists must examine the baseline and additionality, meaning what changes because the project proceeds. They must also assess measurement and the risk that stored carbon is lost. CCC’s MRV and additionality article introduces those tests.

Until that work is complete, Moonbucks should not budget an assumed Scope 3 reduction or credit-sale receipt. Direct emissions reductions remain the priority.

5. Build a financial case that survives weaker assumptions

Moonbucks’ finance team would now build a multi-year budget. UNEP’s State of Finance for Nature 2023 compares current finance with the investment needed to meet climate, biodiversity and land-restoration goals.4 The company would cost its proposed activities, farmer participation and ongoing monitoring. Verification, where required, is a separate expense. Maintenance and responsibility for replacing failed plantings must remain visible after the initial establishment budget ends.

Operational benefits need equally careful treatment. If fewer rejected lots reduce emergency purchasing, count that saving once. Do not add “supply resilience” as another financial benefit when it represents the same avoided cost.

Moonbucks should compare a base case with slower benefits, higher implementation costs and no carbon revenue. It should also distinguish production outcomes from quality and shipment outcomes. A single good harvest would not prove that the landscape intervention caused better delivery performance.

A project can remain worth funding even when its carbon case needs more work. That decision must rest on the operational evidence and the company’s objectives, without unsupported environmental claims.

6. Fund a pilot with a clear expansion decision

Moonbucks’ first approval would fund a bounded pilot, rather than commit the entire sourcing program. Before spending, Moonbucks would agree on participating farms, responsibilities and the evidence needed at review.

Its scorecard could track farmer participation, implementation costs and plant survival, alongside accepted coffee volumes and lot-quality results. Carbon measurements would follow the selected method. Farm-level traceability must connect the intervention to the actual sourcing relationship.

Suppose Moonbucks’ review later finds that storage changes explain most quality improvements, while the land measures need longer observation. Those findings would shape the next decision: expand the proven component, adjust the landscape work or pause further spending. They would not justify crediting all improvements to tree planting.

This gives nature-based carbon investments a practical place in a multi-year strategy. Funding increases as the evidence supports it, and the project can change direction before a larger commitment.

Discuss a sourcing opportunity with CCC

Carbon Credit Capital’s nature-based supply-chain investment service uses its Dual-Value Model to examine supply-chain economics alongside potential sustainability outcomes.

Schedule a consultation to discuss your sourcing exposure and the questions to resolve before allocating capital.

Sources

  1. Intergovernmental Panel on Climate Change (IPCC), Climate Change 2022: Mitigation of Climate Change, Chapter 7, Agriculture, Forestry and Other Land Uses, section 7.4.3.3 (Agroforestry).
  2. World Business Council for Sustainable Development (WBCSD), Nature-based Solutions Blueprint, 5 June 2024.
  3. Science Based Targets initiative (SBTi), Forest, Land and Agriculture Science-Based Target-Setting Guidance, version 1.2, March 2026, section 3.1.4, pp. 37–38.
  4. United Nations Environment Programme (UNEP), State of Finance for Nature 2023, 2023.
Continue Reading

Carbon Footprint

How to buy plastic credits, and what to check before you do

Published

on

A plastic credit funds the collection of plastic waste in places where no formal system exists to collect it. Each credit represents a measured, independently audited quantity of plastic taken out of the environment or returned to use, tracked on a public registry.

Continue Reading